Loading...
08SN0240~~tF~EI,p ~~:, ~~ti --~ ca~~'';. .v ~ ~ e,~ !' ~ ~~ ~ti, I rY~ ry ! ~;li ,~~~ t, -17 ~. J/i Ir~RGSI~1.P!!~ STAFF' S REQUEST ANALYSIS AND RECOMMENDATION 08SN0240 Super Radiator LTD Ptnshp. August 27, 2008 BS Clover Hill Magisterial District East line of Branchway and North Courthouse Roads RE VEST: Rezoning from Agricultural (A) to Light Industrial (I-1) of 9.6 acres plus proffered conditions on an existing 0.8-acre tract zoned Light Industrial (I-1). PROPOSED LAND USE: Office and industrial uses, except as restricted by Proffered Condition 4, are planned. PLANNING COMMISSION RECOMMENDATION THE PLANNING COMMISSION IS SCHEDULED TO CONSIDER THIS REQUEST ON AUGUST 19, 2008. STAFF WILL ADVISE THE BOARD OF THE COMMISSION'S RECOMMENDATION IN AN ADDENDUM TO THIS REPORT. STAFF RECOMMENDATION Recommend approval for the following reasons: A. As proffered, the proposed conform to the Northern Courthouse Road Community Plan which suggests the property is appropriate for light industrial and office/residential mixed use. B. The proposed zoning and land uses are representative of and compatible with existing and anticipated area development. (NOTE: THE ONLY CONDITION THAT MAY BE IMPOSED IS A BUFFER CONDITION. THE PROPERTY OWNER(S) MAY PROFFER OTHER CONDITIONS. Providing a FIRST CHOICE community through excellence in public service PROFFERED CONDITIONS 1. Utilities. The public waste water system shall be used. (U) 2. Timberin . Except for timbering approved by the Virginia State Department of Forestry for the purpose of removing dead or diseased trees, there shall be no timbering on the Property until a land disturbance permit has been obtained from the Environmental Engineering Department and the approved devices installed. (EE) 3. Access. Direct vehicular access from the property to Courthouse Road shall be prohibited. (T) 4. Uses. A. Uses to a depth of approximately two hundred fifty (250) feet from the Courthouse Road frontage shall be limited to Corporate Office (0-2) District uses. B. The following uses shall be prohibited: 1) Group care facilities. 2) Massage clinics. 3) Public or private parks, playgrounds and/or athletics fields. 4) Satellite dishes. 5) Communication towers. 6) A dwelling unit for the owner/operator of the business located on the property. 7) Funeral homes or mortuaries. 8) Hospitals. 9) Vehicle storage yards. (P) 5. Drama e. Post development drainage shall be retained on site at the 50 year post development rate and released at the 10 year pre development rate. (EE) GENERAL INFORMATION Location: East line of Branchway and North Courthouse Roads, across from Edenberry Drive. Tax IDs 742-705-4670, 5949 and 9954. Existing: A 2 08SN0240-AUG27-BOS-RPT Size: 10.4 acres Existin Land Use: Church use or vacant Adjacent Zoning and Land Use: North - 0-2 and I- l ;Office and industrial South and East - A; Public/semi-public (Church) West - R-15; Single-family residential T 1TTT ,TTTF.~ Public Water System: The public water system is available to serve the request site. There is an existing sixteen (16) inch water line extending along the east side of Branchway Road and along the east site of North Courthouse Road, adjacent to the request site. Use of the public water system is required by County Code. Public Wastewater S,, sue: There is an existing eight (8) inch wastewater collector line extending within an easement north of Oakcliff Avenue that terminates approximately 1,250 feet east of the request site. With the exception of a gap of approximately 275 feet, there is an existing sixteen (16) foot sewer easement left to facilitate extending the public wastewater system to this site and adjacent properties. The applicant has proffered to use the public wastewater system. (Proffered Condition 1) ENVIRONMENTAL Drainage and Erosion: The subject property drains to the east onto the adjacent property and then to a water quantity pond, a portion of which is located on Trinity Assembly of God Church and G.D. Package Machinery, Inc. This pond is in an easement constructed and maintained by Chesterfield County. There are no existing or anticipated on- or off site drainage or erosion pro ems. When designed, the storm water management facility did not include the entire property being developed commercially, therefore the applicant has addressed drainage concerns by proffering that this project will be designed so as to retain runoff onsite tat the 50-year 3 08SN0240-AUG27-BOS-RPT post development rate and release at the 10 year pre development rate. (Proffered Condition 5) The property is wooded and should not be timbered without obtaining a land disturbance permit from the Department of Environmental Engineering (Proffered Condition 2). This will insure adequate erosion control measures are in place prior to any land disturbance. PUBLIC FACILITIES Fire Service: The Courthouse Road Fire Station 20 and Forest View Volunteer Rescue Squad currently provide fire protection and emergency medical service (EMS). This request will have a minimal impact on Fire and EMS. Transportation: Based on light industrial uses, development of the property could generate approximately 600 average daily trips. This traffic would be distributed to Southlake Boulevard via Branchway Road or a commercial driveway. Southlake Boulevard had a 2006 traffic count of 12,000 vehicles per day and is functioning at a Level of Service A. Some of this traffic may travel through the intersection of Branchway Road and Southlake Boulevard. This intersection becomes extremely congested, especially during the afternoon peak hours, and drivers have difficulty turning left to travel towards the traffic signal at Courthouse Road and Southlake Boulevard. The queues from this traffic signal often back up past this intersection, making it difficult for drivers to exit Branchway Road onto Southlake Boulevard eastbound. The property aligns with Edenberry Drive at its signalized intersection with Courthouse Road. Due to the existing alignment of Branchway Road, adding a fourth leg to this signalized intersection to serve the property would be undesirable. The applicant has proffered to prohibit vehicular access from the property to Courthouse Road. (Proffered Condition 3) T,ANT~ TIFF Comprehensive Plan: Lies within the boundaries of the Northern Courthouse Road Community Plan which suggests the property is appropriate for light industrial and office/residential mixed use. Area Development Trends: Adj acent properties to the north are zoned Corporate Office (0-2) and Light Industrial (I-1) and are developed for office and industrial uses while adjacent properties to the south, east 4 08SN0240-AUG27-BOS-RPT and west are zoned Residential (R-15) and Agricultural (A) and are occupied by single- family residential and public/semi-public (church) uses. A mix of office/residential mixed use and industrial uses are expected to continue in the area as suggested by the Plan. Zonin H.~ istory: On February 25,1998, the Board of Supervisors, upon a favorable recommendation from the Planning Commission, approved Light Industrial I-1 zoning on property to the north which included a portion of the request property (Case 98SN0154). Development Standards: The request property currently lies within an Emerging Growth District Area. The purpose of the Emerging Growth District Standards is to promote high quality, well- designedprojects. Development must conform to the standards of the Zoning Ordinance, which addresses access, landscaping, setbacks, parking, signs, buffers, utilities and screening of outside storage areas. It should be noted the Zoning Ordinance required a minimum 100-foot buffer adjacent to the couthern property line. This requirement may be waved by the Planning Commission Burning site plan review and approval under certain conditions. CONCLUSION As proffered, the proposed conforms to the Northern Courthouse Road Community which suggests the property is appropriate for light industrial and office/residential mixed use. In addition, the proposed zoning and land uses are representative of, and compatible with, existing and anticipated area development. Given these considerations, approval of this request is recommended. CASE HISTORY Staff (8/12/08): The Commission is scheduled to consider this case on August 19, 2008. The Board of Supervisors, on Wednesday, August 27, 2008, beginning at 6:30 p.m., will take under consideration this request. 5 08SN0240-AUG27-BOS-RPT ,. QN ~ ~N 41 D ~2 2 C U' \ N O •~.... ~ ~ ...,, N ~~.. ,~..~~ ZJ '::::: ~:::::: '::~ ti ~::::: ~:::::~ .::::. I~ cL~ I ~ iCi~,a 1~ U U N w ~ z~cn ~ ~ D Z O V o ~ ~i ~ - ~ 000 ~aa o~~ N 0 J J Z y ~ Q N O LL ~n 0 0 0 O