Loading...
01SN0120-JAN24H.pdfJanuary 24, 2001 BS STAFF'S REQUEST ANALYSIS AND RECOMMENDATION 01SN0120 (AMENDED) Ambefleigh, L.L.C. Magisterial District Northwest quadrant of Hull Street and Gregorys Pond Roads ~__~._QUEST: (AMENDED) Rezoning from Residential (R-9), Community Business (C-3) and Corporate Office (0-2) to Community Business (C-3) and Residential Townhouse (R-TH) with Conditional Use Planned Development to permit exceptions to Zoning Ordinance requirements. PROPOSED LAND uSE: A mixed use development, to include residential, office and comtnercial uses is planned. PLANNING COMMISSION RECOMMENDATION RECOMMEND APPROVAL AND ACCEPTANCE OF THE PROFFERED CONDITIONS ON PAGES 2 THROUGH 7. STAFF RECOMMENDATION Reconm~end approval, subject to transportation, fire and capital facilities concerns being addressed, as discussed herein. This recommendation is made for the following reasons: Providing a FIRST CHOICE Community Through Excellence in Public Service. The proposed zoning and land uses conform with the requirements of the Route 360 Corridor Plan which suggests the property is appropriate for community mixed use and mixed use corridor use, to include shopping centers, other commercial and office uses and integrated residential projects of densities up to six (6) units per acre. The proposed zoning and land uses are representative of and compatible with existing and anticipated development along this portion of the Route 360 Corridor. The commercial n-act is located in the Route 360 Corridor Rural Transition Area, as designated in the Route 360 Corridor Design Guidelines. The Rural Transition Area is identified as an area with opportunities for unique development which maintains and enhances the rural and agricultural landscape character. The proffered conditions, Textual Statement, reinforce the goals of the Plan and the Design Guidelines. The proffered conditions do not adequately address the impact of this development on necessary capital facilities, as outlined in the Zoning Ordinance and the Comprehensive Plan. Specifically, the need for schools, parks, libraries, fire stations and transportation improvements is identified in the County's adopted Public Facilities Plan, FY 2001-2005 Capital Facilities Improvement Program and Thoroughfare Plan and the impact of this development is discussed herein. The proffered conditions do not adequately mitigate the impact on schools, capital facilities, thereby insur'mg adequate service levels are maintained and protecting the health, safety and welfare of County citizens. The proposal does not provide for a second public road access to the residential development, thereby insuring sufficient emergency access. The proposal fails to comply with the Route 360 Corridor Plan with respect to access to Route 360, as discussed in the Transportation Section of this "Request Analysis". (NOTE: CONDITIONS MAY BE IMPOSED OR THE PROPERTY OWNER MAY PROFFER CONDITIONS. THE CONDITIONS NOTED WITH "STAFF/CPC" WERE AGREED UPON BY BOTH STAFF AND THE COMMISSION. CONDITIONS WITH ONLY A "STAFF" ARE RECOMMENDED SOLELY BY STAFF. CONDITIONS WITH ONLY A "CPC" ARE ADDITIONAL CONDITIONS RECOMMENDED BY THE PLANNING COMMISSION.) PROFFERED CONDITIONS (STAFF/CPC) 1. Master Plan. In addition to the following conditions, the Conceptual Plan prepared by Balzer and Associates, Inc., dated 2 01SN0120/WP/JAN24H November 3, 2000, entitled "Amberleigh Conceptual Plan," and the Textual Statement dated November 3, 2000, shall be considered the Master Plan. With respect to the Conceptual Plan, relative to the residential development, the location of the dwelling units; open spaces, recreational areas, roads, accesses, driveways and parking areas need not be exactly as shown on the Conceptual Plan; however, the concepts of the Plan shall be generally adhered to such as the orientation of dwelling units to one another, to common parking areas, to open spaces and to spaces and to rights of way; landscaped setbacks, the orientation of dwelling units such that the number of garage doors opening to any individual street are minimized; the clustering of dwelling groups around common parking areas; and pedestrian links to the commercial development. (STAFF/CPC) (cPc) With respect to the Conceptual Plan relative to the commercial development, the location of the buildings, roads, accesses, driveways and parking area need not be exactly as shown on the Conceptual Plan; however, the concepts of the Plan shall be generally adhered to such as pedestrian links to the residential development; buildings surrounding courtyards; articulation of buildings to reinforce sense of entry; development of an east/west road through the project with associated pedestrian system, street trees, on-street parking and street lights; and parking aggregated to the rear or sides of buildings. (P) 2. The public water and wastewater systems shall be used. (U) Cash Proffer. The applicant, subdivider, or assignee (s) shall pay the following to the County of Chesterfield, prior to the issuance of a building permit, for infrastructure improvements within the service district for the property for each dwelling unit in excess of ninety-eight (98) units: The amount approved by the Board of Supervisors not to exceed $6,084.00 per dwelling unit adjusted upward by any increase in the Marshall and Swift building cost index between July 1, 2000 and July 1 of the fiscal year in which payment is made if paid after June 30, 2001. At the time of payment, the $6,084.00 will be allocated among facility costs as follows: $1,717.00 for schools, $773.00 for parks, $243.00 for libraries, $244.00 for fire stations, and $3,107:00 for transportation facilities if paid prior to July 1, 3 01SN0120/WP/JAN24H (STAFF/CPC (STAFF/CPC (STAFF/CPC 2001. Thereafter, such adjusted payment shall be prorated as set forth above. If any of the cash proffers are not expended for the purposes designated by the Capital Improvement program within fifteen (15) years from the date of payment, they shall be returned in full to the payor. (B&M) Storm Water Management Facilities or BMP's. Any open basins required for water quantity or quality control that are visible from public roads or from residences shall be landscaped or otherwise improved so that facilities become visual m~hancements to, and amenities for, the uses developed on the property. At the time of tentative subdivision review and site plan review, a plan depicting this requirement shall be submitted to the Planning and Environmental Engineering Departments for review and approval. (P & EE) Access to Hull Street Road. Direct access from the property to Hull Street Road shall be limited to two (2) entrances/exits. These accesses shall be located as generally shown on the Conceptual Plan. The exact location of these accesses shall be approved by the Transportation Department. (T) Right of Way Dedication. Special Access Street. In conjunction with the recordation of the initial subdivision plat or prior to any site plan approval, which ever comes first, a fifty (50) foot wide right of way for a special access street from Gregory Pond Road, through the property, to the western property line, shall be dedicated, free and unrestricted, to and for the benefit of Chesterfield County. The exact location of this right of way shall be approved by the Transportation Department. Gregory Pond Road. Prior to any site plan approval, thirty (30) feet of right of way on the west side of Gregory Pond Road, measured from the centerline of that part of Gregory Pond Road immediately adjacent to the property, shall be dedicated, free and unrestricted, to and for the benefit of Chesterfield County. (T) 4 01SN0120/WP/JAN24H (STAFF/CPC) Transportation Improvements. To provide an adequate roadway system at the time of complete development, the Developer shall be responsible for the following: Construction of additional pavement along the westbound lanes of Hull Street Road at each approved access and at the Gregory Pond Road intersection to provide separate right turn lanes, based on Transportation Department standards; Construction of additional pavement, along the eastbound lanes of Hull Street Road at the Gregory Pond intersection to provide an adequate left turn lane, as determined by the Transportation Department; Construction of a two (2) lane special access street from Gregory Pond Road to the western property line; Construction of a four (4) lane typical section (i.e. one (1) northbound lane and three (3) southbound lanes) for Gregory Pond Road/special access street at its intersection with Hull Street Road. The exact design for this improvement shall be approved by the Transportation Department; Full cost of traffic signal modification at the Gregory Pond Road/Hull Street Road intersection as required by the Transportation Department; Construction of additional pavement along the eastbound lanes of Hull Street Road at the site road that aligns the Lynchester Drive intersection ("site road") to provide an dual left turn lane as determined by the Transportation Department; Construction of a five (5) lane typical section (i.e., two (2) northbound lane and three (3) southbound lanes) for site road at its intersection with Hull Street Road; Full cost of traffic signal installation at the site road/Lynchester Drive/Hull Street Road intersection, if warranted as determined by the Transportation Department; and 5 01SN0120/WP/JAN24H (STAFF/CPC) (STAFF/CPC) (STAFF/CPC) (STAFF/CPC) 10. Dedication to Chesterfield County, free and unrestricted, of any additional right-of-way (or easements) required for the improvements identified above. (T) 11. Transportation Phasing Plan. Prior to any construction plan approval or site plan approval, whichever occurs first, a phasing plan for the required roadway improvements, as identified in Proffered Condition 7, shall be submitted to and approved by the Transportation Department. (T) Timbering Restriction. Except for t'unbering approved by the Virginia State Department of Forestry for the purpose of removing dead or diseased trees, there shall be no timbering on the Property until a land disturbance permit has been obtained from the Environmental Engineering Department and the approved devices have been installed. (EE) Office/Commercial Building Size Restriction. Other than one (1) single C-3 user (excluding any use permitted by right or with restrictions in the O-1 District) which may not exceed 60,000 gross square feet, no other individual C-3 user (excluding any use permitted by right or with restriction in the O-1 district) shall exceed 20,000 gross square feet. Individual buildings shall not exceed 15,500 gross square feet unless such building is designed to incorporate a variety of off-sets, other architectural variations or other features so as to avoid monotonous facades and bulky masses. (P) Recreation. There shall be no active outdoor recreation including docks provided within 400 feet of Gregory's Pond. This shall not preclude passive recreation such as benches, paths, gazebos, etc. within 400 feet of Gregory's Pond provided such uses are located so as to minimize their impact on adjacent properties. Signs shall be posted along the boundaries of the property adjacent to Gregory's Pond indicating "No Trespassing - Private Pond." The design of the signs shall be compatible with the residential character of the area. The exact design of the signs shall be approved by the Planning Department. The common area recreational amenities shall not include playground equipment, play fields or other facilities primarily associated with children's play. Adult facilities including, but not limited to, swimming pools, putting greens or shuffleboard shall be permitted. (P) 6 01SN0120/WP/JAN24H (STAFF/CPC) (STAFF/CPC) (STAFF/CPC) (STAFF/CPC) 12. 13. 14. 15. Drainage. All portions of the developed project area that drain directly or indirectly to Gregory's Pond shall not opt out of the Chesapeake Bay Act requirements. In addition, to the extent practical, drainage will be diverted away from Gregory's Pond. A drainage study shall be submitted to the Chesterfield County Environmental Engineering Department documenting that stormwater shall be retained on site based upon the post development 2, 10 and 100 year storm and the release rate shall be such that it will not cause the peak pre- development 2, 10 and 100 year storms for Gregory's Pond (as analyzed at the existing dam) to be increased. Stormwater shall be retained on site and released at the capacity of the existing culvert at Gregory Pond Road and Route 360 or improvements shall be made to the culvert to meet current VDOT criteria. (EE) Other than access to accommodate road improvements, there shall be no access to Gregory Pond Road until such time as Gregory Pond Road is improved in accordance with Proffered Condition 7.D. (T) Until such time as the project is fully developed and all initial occupancy permits have been granted, all exterior constmction activity shall be limited to between the hours of 6:00 am and 9:00 pm. This condition shall not preclude interior construction activity once the structure is enclosed by walls and a roof. (P) The emergency access shown on the Conceptual Plan shall be constructed prior to the issuance of more than fifty (50) building permits. In addition, prior to release of more than fifty (50) building permits, this emergency access shall tie into driveways or roads within the commercial tract so as to accommodate emergency vehicular movements from the R-TH tract to Route 360 via a driveway or road which connects to Gregory Pond Road. (F) 7 01SN0120/WP/JAN24H GENERAL INFORMATION Location: Located in the northwest quadrant of the intersection of Hull Street and Gregorys Pond Roads. Tax ID 751-688-8252 and 9232, 751-689-9218, 752-688-5413, and 753-688-2922 and 4302 (Sheet 10). R-9, 0-2 and C-3 Sige: 41.6 acres Existing Land Use: Single family residential or vacant Adjacent Zoning and Land Use: North - R-15 and A; Single family residential or vacant South - A, 0-2 and C-2; Public/semi-public (church), single family residential, office or vacant East - A and 0-2; Single family residential or vacant West - A; Single family residential or vacant UTILITIES Public Water System: There is an existing 24 inch water line extending along the north side of Hull Street Road, adjacem to the request site. In addition, there is an existing six (6) inch water line extending along the east side of Gregory Pond Road adjacent to the easternmost portion of the requests site. Use of the public water system is intended and has been proffered. (Proffered Condition 2) Public Wastewater System: Them is an existing twelve (12) inch wastewater collector extending along the south side of Gregory's Pond and terminating adjacent to the northern boundary of the request site. 8 01SN0120/WP/JAN24H Use of the public wastewater system is intended and has been proffered. (Proffered Condition 2) ENVIR~ Drainage and Erosion: The majority of the property drains north to Gregory's Pond. The southeast corner of the property drains toward Route 360 and then under either Gregory Pond or Hull Street Road to Falling Creek. There are no existing or anticipated, on- or off-site, drainage or erosion problems. To address potential drainage problems, the applicant has agreed to either enlarge the recently installed culvert at the intersection of Gregory Pond and Hull Street Roads or retain water on-site to ensure the existing pipes meet VDOT criteria. (Condition 12.C.) The applicant has proffered that, with the exception of timbering which has been approved by the Department of Forestry to remove dead or diseased trees, there will be no timbering until a land disturbance permit has been obtained from the Environmental Engineering Department (Proffered Condition 9). This will insure that proper erosion control measures are in place prior to any timbering and related land disturbance. Water Quality: A wide Resource Protection Area (RPA) and floodplain exist to the rear of the property along Gregory's Pond. The RPA cannot be disturbed except to accommodate water dependent uses. PUBLIC FACILITIES The need for fire, school, library, park and transportation facilities is identified in the Public Facilities Plan, the Thoroughfare Plan and the FY 2001-2005 Capital Improvement Program. This development will have an impact on these facilities. Fire Service: This property is currently served by the Manchester Fire/Rescue Station, Company Number 2 and Manchester Rescue Squad. When the property is developed, the number of hydrants and quantity of water needed for fire protection will be evaluated during the plans review process. The Public Facilities Plan indicates that emergency service calls are expected to increase forty-five (45) percent by 2015. Eight (8) new fire/rescue stations are recommended for construction by 2015 in the Public Facilities Plan. Based on forty-three (43) additional dwellings, this request will generate approximately seven (7) emergency calls for fire and 9 01SN0120/WP/JAN24H rescue services per year. The applicant has offered measures to assist in addressing the impact of this development on tim and rescue capital facilities. (Proffered Condition 3) The emergency access shown on the Conceptual Plan is not an acceptable substitute to satisfy the requirements of the Subdivision Ordinance. This requirement is to provide emergency personnel access to residents living in this development should an entrance become blocked. While the applicant has proffered conditions to insure a second access via private drives, the Fire Department does not support private drives as a second means of access. A public gas line runs generally east and west through the property. The setback of improvements from this gas line will be addressed at time of tentative subdivision and site plan review. Schools: Approximately twenty-four (24) school age children could be generated by this development. The site lies in the Providence Elementary School attendance zone: capacity - 750, enrollment - 627; Providence Middle School zone: capacity - 1,070, enrollment - 1,154; and Monacan High School zone: capacity - 1,750, enrollment - 1,524. This development will have impact on area schools. There are currently seven (7) trailers at Providence Middle School. The applicant has agreed to participate in the cost of providing for area school needs; however, the proffer does not fully address the impact of this proposal on school capital facilities. (Proffered Condition 3) Libraries: Consistent with Board of Supervisors policy, the impact of development on library services is assessed Countywide. Based on projected population growth, The Chesterfield County Public Facilities Plan (1995), identities a need for additional library space throughout the County. Taking into account the additional space provided by the two currently funded projects, the new La Prade and Chester Libraries, them is still a projected need for 55,000 additional square feet of library space Countywide by 2015. The development of this property would most likely impact library services in the La Prade service area. The new La Prade Library was identified as a need in the Public Facilities Plan based on projected cumulative growth. The applicant has agreed to participate in the cost of providing for area library needs. (Proffered Condition 3) 10 01SN0120/WP/JAN24H Parks and Recreation: The l~ identifies the need for two (2) new regional parks. In addition, there is a shortage of community park acreage in the northern area. The Public Facilities Plan identifies a need for 120 acres of community park space by 2015. This development will have an impact on parks and recreational facilities. The applicant has offered measures to assist in addressing the impact of this development on these facilities. (Proffered Condition 3) Transportation: The Master Plan subdivides the property into two (2) tracts; a residential townhouse (R- TH) tract and a commercial (C-3) tract. The textual statement limits development of the R-TH tract to 5.4 dwelling units per acre (Textual Statement II. G.). This proffer would allow development of 140 units within the R-TH tract. This request will not limit development of the C-3 tract to specific land uses; therefore, it is difficult to anticipate traffic generation from development of that tract. Based on townhouse and shopping center trip rates, development could generate approximately 9,940 average daily trips. These vehicles will be distributed along Hull Street Road (Route 360) which had a 1999 traffic count of 46,000 vehicles per day. The Route 360 Corridor Plan was approved by the Board of Supervisors in May 1995. The Plan recommends the development of several collector roads throughout parts of the Corridor, and identifies specific crossover locations along Route 360 that should be signalized. The Plan further recommends that Route 360 crossovers within the Corridor that are not identified for traffic signalization should be closed. Staff cannot support this rezoning request because the proposed access to Route 360 for this development is not in conformance with the Route 360 Corridor Plan. The Master Plan proposes construction of a road system that would focus most of the traffic generated by this development to the Lynchester Drive crossover on Route 360. As a result, it is anticipated that a traffic signal will be warranted at that crossover. Installing additional traffic signals along major arterials, like Route 360, increases traffic delays and results in mainline congestion. Therefore, the number of traffic signals along Route 360 should be minimized, as identified in the Route 360 Corridor Plan. The intersection of Gregory Pond Road and Route 360 is controlled by a traffic signal. As previously noted, the Route 360 Corridor Plan identifies specific crossovers along Route 360 which should be controlled by traffic signals. The Plan identifies Gregory Pond Road/Fordham Road crossover as one of those signalized intersections. The Plan further recommends that crossovers along the Route 360 corridor that are not recommended for signalization, should be closed. The Plan states that unsignalized crossovers on six (6) or more lane roadways generally do not function safely due in part to the time required to 11 01SN0120/WP/JAN24H cross multiple lanes against oncoming traffic, the stacking of vehicles in crossovers waiting for breaks in the traffic stream and the blocking of sight distance by on-coming traffic. Lynchester Drive, which is located on the south side of Route 360 opposite the property, is served by an existing crossover. The Plan recommends that the closing of the Lynchester Drive crossover should not occur until alternative access to a signalized intersection is provided for existing developments that are served by this crossover. The proposed site access ("Site Access Road") that aligns the Lynchester Drive crossover could be designed with a raised island within the access to restrict left turn movements at the crossover. This alternative design would allow the crossover to continue to serve the existing development on the south side of Route 360 in accordance with the Route 360 Corridor Plan, and not cause this crossover to require signalization as a result of this proposed development. The major access for this proposed development could be provided via the existing signalized crossover on Route 360 that serves Gregory Pond Road. The Thoroughfare Plan, as amended by the Route 360 Corridor Plan, recommends an east/west collector road on the north side of Route 360, extending from Gregory Pond Road, west to the Oxbridge Road intersection. The applicant has proffered to dedicate a fifty (50) foot wide right of way for a special access street from Gregory Pond Road through the property, in accordance with that Plan (Proffered Condition 6. A.). The applicant has also proffered to dedicate thirty (30) feet of right of way measured from the centerline of Gregory Pond Road, in accordance with the Zoning Ordinance. (Proffered Condition 6. B.) The C-3 tract must be developed in accordance with the Zoning Ordinance, relative to access and internal circulation (Division 5). Access to major arterials, such as Route 360, should be controlled, l~ne applicant has proffered that direct access from the property to Route 360 will be limited to two (2) entrances/exits, as generally shown on the Conceptual Plan (Proffered Condition 5). Additional access from the property to Route 360 is anticipated to be provided via Gregory Pond Road. Mitigating road improvements must be provided to address the traffic impact of this development. The applicant has proffered to: 1) construct additional pavement along Route 360 at each approved access and at the Gregory Pond Road intersection to provide separate right turn lanes; 2) construct additional pavement along eastbound lanes of Route 360 at the Gregory Pond Road intersection to provide an adequate left turn lane; 3) construct two (2) lanes of an east/west special access street from Gregory Pond Road to the western property line; 4) construct a four (4) lane typical section for Gregory Pond Road at its intersection with Route 360; 5) full cost of traffic signal modification at the Gregory Pond Road/Fordham Road/Route 360 intersection; 6) construct additional pavement along the eastbound lanes of Route 360 at the site road access intersection to provide dual left turn lanes; 7) construct a five (5) lane typical section for the Site Access 12 01SN0120/WP/JAN24H Road at Route 360; and 8) full cost of traffic signalization at the Site Access Road/Lynchester Drive/Route 360 intersection, if warranted. (Proffered Condition 7) The Th u hfare P1 identifies the need to improve existing roads, as well as construct new roads to accommodate gro~h. Area roads need to be improved to address safety and accommodate the increase in traffic generated by this development. The applicant has proffered to contribute cash towards addressing this impact for each townhouse unit constructed in excess of ninety-eight (98) units. (Proffered Condition 3) The applicant is requesting modification to current Zoning Ordinance requirements that all residential townhouse lots front on a public street, or have access via a common right of way within 500 feet of a public street. As requested, the applicant will be required to construct all streets which accommodate general traffic circulation within the R-TH tract to Virginia Department of Transportation (VDOT) standards (Textual Statement II.D.). By having these streets accepted into the State Highway System, it will insure their long term maintenance. The condition allows staff to approve private streets within this residential development, if it is determined that they cannot ye designed to State standards. If staff approves any private streets, the condition also re£tres the developer to provide a plan for their continual maintenance. The applicant is unwilling to modify the proposed access from the property to Route 360 in accordance with the Route 360 Corridor Plan. Without this commitment, the Transportation Department cannot support this request. 13 01SN0120/WP/JAN24H Financial Impact on Capital Facilities: PER UNIT Potential Number of New Dwelling Units 43' 1.00 Population Increase 118.25 2.75 Number of New Students Elementary 11.18 0.26 Middle 5.59 0.13 High 6.88 0.16 TOTAL 23.65 0.55 Net Cost for Schools 154,499 3,593 Net Cost for Parks 34,787 809 Net Cost for Libraries 10,922 254 Net Cost for Fire Stations 10,965 255 Average Net Cost for Roads 139,836 3,252 TOTAL NET COST 351,009 8,163 *Based on a limit of units less those permitted prior to his rezoning request. (Textual Statement, II., G.) As noted, this proposed development will have an impact on capital facilities. Staff has calculated the fiscal impact of every new dwelling unit on schools, roads, parks, libraries and fire stations at $8,163 per unit. The applicant has been advised that a maximum proffer of $7,800 per unit would defray the cost of the capital facilities necessitated by this proposed development. The applicant has offered an amount less than the maximum acceptable amount. (Proffered Condition 3) Note that circumstances relevant to this case, as presented by the applicant, have been reviewed and it has been determined that it is appropriate to accept the maximum cash proffer in this case. The Planning Commission and the Board of Supervisors, through their consideration of this request, may determine that there are unique circumstances relative to this case that may justify acceptance of proffers below the value of the maximum acceptable amount. 14 01SN0120/WP/$AN24H LAND USE Comprehensive Plan: Lies within the boundaries of the Route 360 Corridor Plan which suggests the property is appropriate for community mixed use and mixed use corridor uses. Specifically, the Plan supports community-scale development, to include shopping centers, other commercial and office uses and integrated residential projects of densities up to six (6) units per acre along the Route 360 frontage. The Plan supports mixed uses to include residential developments incorporating high quality architectural features and site amenities using cluster designs to maintain open space at densities up to six (6) units per acre orth of the Corridor. Area Development Trends: Area development is characterized by a mix of commercial, office and agricultural zoning and land uses along the Route 360 Corridor. Area development north and south of the corridor is characterized by residential zoning and land uses. The route 360 Corridor Plan anticipates construction of a collector road connecting the Oxbridge Road and Gregory Pond Road/Fordham Road intersections to provide existing and future development with access to signalized intersections, and to accommodate travel between adjacent areas along the Corridor without requiring the use of Route 360. This proposal incorporates the mixture of uses suggested as appropriate by the Plan in the vicinity of this collector road and the Gregory Pond Road/Route 360 intersection. Zoning History: On May 23, 1984, the Board of Supervisors, upon a favorable recommendation from the Planning Commission, approved rezoning and Conditional Use Planned Development (Case 84S049) to permit a mixed use development on most of the subject property. Specifically, the approval allowed for construction of a shopping center and office uses along Route 360, with two family dwelling units tot he north. Tiqe commercial and office tracts were to the designed in a "Village" style with small buildings cluster around green spaces. On July 24, 1985, the Board of Supervisors, upon a favorable recommendation from the Planning Commission, approved rezoning and an amendment to Case 84S049 on a portion of the request site. (Case 85S052). This amendment accommodated the possibility of construction of a typical strip shopping center. 15 01SN0120/WP/JAN24H Site Design: Overall: The applicant has submitted a conceptual plan depicting commercial and office development fronting on Hull Street Road, as well as on both sides of a special access road that rum through the property generally parallel to Hull Street Road. The plan further depicts residential development behind the commercial and office uses. Two (2) accesses are shown to Hull Street Road. In addition, an emergency access is shown between the commercial/office tract and the residential tract. Sidewalks are shown on both sides of all roads which provide general circulation through the development. Within the residential tract is also shown a community area that is centrally located within the development. Landscape setbacks are shown to provide separation from the residential development to the adjacent single family residential homes and vacant agricultural properties. (Proffered Condition In response to concerns of area residents, the applicant has proffered conditions that address the location of active and passive recreation areas with respect to their proximity to Gregory's Pond; limitations on access to Gregory Pond Road until certain road improvements are made; and a limitation on hours of exterior construction. (Proffered Conditions 11, 13 and 14) Commercial Tract: The C-3 tract lies within the Hull Street Road Emerging Growth Area and is also located along that portion of Hull Street Road subject to the requirements of the Zoning Ordinance for the Route 360 Highway Corridor District (Rural Transition Zone). Redevelopment of the site or new construction must conform to the applicable Zoning Ordinance standards which address access, parking, landscaping, architectural treatment, setbacks, signs, buffers, utilities and screening of dumpsters and loading areas. Within the Rural Transition Zone, special development standards would apply to any nonresidential development on the request property. These standards require special landscaping within parking areas; pedestrian links between uses; articulation of buildings to reinforce sense of entry; the provision of open space; the arrangement of commercial buildings to form a courtyard; and the architectural treatment of commercial buildings. The applicant has incorporated several of these design elements into this proposal. In addition, the applicant has included that any open basins be improved so that they will become visual enhancements (Proffered Condition 4). The Textual Statement addresses general requirements for the entire development relative to locations of the street trees and sidewalks which are to be 16 01SN0120/WP/JAN24H provided (Textual Statement I A. & B.) The applicant plans to develop this project with a "village character". The village standards of the Zoning Ordinance allows improved, designated parking spaces in public rights of way to be counted toward the required number of parking spaces, under certain circumstances. To enhance the village character, on-street parking is proposed. The Textual Statement would allow these spaces to be counted toward the required spaces (Textual Statement III.i.). At the time of site plan review for any development on the request property, consideration must be given to how these requirements, as they apply to this site, would be accomplished. In order to create a development that meets the spirit and intent of the Route 360 Corridor Design Guidelines, the applicant has agreed to limit the size of buildings in the C~3 portion of this development. (Proffered Condition 10) Residential: Within the R-TH area, the Textual Statement and Conceptual Plan will allow construction of "cluster-type" residential units. Street trees, sidewalks and other amenities are proposed consistent with standards required for similar developments in the County. While the applicant is requesting exceptions to the development standards of Residential Townhouse (R~TH) developments, the proffered conditions and Textual Statement provide measures to achieve superior design quality and housing sustainability for the residential portion of this proposal. Architectural Treatment: Commercial: Based on current Zoning Ordinance requirements, architectural treatment of buildings, including materials, color and style, must be compatible with buildings located within the same project. Compatibility may be achieved through the use of similar building massing, materials, scale, colors and other architectural features. Current Ordinance requirements state that no building exterior which would be visible to any A, R, R-TH or O District or any public right of way may consist of architectural materials inferior in quality, appearance, or detail to any other exterior of the same building. There is, however, nothing to preclude the use of different materials on different building exteriors, but rather, the use of inferior materials on sides which face adjoining property. No portion of a building constructed of unadorned concrete block or corrugated and/or sheet metal may be visible from any adjoining A, R or R-TH District or any public right of way. No 17 01 SN0120/WP/JAN24H building exterior may be constructed of unpainted concrete block or corrugated and/or sheet metal. Currently, all junction and accessory boxes except those not visible from beyond the project must be minLm'~_ed from view of adjacent property and public rights of way by landscaping or architectural treatment integrated with the building served. Mechanical equipment, whether ground-level or rooftop, must be screened from view of adjacent property and public rights of way and designed to be perceived as an integral part of the building. Residential: With respect to the architectural treatment in the R-TH tract, the Textual Statement requires that the style of dwelling units and materials be similar to the attached elevations. The elevations depict a variety of housing styles which complement each other (Textual Statement II., E.). The applicant has also agreed to limit the height of dwelling units, in response to concerns of area residents. Buffers and Screening: Currently, the Zoning Ordinance requires that solid waste storage areas (i.e., dumpsters, garbage cans, trash compactors, etc.) be screened by a masonry or concrete wall which is constructed of comparable materials to, and designed to be compatible with, the principal building that such area serves, solid wall, fence, dense evergreen planting or architectural feature. Currently, the Ordinance precludes the servicing of such areas within 1,000 feet of any A, R, or R-TH Districts between 9:00 p.m. and 6:00 a.m. In addition, sites must be designed and buildings oriented so that loading areas are screened from any property where loading areas are prohibited and from public rights of way. With the approval of this request, outside storage would be permitted as a restricted use in the C-3 portion of this development. Outside storage areas must be screened from view of adjacent properties which have no such areas and public rights of way. The Zoning Ordinance will require a minimum 75 foot buffer along the boundary between the C-3 and R-TH zoning. This buffer would be required on the C-3 property unless modified at the time of site plan review. It should be noted that the Conceptual Plan fails to accommodate this buffer requirement. While it may be appropriate to allow reduction of the buffer to accommodate a better integrated project, special design measures should be employed to insure compatibility between the residential and commercial uses. At the time of site plan review, the Planning Commission may modify this buffer under certain circumstances. 18 01SN0120/WP/JAN24H While there is no requirement to provide a buffer between the R-TH property and adjacent agriculturally zoned property, the applicant, in response to concerns of adjacent property owners has agreed to provide twenty-five (25) and fifty (50) foot landscaped setbacks adjacent to these parcels. Further, tree retention is required in some areas. (Textual Statement II. J.) CONCLUSIONS The proposed zoning and land uses conform to the Route 360 Corridor Plan which suggests the property is appropriate for community mixed uses and mixed use corridor uses, to include shopping centers, other commercial and office uses and integrated residential projects having densities up to six (6) units per acre. In addition, the proposed zoning and land uses are representative of, and compatible with, existing and anticipated development along this portion of the Route 360 corridor. The request property is located in the Route 360 Corridor Rural Transition Area. The Rural Transition Area is identified as an area with opportunities for tmique development which maintains and enhances the rural and agricultural landscape character. The proffered conditions, Textual Statement and requirements of the Zoning Ordinance further ensure land use compatibility with area development and development consistent with the Route 360 Corridor Plan. However, the proposal fails to fully address the impact on capital facilities and Transportation and Fire Departments' concerns, as discussed herein. If these concerns could be adequately addressed, approval of this proposal would be appropriate. CASE HISTORY Applicant (11/8/00): The application was amended, as discussed herein. Applicant (11/15/00): Amended proffers and Textual Statement were submitted. Planning Conmaission Meeting (11/16/00): At the request of the applicant, the Commission deferred this case to December 19, 2000. 19 01SN0120/WP/JAN24H Staff (11/17/00): The applicant was advised in writing that any significant new or revised information should be submitted no later than November 27, 2000 for consideration at the Commission's December 19, 2000, public hearing. Also, the applicant was advised that a $250.00 deferral fee must be paid prior to the Commission's public hearing. Applicant (11/20/00): Amended proffered conditions were submitted. Applicant (11/30/00): At the request of staff, amended proffered conditions and Textual Statement were submitted. Applicant (12/15/00): Revised Proffered Conditions 11 and 12 and revisions to the Textual Statement were submitted. The deferral fee was paid. Planning Commission Meeting (12/19/00): The applicant accepted the recommendation. There was no opposition present. There was support present. The applicant agreed to submit an additional proffered condition in an attempt to address the Fire Department's concerns relative to provision of a second access into the residential portion of the project. Mr. Gulley indicated that he was satisfied that the additional proffered condition (Proffered Condition 15) would result in provision of an adequate second means of access for emergency vehicles; that until the road proposed by the Route 360 Corridor Plan is completed between Gregory Pond Road and Oxbridge Road, there is a need for the Lynchester Drive/Route 360 crossover to remain open; and that there has been evidence on similar residential proposals indicating that the impact on capital facilities is not the same as a conventional single family dwelling. 20 01 SN0120/WP/JAN24H On motion of Mr. Gulley, seconded by Mr. Marsh, the Commission recommended approval of this request and acceptance of the proffered conditions on pages 2 through 7. AYES: Unanimous. The Board of Supervisors, on Wednesday, January 24, 2001, beginning at 7:00 p.m., will take under consideration this request. 21 01SN0120/WP/JAN24H TEXTUAL STATEMENT R~OUEST: AMBERI,ER.:H, L.L.C November 3, 2000 Clover Hill Magisterial District Northwest Quadrant ofllull Street Road and Gregory's Po id Road Rezoning l~om Residential (R-9), Commumty Business (C-3) and Corporate Office (0-2) to Community Business (C-3) and Residential Townhouse (R-TH) witl', Conditional Use Planned Dc',clopmm~t to pem~it excq:iiions to standards in RcsidcntiM Iownl~ousc (R-TH) and Commm~ity Business (03) District. General Rcouirements. A. Sidewulk~. A sidewalk shall be provided along both sides ol'mat, ls and drives ~,hat a~ommodatc general traffic ckculation through thc ¢cvclopmcnt aa generally shown on the Conceptual Plan. Sidewalk2. shall also be prw,~ed 1o otl~er u~es wi~in the p~ojec~, such ~ the commerdal and recreationaI area a.s well as future development. The exact desil~:~, treatment and location of thc sidewalk shall be approved by thc Pl~fing Department at the time of tentative ~ubdivision plan review end sit :i plan review. B. Street Trees, ~ Street trees sl~all be installed along both ~ide~ of an) roads and drives which accommodate general .:farine circulatkm through the dcvelopmcnt. Retained trees along these roads and dr,~ve$ may bc ,;!~.~tmtcfl reward tiffs requirem¢:rt. '[he ?la,ming Department, at the time ~f site or tentative subdivision plan ~eview, shall approve a conceptual !andscapin4g plan. The exr, et location, spacing, si:~e mad species of plantings shall be appro.,ed by the Planning Department prior to site plan aptmwal ,r thc ~¢¢ordation of the subdivisSon plat. Residential To~,-ahouse required mmditlon.s. Except a~ utatcd he~'ein, the requirement~ oi~the Zoning Ordinance I~)r thc R-TH District shall be applicable. N~'~ building shml bc located closer th,'m five (5) f¢~et to thc j:ffopel~y line which is od. intent to any road which is 4,esigned to ~ccommodate ge~eral trafli~ ui.,-¢ulation 4. nb~le~gh, L.L.C. Page 6 o['9 No'i'ember 3, 2000 Bo F duough the de'~eKp e t ~ .)r cl )sec .hun I ye [5) feel m an) other property' line where UlliB are not attached. Drives ond Parkine Area~. i.) Concrete curb and gutter shall be installed along the ~rives, roads and parking areas which accommodate general ;raffle ci~x:ulation through the development. (NOTE: This condition will itel require mstaltatioa -~ .; curb ;~nd gutter along driveways serving individual ~uildings unless necessary for:p~'oper drain:age, as determined by Enviroamental Engineering.) ii.) Thc requirement that private driYew-ays and parking Brea~ be setback at least fifteen (15) feet from the righl of way of any e',iisting or proposed public road stroll be eliminated. Group or row design i.) The maximum number id'attached units shati be ii.) If'units arc attached, variation in setbacks !~om right~ of way shall be achieved t:-,xough recessing a portion of eaoh dwell[:!g facing ~he right of way in lieu of varying the setback of each unit. Frontage ~m Public S : .. All roads which accommodate general traffic circulation tr.:hugh thc development ~halt be designed ,and constructed to state ~tandards and tak~in into the state sys;em. This condition may ~ modified by the Transporta:ion Deparlmem if it is deleratined that the renu tlr m~y part of such ro~,~ds cannot l:k designed for state acceptance. For any nmds which accommodate general tra.{~ic circulation tt;ougtt tl~c dc¥ctopmcut thai are not to be a part of the ~tate system.! a plan that insures the co.ntinual maintenance of the private streets ~hall be submitl~d to, mtd appmve,A by the Transportation Depamnent. The architectural treatmem of dwelling nnits, including m~:erials and style, shall be similar to the elevations and lis! labeled as Exhibit Landscaping. I.andscaping shall bc provided around the perimeter of all t,i~i]dings, between buildings rind driveways, within medim~s, ~d within comm~m areas not ~ccupied by mc~ational t~cilities or o~r structure~, l,and~ing s!}atl ~mply with the rcq airemcnts of the Zoning O~in~ce S~tions ! 9-5 t 6 ~mBgh 19-518(~. Landscaping shall be designed to: minimize lhe Fredomimr'~ce oFbuikling mass aad paved areas; define private sp~.e~; and air, anco the resi~cn~tial charamvr of ~le dzvzlopmcnl. Thc Pta~ing ~em, at the time oF~em ~tive plan review, shall approve a conceptual landscaping plan Final ]and~capinfl Jcsign showing the exact nmnbem, spacing, arrangement ~d ~pecie~ cf plantir ~ ~all be appawed by Am'be~leigh, L.L.C. Page 7 of 9 Nc vembcr .~, ,.000 the PlamfinE. Department '~.rior w~ the re!ease of a b,~ilding ~: ~rmi~ l~)r arv dwelling Density. Development shait not exceed ~ dcnsiW of 5,4 dwelling un[l:~ per acre. Recrcatiorml Area Required. i.) An area 0F 1.5 ~re~ convemently accessible to, and incl~ed w~thin, the development shall ~ provided fi~r a~vc ~d pas~tw, recreational uses by the occults. ii.) A cmranuni~ pavilion area shall be located and po!,ition~ to provide a "f~al point" as one enters ~c project from Ibc main~tr~ce, ~ identified on ~e Con~plua} Plan as the "Clubhouse". Tho coriununlty pav~l m area sh~l have a mnfimam (~[' 1~80(I ~oss square feet. A ~pa~ t on structure having a mi~fimum areu o1' 1,200 gros~ squ~c fcct st'~all be provided within · e commnnity pavilion area. The pavilion s~ucture ~ay eiiher ~ opened ur enclosed , but *~o~ned It shall have ~ r~of. Thc pavilion st~cturc shall have an architec tm'al sty le compatib c with the re~s'Id~nt~a~- ' dcvclopmcm. Compatibility may be achieved ~ou~h ~e use of sin:Jl~ building m~msing, materials, scale or t>ther ;~chitectumt features. Surround'ng ~e pavilion structure, an area s~.all be "hardseaped" and have beuches and oth~r ~enities ~at ~co~vMate and Ihciti~!e gatherings. A phasing plum IBr the constructMn of these facilities st~ll be ~provcd by ~c Planning Dcp~tmcnl prior to tinat tentative subd~vi:;~on plan approval P~king fbr thc paY~lion ~ca shall be pro~ided With ;~ mimmum of [~ve (5) spaces, Cu~ ~d gtmcr shall be provided along ~e ~rive and parking area which sc~'es f~c pavilion area. Fence Heieht .F..xception. An), fence loc;~ted in any y~rd shall not exceed a height ofs~even (7) feet. Landscaped Setbacks. A. £'wcnty-fivc (25) foot trod fif',y (50) fi;at landscaped Setbacks shall .be provided, as shown on the conceptual plan. Except :!s specified herein, the landscaped setbacks shall consist of a landscaped bcm~ or landscaping. Landscaping shall meet one and one-half times "I,ar,d. seapc C', as defined in the Zoning Ordinance. : B Within th~: fifty (50) ft~ot landscaped setbat;k adjace~ i~. to Tax ID 952-688- 5193 and 8494; and 752-689-3600, 4206 m~d 6407, 31 existing trees having a caliper at'eight (g) inches m' g:'ealer shall in,~ maintuined, cmless removal is app*x)ved by the Planning Commission al the time of tenlatlxe subdivision review. This vegetation shrill be suppler.qented where necessary zo minimize visibility' of the project fi'om '~e aOtjacent iqmperties with additional landscaping and/or bem~ing. Tkc exact landscaping or bermi,ag shMl be approved at the time of tentative s~- bdivision pl,-~t review. Arnbelleigh, I,.I..C. Page ~ of 9 Nn,!cmbcr 3, 2000 HeiKht. Dwelling milts stroll not exceed a h¢ighl oi'lwo {2) ~tories or llfir~ (30) t%¢L w]ucheYer is less. IlL Cor~mmni~' B~a~ing.ss (C-3) Rcquircd Uonditions. Exccp*, ~s s~cd herein~ ~he req~kemenls of the (C-3) Dis~H,:t shall be appllcahle. i.) Parking, The required number of p~urking spaces may be redu,ied by ten (10) percenl. Improv~ designated peaking spaces in a p.iblic right of way may be counted tovmrd thc ~equ;.rcd number of parking s!mces when more Ihnn one-Ndf of each such space adjoins thc site. ii ) Strecttiuhtinu. Streetiighting ~ha]l be provided along both sides of ~ ~e e~t/west special access atree: and tt~e access road which atign~ with I ~'ncl'.cstur Drive. Streetlight fixtures, pole~ and lamp types shall be co.~sistent. Selected streetlights shall be ora design in keeping wi~h tl~.¢ ,~ mall-scale, pedestrian- oriented character ora village. F~al ~tection shall Dc made prior 1o site plan a?pmval. Fixtt.tre mounting heights slmll be ~ a human scale. Thc exact height and spacing shall be delpm~ined ut th.e lh~e of site plan review. : Please do not hesi:at~ to contact me with at~y questions or conunents ali 7.9, t20571. Sinccrciy, DALZER AND ASSOCIATES, INC. 'XMS,Mdi Amherleigh, I,.I,.C. Page 9 of 9 No,~embcr 3, 2000 EXHIBIT A AMBERI EIGH TYPICAL CONSTRUCTION PRODUCTS: Roofing: Asphalt Shingles Exterior Siding Products: Cement siding such as Hardie Plank l r ck Ven er Stone and artificial stone Cedar shingles and cedar look like products "Drivit and"stucco look like products such as Stuccato Window Products: Clad or Vinyl Low E, Argon filled Foundations: Brick veneer Poured concrete Conditioned crawl space Driveways: Concrete Asphalt Sidewalks: Concrete The objective is to create iow maintenance exteriors which are aesthetically pleasing and complementary with respect to colors and products. This project has been selected to be a demonstration project under DOE's Build America Program. As such products will be selected which are environmentally friendly, sustainable, and energy efficient. Consquently substitutions of products may be made from the above list as new and better products are identified. tAshford-?ront-Tudorl SECOND FLOOR 'EXHIBIT A SECOND FLOOR I Ashford-Side-Cape I Nook EXHIBIT A ] glakely-Court-CapeI SECONDFLOOR Dining · FIRST FLOOR EXHIBIT A l Easton-Side-Tudor I SECOND FLO0~ Family FIRST FLOOR EXHIBIT A I~°sem°nt-CzOurt~Cape Di~in0 ~ FIRST FLOQ~ . EXHIBIT A 1 Rosemont-Side-Tudor [ Kit, then Nook Living Oinin~ Bedroom .".':77:. :-; -- Entry. EXHIBIT A A A Z¢ A V C C-5 +6o~o A 0 600 Feet 01SN0120 (AMENDED) REZ: ~.'=,i R-9, 0-2 & C-3 TO R-TH ~ R-9, 0-2 & C-3 TO C-3 C.U.P.D. ON ALL Sheet #: 10 N ZONING ZONING / P/~OPOSED ZONING LINE / ! HULL STREET ROAD N 50' LANDSCAPE 25' LANDSCAPE f ACCESS HULL STREET ROAD o/$hlO IZO-Z Transportation Plan Route 360 Corridor Existing or proposed signalized intersections. Thoroughfare Plan N Proposed collector roads (60' right-of-way) With approval of the County Transportati~Sn ..Department, pr vate drives may be acceptable in lieu of collector roads in these areas. OISNOIZO-.3