02SN0201-June26.pdfJune 26; 2002 BS STAFF'S REQUEST ANALYSIS AND RECOMMENDATION 01SN0201 (Amended) DuVal investments, Inc. Matoaca Magisterial District Off the west line of Elko Road REQUEST: (Amended) Rezoning t¥om Agricultural (A) to Residential (R-88). PROPOSED LAND USE: A single family residential subdivision is planned. The applicant has agreed to limit development to a maximum of fifty-nine (59) lots yielding a density of approximately 0.44 units per acre. (Proffered Condition 3) PLANNING COMMISSION RECOMMENDATION ACKNOWLEDGED THE WITHDRAWAL OF THE CONDITIONAL USE PLANNED DEVELOPMENT. RECOMMEND APPROVAL AND ACCEPTANCE OF THE PROFFERED CONDITIONS ON PAGES 2 AND 3. STAFF RECOMMENDATION Recommend denial ~t'or the following reason: A. The application fails to address the Thoroughfare Plan with respect to the construction of a proposed North/South Arterial that bisects the subject property. (NOTE: CONDITIONS MAY BE IMPOSED OR THE PROPERTY OW2'4ER MAY PROFFER CONDITIONS. THE CONDITIONS NOTED WITH "STAFF/CPC" WERE AGREED UPON BY Providing a FIRST CHOICE Community Through Excellence in Public Service. BOTH STAFF AND THE COMMISSION. CONDITIONS WITH ONLY A "STAFF" ARE RECOMMENDED SOLELY BY STAFF. CONDITIONS WITH ONLY A "CPC" ARE ADDITIONAL CONDITIONS RECOMMENDED BY THE PLANNING COMMISSION.) PROFFERED CONDiTiONS (CPC) 1. The applicant, subdivider, or assignee(s) shall pay the following to the county of Chesterfield at the time of building permit application for infrastructure improvements with in the service district for the property: $7,800.00 per dwelling unit, if paid prior to July 1, 2002; or The amount approved by the Board of Supervisors not to exceed $7,800.00 per dwelling trait adjusted upward by any increase in the Marshall and Swift building cost index between July 1, 2001, and July 1 of the fiscal year in which the payment is made if paid after June 30, 2002. In the event the cash payment is not used for which proffered within 15 years of receipt, the cash shall be returned in full to the payor. (B & M) (CPC) 2. Except for timbering approved by the Virginia State Department of Forestry for the purpose of removing dead or diseased trees, there shall be no timbering on the Property until a land disturbance permit has been obtained fi:om the Environmental Engineering Department and the approved devices installed. (EE) (CPC) 3. A maximum of fifty-nine (59) lots may be developed on the property. (P) (cPc) 4. Dwelling units shall have a minimum gross ftoor area of 2100 square feet. (P) (c?c) All exposed portions of the foundation of each dwelling shall be covered with brick or stone veneer or drivit t32oe materials. (P) (CPC) The fifty (50) foot buffers required in accordance with the Subdivision Ordinance along both sides of the North/South Arterial shall be located within recorded open space. (P) (cpc) A pedestrian connection shall be provided from the Property to the school property. The exact location and treatment shall be approved by the Parks and Recreation Department. This pedestrian connection shall be in addition to those sidewalks provided in accordance with the Conmaission's Residential Sidewalk policy. (P & R) (CPC) In conjunction with the recordation of the initial subdivision plat, a ninety (90) foot wide right-of-way and any additional right-of-way to cross Swift 2 01 SN0201-JUNE26-BOS (CPC) 9. (CPC) 10. Creek for the north/south arterial ("North/South Arterial") through the property, shall be dedicated, free and unrestricted, to and for the benefit of Chesterfield County. The exact location and width of this right-of-way shall be approved by the Transportation Department. (T) Direct access from the property to North/South Arterial shall be limited to four (4) public roads, as generally shown on Exhibit A. The exact location of these accesses shall be approved by the Transportation Department. (T) To provide an adequate roadway system, the developer shall be responsible for the following: Construction of two (2) lanes of North/South Arterial, to VDOT Urban Minor Arterial Standards (50 mph) with modifications approved by the Transportation Department, from the southern property line northward for a distance of approximately 2000 linear feet, as generally shown on Exhibit A. The exact length of this road shall be approved by the Transportation Department. In addition, a cash payment of $200.00 per linear feet shall be provided to Chesterfield County towards construction of the section of the North/South Arterial from the northern terminus of the developer's construction of the North South Arterial to the northern property' line; Construction of additional pavement along North/South Arterial at each approved access to provide left and right turn lanes, if warranted based on Transportation Department standards; and Dedication to Chesterfield County, free and unrestricted, any additional right-of-way (or easements) required for the improvements identified above. (T) (CPC) 11. Prior to any construction plan approval, a phasing plan for the required road improvements, as identified in Proffered Condition 10, shall be submitted to and approved by the Transportation Department. (T) GENERAL INFORMATION Location: Off the west line of Elko Road, north of Vinewood Drive. Tax ID 784-629-7820 (Sheet 41). Existing Zoning: A Size: 135 acres 3 01SN0201-JUNE26-BOS Existing Land Use: Vacant /~diacent Zoning and Land Use: North - A; Single family residential or vacant South - A; Public School (new Matoaca High School) East - R-88 and A; Single family residential or vacant West - A; Vacant Public Water System: UTILITIES There is a twelve (12) inch water line now under construction in conjunction with the new Matoaca High School, approximately 2,300 feet south of this site. This twelve (12) inch water line extends along the Matoaca High School access road. The request site is within the Southern and Western Area Land Use Plan area which requires use of the public water system. Use of the public water system is required by County Code. The applicant is committed by recorded sales agreement (D.B. 3289, Pg. 611) to pay their proportionate share of the cost of extending an off-site sixteen (16) inch water line along Woodpecker Road from Bixby Lane to the access road at the new Matoaca High School. This sixteen (16) inch water line was designed to serve the new Matoaca High School as welt as the applicmrts' site. The developer's share of the water line cost is to be made to the County at such time as the applicant sells any portion of the request site, or a request is made for comrection to public water. Public Wastewater System: The public wastewater system is not available to serve the request site. The request site is within that portion of the Southern and Western Area Land Use Plan area that permits the use of private septic systems. Use of private septic systems is intended. Private Septic System: To date, the Health Department has not received any soils analysis lbr the property. Prior to recordation of the subdivision plat, the developer must submit soils analysis for each lot to the Health Department for review and approval. 4 01SN0201-JUNE26-BOS ENVIRONMENTAL Drainage and Erosion: There are currently no on- or off-site erosion problems. The property is heavily wooded and, as such, should not be timbered until the issuance of a land disturbance permit. This will ensure that proper erosion control measures are in place prior to any timbering. (Proffered Condition 2) Water Quality: The property is bounded by Switk Creek to the north and by an unnamed pere~mial stremn to the east. The property drains into Swift Creek or the adjacent permmial stream. It should be noted that these perermial streams are subject to I00 foot conservation areas. PUBLIC FACILITIES The need fbr fire, school, library, park and transportation facilities is identified in the Public Facilities Plan, the Thoroughfare Plan and the FY 2002-2007 Capital Improvement Program. This development will have an impact on these facilities. Fire Service: Based on a maximum of fifty-nine (59) dwelling units, this request will generate approximately twenty-one (21) calls fi>r fire and rescue service each year. The impact on these facilities has been addressed. (Proffered Condition 1) This property is currently served by Fire Station 12 in Ettrick. Emergency medical service is provided by Fire/Rescue Station 8 and Ettrick-Matoaca Volunteer Rescue squad in Matoaca. When the property is developed, the number of hydrants and quantity of water needed for fire protection will be evaluated during the plans review process. Currently, the Subdivision Ordinance requires that when the ctmmlative total of homes served by a local street exceeds fifly (50), a second public road access to all dwellings be provided or that a no lot frontage collector road be constructed through the development. This requirement is necessary to provide emergency vehicles a second access to homes should one (1) access become blocked. The proffered conditions relative to the construction of the North/South Arterial lhils to satisfy the requirements of the Subdivision Ordinance fbr a no lot frontage road through the development since the construction terminates south of the northem property line. (Proffered Condition 10.a.) 5 01SN0201-JUNE26-BOS Schools~: Approximately thirty-one (31) school age children will be generated by this development. The site lies in the Ettrick Elementary School attendance zone: capacity - 650, enrollment - 536; Matoaca Middle School zone: capacity - 720, enrollment - 523; and Matoaca High School zone: capacity - 820, enrollment - 685. This development will have an impact on area schools. The applicant has agreed to address the cost of providing for area school needs. (Proffered Condition 1) Libraries: Consistent with Board of Supervisors' policy, the impact of development on library services is assessed County-wide. Based on projected population growth, the Public Facilities Plan identifies a need for additional library space throughout the County. Taking into accom~t the additional space provided by the two (2) currently funded projects, the new La Prade and Chester Libraries, there is still a projected need for 55,000 additional square feet of library space County-wide by 2015. The impact on library needs has been adequately addressed. (Proffered Condition l) Parks and Recreation: The Public Facilities Plan identifies the need for four (4) new regional parks. In addition, there is currently a shortage of community park acreage in the County. The Plan identifies the need for 625 acres of regional park space and 116 acres of community park space by 2015. The Plan also identifies the need for neighborhood parks and special purpose parks and makes suggestions for their locations. The applicant has offered measures to assist in addressing the impact of this proposed development on these Parks and Recreation facilities. The department remains interested in development of a system of linear parks/open space along Swift Creek as recommended in the Southern/Western Area Plan. The applicant addressed this need in a approved prior zoning proffer; however, additional acreage was added beyond the desired linear property along the creek. This additional acreage did not represent a viable development approach and did not address the impacts of this zoning case. A combination of land dedication and cash proffers, as first suggested by the Department, would best address the impacts of the proposed development, should the applicant offer proffers styled in this manner. The applicant has proffered the provision ora pedestrian connection from this development to the new Matoaca High School to facilitate access to future areas of activity (Proffered Condition 8). This sidewalk would be in addition to those provided in accordance with the Commission's Residential Sidewalk Policy. 6 01 SN0201-JUNE26-BOS Transportation: The applicant has proffered a maximum of fifty-nine (59) lots (Proffered Condition 3). Based on single family trip rates, this development could generate approximately 640 average daily trips. These vehicles will be distributed through the adjacent property to the south (site of the new Matoaca High School) to Woodpecker Road, wltich had a 2000 traffic count of 3,937 vehicles per day. The Thoroughfare Plan identifies a north-south major arterial ("the North/South Arterial"), with a recommended right of way width of ninety (90) feet, extending through the property. Staff does not support this zoning request, because the applicant is unwilling to commit to providing the entire North/South Arterial through the subject property. The North/South Arterial is a proposed major north-south roadway for this area of the County. The road is plm~ned to extend from River Road, north to Branders Bridge Road. The site of the new Matoaca High School is located south/south-east of the subject property. As part of Substantial Accord approval for the new school, conditions were imposed that required the dedication of a ninety (90) foot wide right of way, and construction of two (2) lanes for the North/South Arterial through the school property. The ninety (90) toot wide right of way has been dedicated across the eastern end of that property, and school administration is committed to its construction. This right of way stubs into the southern boundary of the subject property. The centerline of Swift Creek Ibrms the northern boundat3, of the subject property. The applicant has proffered to dedicate a ninety (90) foot wide right of way and any additional right of way to cross Swift Creek for the North/South Arterial. (Proffered Condition 9) The applicant is not willing to provide for the construction of the North/South Arterial through the entire length of the subject property. The applicant has proffered to construct two (2) lanes of North/South Arterial from the southern property line, north fbr a distance of approximately 2,000 feet, as generally shown on Exhibit A (Proffered Condition 10.a.). This proffer does not provide fbr the construction of approximately 250 feet of the North/South Arterial at the northern boundary of the subject property and across part of Swift Creek. Constructing the North/South Arterial across Swift Creek will require a substantial structure, probably a bridge. As an alternative to constructing this section of the North/South Arterial, the applicant could provide fm~ds to the County for the total cost of the construction including the cost for a section of the bridge that is within the boundary of the subject property. These funds could later be applied towards constructing the entire bridge structure for the North/South Arterial across Swift Creek. The applicant has proffered to contribute $200.00 per linear foot for the section of the North/South Arterial that will not be constructed by the developer. These funds are not sufficient to cover the cost of the futm:e bridge section. Access to major arterials, such as the North/South Arterial, should be controlled. The applicant has proffered that direct access to this road will be limited to four (4) public roads, as generally shown on Exhibit A (Proffered Condition 9). The applicant has also proffered 7 01SN0201-JUNE26-BOS to construct left and right tutu lanes along the North/South Arterial at each approved access, if warranted based on Transportation Department standards. (Proffered Condition 10.b.) The Thoroughfare Plan identifies the need to improve existing roads, as well as construct new roads to accommodate growth. Area roads need to be improved to address safety and accommodate the increase in traffic generated by this development. The applicant has proffered to contribute cash towards mitigating this traffic impact. (Proffered Condition 1) Since adoption of the Thoroughfare Plan in 1989 by the Board of Supervisors, staff has consistently recommended that roads identified on the Plan be constructed through the entire bom~dary of each proposed development. Without a commitment to provide for the entire construction of the North/South Arterial through the subject property, the Transportation Department cannot support this request. Financial Impact on Capital Facilities: PER UNIT Potential Number of New D~vetling Units 59* 1.00 Population Increase 161.07 2.73 Number of New Students Elementm'y 14.40 0.24 Middle 7.67 0.13 High 9.44 0.16 TOTAL 31.51 0.53 Net Cost for Schools 212, t64 3,596 Net Cost for Parks 47,908 812 Net Cost for Libraries 16,638 282 Net Cost for Fire Stations 18,585 315 Average Net Cost for Roads 168,917 2,863 TOTAL NET COST 464,212 7,868 *Based on a proffered maximum number of fifty-nine (59) lots. (ProfI'ered Condition 3) As noted, this proposed development will have an impact on capital facilities. Staff has calculated the fiscal impact of every new dwelling unit on schools, roads, parks, libraries and fire stations at $7,868 per unit. The applicant has been advised that a maximum proffer of $7,800 per unit would 8 01SN0201 -JUNE26-BOS deft:ay the cost of the capital facilities necessitated by this proposed development. Consistent with the Board of Supervisor's Policy, and proffers accepted from other applicants, the applicant has offered cash to assist in defraying the cost of this proposed zoning on such capital facilities. (Proffered Condition 1) Note that circumstances relevant to this case, as presented by the applicant, have been reviewed and it has been determined that it is appropriate to accept the maximum cash proffers in this case. LAND USE Comprehensive Plan: Lies within the boundaries of the Southern and Western Area Plan which suggests the property is appropriate for residential use of 1 to 5 acre lots, suited fbr Residential (R-88) zoning. Area Development Trends: Properties to the north, south and west are zoned Agricultural (A) and are occupied by single family dwellings, public/semi public uses (new Matoaca High School) or are vacant. Property to the east is zoned Agricultural (A) and Residential (R-88) and has been developed for single family residential uses or remains vacant. It is anticipated that residential development will continue in this immediate area, consistent with the ?lan. Density: The applicant has proffered a maximum of filly-nine (59) tots may be developed on the property yielding a density of approximately 0.44 un/ts per acre (Proffered Condition 3). The Residential (R-88) District requires that each lot contain a minimum of 88,000 square feet, except the minimum area for lots which do not front on a major arterial may be reduced to 65,340 square feet. Likewise, if such lots are served by public water and sexver, the minimum lot area may be reduced to one (1) acre. The R-88 District Standards provide a calculation to derive the number of reduced-size lots that would be permitted. This calculation permits one-half (1/2) of a unit to the acre for net developable acreage (excluding land areas constituting roads, limits of the base flood areas and resource protection areas), and includes bonus provision, or additional lots, for land area permanently preserved as open space. The applicant has indicated the development wilt be designed with lots having a minimum lot size of 65,340 square feet. The applicant has provided that permanent open space will be provided as required by the R-88 District standards. The subdivision layout and design, including the nfinimum lot areas and these open space calculations, are reviewed during the County's approval of the subdivision plats. 9 01SN0201-JUNE26-BOS Dwelling Size and Architectural Treatment: The applicant has proffered a minimum gross floor area of 2,100 square feet (Proffered Condition 4) and to address the treatment of exposed portions of the dwelling tbmadations. (Proffered Condition 5) Buffers: The Subdivision Ordinance requires that a fifty (50) fbot buffer be ~naintained along each side of the proposed NorttffSouth Arterial. This buffer may be included within the boundaries of individual lots. It has been staff's experience that individual homeowners tend to clear these areas resulting in a zoning violation on that individual lot. To preserve the integrity of these buffers, the applicant has proffered that these areas be provided in open space, thereby becoming the responsibility of the homeowners' association. (Proffered Condition 6) CONCLUSIONS The request complies with the Southern and Western Area Plan which suggests the property appropriate for residential use of 1 to 5 acre lots, suited for Residential R-88 zoning. However, the application fails to address the Thoroughfare Plan with respect to the entire construction of a proposed North/South Arterial that bisects the s ubj ect property. Given these considerations, denial of this request is recommended. CASE HISTORY Planning Commission Meeting (8/21/01): The applicm~t accepted the Plm~ning Commission's recommendation. There was opposition present. The individual in opposition expressed concerns relative to increased traffic on Woodpecker Road; the need to address improvements on this road; tack of notification of non-adjacent property owners of meetings on this case; lack of time to review modifications to proffered conditions. There was discussion relative to the proposed North/South Arterial; the County's policy with respect to developers building portions of Thoroughfare roads located within their property; the construction costs associated with the North/South Arterial through the subject property, including the creek crossing; and the alternative of providing funds to the County to cover the cost of this construction at a future time. Mr. Gecker expressed reservations in acting on this case due to neighborhood concerns. 10 01SN0201-JUNE26-BOS Messrs. Gulley and Cunningham expressed concern relative to the transportation network. Mr. Marsh indicated the proposed development should be one of quality, would blend well with the neighborhood and was comfortable moving forward with the application. Mr. Litton indicated that he was also comfortable acting on this request. On motion o£Mr. Marsh, seconded by Mr. Litton, the Commission recommended approval of this request and acceptance of the proffered conditions on pages 2 through 4. AYES: Messrs. Marsh, Litton and Cunningham ABSTENTIONS: Messrs. Gecker and Gulley Matoaca District Supervisor, Area Citizens, Applicant and Staff (9/17/01): A meeting was held to discuss the proposed rezoning. Concerns were expressed relative to the requested "R-25" zoning classification with proffered conditions limiting density and lot sizes in lieu of the "R-88" zoning classification, as suggested by the Plan. Board of Supervisors' Meeting (9/26/01): On their own motion, the Board defen'ed this case to their October 24, 2001, meeting to allow time for further discussions with concerned citizens. Matoaca District Supervisor, Concerned Citizens, Staff and Applicant (10/15/01 ): A meeting was held to discuss the proposal. There were discussions concerning the possible amendment of the application and therefore a possible request to remand the case to the Commission. Applicant (10/23/01): The application xvas amended to request a Conditional Use Planned Development to permit exceptions to Zoning Ordinance requirements in an Agricultural (A) District. Board of Supervisors' Meeting (10/24/01): At the request of the applicant, the Board remanded the case to the Planning Commission. 11 01SN0201-JUNE26-BOS Area Property Owners, Applicant, Matoaca District Supervisor and Staff (12/4/01 ) A meeting was held to discuss the amended proposal. Concerns were expressed relative to the proposed park land, access through the school property and house sizes. Concerns were also expressed that the application was not for R-88 zoning. It was generally agreed that there would be further discussion with area property owners, the applicant and the Matoaca District Commissioner. Planning Commission Meeting (12/18/01): At the request of the applicant, the Commission deferred the case to March 19, 2002. AYES: Unanimous. Staff (12/19/01): The applicant was advised in writing that any new or revised information should be submitted no later than January 14, 2002, fbr consideration at the Commission's March 19, 2002, public hearing. Also, the applicant was advised that a $150.00 deferral fee must be paid prior to the Commission's hearing. Board of Supervisors' Meeting (12/19/0 t ): The Board removed the case from their agenda because the Planning Commission had not acted. Applicant (1/4/02): The deferral lbe was paid. Matoaca District Supervisor, Planning Commissioner, Area Citizens, Applicant and Staff(2/12/02): A meeting was held to discuss the proposed rezoning. Concerns were expressed relative to the requested Conditional Use Planned Development rather than a proposal for R-88 zoning, as suggested by the Plan. 12 01SN0201-JUNE26-BOS Applicant (2/22/02): The applicant requested a deferral until May 21,2002. The applicant has indicated an intent to amend the request for R-88 zoning. Applicant (3/7/02): The application was amended to request rezoning form Agricultural (A) to Residential (R- 88) with Conditional Use Planned Development to permit exceptions to Zoning Ordinance requirements. Planning Commission Meeting (3/19/02): At the request of the applicant, the ConLmission deferred this case to June 18, 2002. Staff (3/20/02): The applicant was advised in writing that any new or revised information should be submitted no later than April 2, 2002, for consideration at the Commission's June 18, 2002, public hearing. Also, the applicant was advised that a $150.00 deferral fee must be paid prior to the Commission's hearing. Applicant (4/16/02): The applicant submitted a revision to Proffered Condition 9. Applicant (4/29/02): The deferral fee was paid. Applicant (4/30/02): The applicant submitted a revised Textual Statement. Applicant (5/28/02): The applicant submitted revisions to Conditions 8 and i0 and revised Exhibit A. 13 01 SN0201-JUNE26-BOS Applicant (6/6/02): The applicant submitted revisions to Proffered Condition I. Applicant (6/17/02): I'he applicant amended the request to withdraw the Conditional Use Platmed Development to permit exceptions to Ordinance requirements. Applicant (6/18/02): The applicant revised Proffered Condition 3 limiting development to a maximmn of fifty- nine (59) lots. Plmming Commission Meeting (6/18/02): The applicant accepted the Planning Commission's recommendation but did not accept staff's recommendation. There was no opposition present. One person spoke in support of the application. There wa~s discussion relative to the proposed North/South Arterial; the County's policy with respect to developers building portions of thoroughfare roads located within their property; the construction costs associated with the North/South Arterial through the property, including the creek crossing; and the alternatives of providing funds for the road by the County to cover the cost of this construction in the future. The ConLmission acknowledged the withdrawal of the Conditional Use Planned Development. On motion of Mr. Stack, seconded by Mr. Cunninghan~, the Commission recommended approval of this request and acceptance of the proffered conditions on pages 2 and 3. AYES: Unanimous. The Boa~:d of Supervisors, on Wednesday, Jm~e 26, 2002, beginning at 7:00 p.m., will take under consideration this request. 14 01SN0201-JUNE26-BOS 0 0 o to 0 ~ ~- ?/ t~Jz ,v,Zz :::> ~ 0 I I i I ! I COUNTY THOROUGHFARE PLAN CASE 01SN0201 NORTH ~.,,, __ .,, .... ! ~' ' 01SN0201 - 2 ~IFTCREEK IGHSCHOOL % % % % % % COUNTY THOROUGHFARE PLAN