Loading...
85S048July 24, 1985 BS REQUEST ANALYSIS AND RECOMMENDATION 85S048 Vernon E. LaPrade, Jr. Dale Magisterial District East line of Salem Church Road ~EQUEST: Rezoning from Agricultural (A) to Residential (R-9) plus Conditional Use Planned Development to permit use (recreation) exceptions. RECOMMENDATION Recommend approval for the following reasons: A. The proposed land use conforms to the General Plan 2000. Be The Master Plan and conditions stated herein insure that the devel- opment will be compatible with area residential development. CONDITIONS 0 The following conditions notwithstanding, the plan prepared by Ports and Minter, dated 2/18/85, shall be considered the Master Plan. (P) Prior to the issuance of any building permits, forty-five (45) feet of right of way, measured from the centerline of Salem Church Road, shall be dedicated to and for the County of Chesterfield, free and unrestricted. (T) t Additional pavement shall be constructed along Salem Church Road, and the existing roadside ditch shall be relocated. (T) Prior to recordation of any lots, profiles shall be submitted to the Transportation Department and VDH&T showing available sight dis- tance. If adequate sight distance is not available, the developer shall be responsible for reconstructing Salem Church Road to obtain required sight distances. (T) A fifty (50) foot buffer, exclusive of utility or drainage ease- ments, shall be maintained along Salem Church Road. This buffer may consist of existing vegetation which shall be supplemented, where necessary, to effect a proper screen. Other than the proposed public road and fences on individual lots, no facilities shall be permitted within this buffer. (T&P) (Note: This requires that access to the recreation tract be provided from within the subdivision.) Recorded lot sizes shall be within 10%, plus or minus, of lot sizes shown on the Master Plan, provided that no lot shall be smaller than 9,000 square feet. (P) 7. RECREATION TRACT me Be Ce Parking shall be provided at a ratio of one (1) space for each 90 square feet of combined swimming and wading area; plus four (4) for each tennis court and/or basketball court. (P) Concrete curb and gutter shall be installed around the perime- ter of all driveways and parking areas. (EE) A thirty (30) foot buffer shall be maintained along the north, east and south boundaries and a fifty (50) foot buffer shall be maintained along the western boundary. Other than an access drive from within the subdivision, there shall be no facilities permitted in these buffers. In conjunction with schematic plan review, a landscaping plan for these buffers shall be submitted for approval. (P) De Lighting shall be low level and positioned so as not to project into adjacent properties. No lights shall be permitted on the basketball or tennis courts. (P) Ee Hours of operation shall be restricted to between 9:00 a.m. and 11:00 p.m. (P) The following proffered conditions shall be incorporated into the restrictive covenants: mo All original exterior house colors to be selected from Williamsburg color chart with final approval to be given by Architectural Review Committee. Bm There will be no aluminum or vinyl siding. There will be no fences erected between front of houses and street, with exception of approval by Architectural Review Committee. D. No window or through the wall air conditions will be allowed. Staff further recommends that the following proffered conditions be accepted. Proffered Conditions Each single family residence shall have the following minimum square footages: 85 S6 /BS JUN5/JULY24H me Two-story houses shall have a minimum of 1,496 square feet with 900 square feet finished. Cape Cod houses shall have a minimum of 1,414 square feet with 896 square feet finished. c. Ranchers shall have a minimum of 1,100 square feet finished. (Note: Ail square footages include first floor storage facilities. with the exception of ranchers. Does not include porches, carports or garages.) 2. Exterior of homes shall have: a. Ail foundations shall be of brick. b. All fireplaces shall be of brick or stone. c. Ail houses to have covered front porches. 3. Recreation area: Land for recreation area will be deeded to Homeowner Associa- tion upon occupancy of at least 75 homes; however, until the sale of 95% of all lots, in Ashton Woods North and South, developer will have controlling voice in Association with regards to type of construction, landscaping and construction schedule. GENERAL INFORMATION Location: East line of Salem Church Road across from Huntingcreek Drive. Tax Map 80-10 (1) Parcel 5 (Sheet 22). Existin~ Zonins: A Size: 109.0 acres Existin~ Land Use: Vacant A_djacent Zonin~ & Land Use: North - R-9 with proffered conditions; Single family residential or vacant South - A; Vacant East - A and R-7; Vacant or single family residential West - R-7 and A; Single family residential or vacant Utilities: 16 inch water line located along Salem Church Road. Use of public water intended~ 85S048/BSJUN5/JULY24H Environmental Engineering: Schools: Fire Service: General Plan: Transportation: Lies in prOctors Creek sewage drainage area. Trunk sewer line located along Proctors Creek. Must acquire off-site easements. Use of public sewer intended. Drains to Proctors Creek. On-site drainage courses are inadequate without improvements. Estimate 178 students will be generated. Lies in Salem Church Elementary School attendance zone: capacity - 809, enroll- ment - 774; Salem Church Middle School attendance zone: capacity - 1,350, enroll- ment - 1,220; and Lloyd C. Bird High School attendance zone: capacity - 1,600, enroll- ment - 1,463. Additional space or change of attendance boundaries could be necessary. Chester Fire Station, Company #1. At present, fire service capability adequate. Fire hydrants and water must be provided in compliance with nationally recognized standards. Single family residential Estimate 2,550 average daily trips will be generated. These vehicles will be distrib- uted along Salem Church Road, which had a 1984 traffic count of 2,513 vehicles per day. Proposed Route 288 bisects the request parcel. Due to the undulating vertical alignment, sight distance along Salem Church Road is limited. May be necessary to reconstruct Salem Church Road to obtain adequate sight distance to Salem Church Road (Condition 4). Additional pavement should be installed along Salem Church Road to facilitate turning move- ments. (Condition 3) When Route 288 is constructed, VDH&T will construct a road to the southern portion of the request parcel. This construction will probably not take place for at least two years. The Master Plan proposes access to the recreation area from Salem Church Road. No access is provided from within the subdivi- sion. To keep unnecessary traffic off 4 85S 3/BSJUN5/JULY24H Salem Church Road, Staff recommends access be provided to the recreation tract from within the subdivision. Other than public roads, there should be no access provided to Salem Church Road (Condition 5). Right of way must be dedicated in accordance with the General Plan 2000 or the recommendation of the Central Area Plan, whichever is greater. (Condition 2) DISCUSSION Rezoning with Conditional Use Planned Development is requested to develop a single family residential subdivision and recreational facility. The Master Plan and proffered conditions insure that lot and house sizes will be compatible with existing and future area residential development (Condition 6 and Proffered Conditions). Condition 7 addresses require- ments relative to development of the recreation site to insure that adjacent residents are adequately protected from nuisances normally associated with these facilities. CASE HISTORY Planning Commission Meeting (4/23/85): On motion of Mr. Miller, seconded by Mr. O'Connor, the Commission recom- mended approval of this request subject to the conditions on pages 1 and 2 and acceptance of the proffered conditions on pages 2 and 3. AYES: Unanimous. Applicant (6/19/85): A thirty (30) day deferral was requested to the Board's July meeting. Board of Supervisors Meeting (6/26/85): On motion of Mr. Daniel, seconded by Mr. Dodd, the Board deferred this request for thirty (30) days. AYES: Unanimous. Staff (7/6/85): This request lies within the Central Planning Area where a revised Land Use and Transportation Plan is being prepared by consultants. A draft recommendation by the consultants suggests that Salem Church Road should be constructed to a four-lane typical section. Therefore, a ninety (90) foot right of way will be requested. This developer should provide 85S048/BSJUN5/JULY24H one-half of that requirement or forty-five (45) feet from the existing centerline (Condition 2). It should be noted that the General Plan 2000 recommended that Salem Church Road be a seventy (70) foot right of way and Staff had previously recommended the dedication of thirty-five (35) feet of right of way. Condition 2 has been modified to reflect the new recommendation. The Board of Supervisors on Wednesday, July 24, 1985, beginning at 2:00 p.m., will take under consideration this request. 6 85S ~/BSJUN5/JULY24H EK / 85S04.8 REZ' A TO. R-9 C.U.PD. SH. 22 TREEMO~ A PROPOSED ROUTE 288 A -- IIIIIIIIIIIIIIIIIIIIII1~ July 24, 1985 BS ADDENDUM 85S048 Vernom LaPrade, Jr. Dale Magisterial District Subsequent to the Board's action to defer this case, Staff investigated two areas of concern which had been raised: (1) provision of stub roads to adja- cent properties and (2) house sizes in relation to a recent development pro- posal off Route 360 and Spring Run Road (Deer Run). Ashton Woods North has provided stub roads to adjacent developments and into undeveloped parcels. It was determined by Staff that stub roads from Ashton Woods South would not be feasible. A stub road to the east of Ashton Woods South would not be practical because Chesswood Subdivision is currently being developed and is not providing stubs to be connected. Part of the reasoning for this was the floodplain of Proctors Creek in this area. The property to the south, owned by Richmond Lumber Company, has extensive road frontage along Salem Church Road. If and when this property is developed, access would be provided off Salem'Church Road in the vicinity of Sara Kay Drive and/or Fox Hollow Drive (see map attached). It should also be noted that a stub road to this property was provided through Chesswood (i.e., Plum Street). However, because of the floodplain and Proctors Creek between Ashton Woods South and the Richmond Lumber Company property, a connection would be extensive and extremely costly. It should be noted that, in the past, it has been a prac- tice of Staff to look at topographical features such as creeks, valleys, streams and/or floodplains to determine if stub roads to undeveloped prop- erties would be practical, or if it would cause too much expense on the devel- oper's part to make practical the connection of a stub road. Where Staff has felt that these topographical features would preclude the road from being extended, stubs have not been recommended. The property being developed as Ashton Woods South does not currently have public road frontage on Salem Church Road. During the condemnation process for 1-288, the VDH&T agreed to build a service road, to be built by State forces, to serve this property. The location of this access road is impor- tant. It will be built close to a bridge abutment for the 1-288 overpass. While sight distances will be met, this access will provide limited visibility and, Staff is of the opinion that, accesses from other developments should not be at this point. Only a limited number of lots, those currently proposed with Ashton Woods South, should be allowed to access Salem Church Road in this location. If other lots are allowed to access Salem Church Road in this location, Staff would anticipate that problems would be magnified. A second concern raised with Staff was whether or not the house sizes in Ashton Woods were comparable to those proposed with a recent development, known as Deer Run, located near the intersection of Spring Run Road and U.Sf Route 360. The following table will provide a complete comparison of the house styles and/or types and their square footages between the two developments: Ashton Woods Deer Run One story (Ranch style) 1,100 sq. ft. 1,200 sq. ft. fin. One and one-half (Cape Cod) 1,414 min. sq. ft. 896 fin. 1,430 gross sq. ft. Two-story 1,496 min. sq. ft. 900 sq. ft. fin. 1,660 gross sq. ft. If it is the desire of the Board of Supervisors to have house sizes between these two developments comparable, the ranch style house in Ashton Woods should be increased to a minimum of 1,200 square feet of finished floor area. It should be noted that it is difficult to make a comparison between the one and one-half story cape cod and the two-story houses in these two developments since the proffered sizes differ as to the minimum finished floor areas and the minimum gross square footage. However, if it is the Board's desire to have these two subdivision homes made comparable, then the Ashton Woods devel- opment should have a one and one-half story cape cod which would feature 1,430 gross square feet and a two-story with 1,660 gross square feet. 2 85S. J/BSJUN5/JULY24HH '--7 WOODS Illlllllllll 7¢/~£ ss wdo[ R I ChlI~IOND