Loading...
06SN0220CASE MANAGER: Darla Orr ,~~r ~~. . ,~~ `;_ ~ u ~ ~~ i ~- ^ ,k January 22, 2014 BS ADDENDUM 06SN0220 (AMENDED) Brookstone Builders Dale Magisterial District Jacobs Elementary; Manchester Middle; and Clover Hill High Schools Attendance Zones North line of Jacobs Road REQUESTS: L Rezoning from Agricultural (A) and Residential (R-12) to Residential (R-15). II. Waiver to the street connectivity requirements for Land Grant Drive and Newbys Wood Trail. PROPOSED LAND USE: A single-family residential development with a minimum lot size of 15,000 square feet is planned. The applicant has agreed to limit development to a maximum of sixty-seven (67) lots, yielding a density of approximately 0.88 dwelling units per acre. Alsq waiver to street connectivity requirements is requested as no public road access is proposed from the development to Land Grant Drive and Newbys Wood Trail. The purpose of this addendum is to communicate revised comments from the Virginia Department of Transportation (VDOT) and Schools. On January 21, 2014 staff received revised comments from Schools and VDOT for this case. Schools advised that their comments are revised to reflect current schools' functional capacities based on the 2013-14 Space Utilization Study as well as current school trailer data. VDOT advises that their revised comments include their recent evaluation of the subject subdivision under the Subdivision Street Requirements (SSR) regulation. Staff continues to recommend approval of this request, as outlined in the "Request Analysis". Pro~Tiding a FIRST CHOICE community through excellence in public ser~Tice Schools: Residential Yield: 148 Student Yield From Functional No. of % of School Name Residential Membership Capacity Capacity Trailers Development :~ Elementary: Jacobs Road 31 651 707 92% 5 Middle: Manchester 17 1,431 1,319 108% 20 High: Clover Hill 23 1,875 1,750 107% 0 Total 71 NOTE: The Student Yield is based on the FY2014 Cash Proffer Methodology as provided by the Chesterfield County Finance Department. NOTE: ** If a school is less than 90% of capacity and has tr ailers, those tr ailers are not identified in the staff report. Student Membership is based on membership as of 09-30-13. School Capacity is based on the 2013-14 Space Utilization Study. After review of this request, the proposed rezoning case will continue to have a substantial impact on the aforementioned schools involved. The elementary and secondary school students generated by the proposal would continue to push enrollment to capacity and beyond at each school. Over time this case, combined with other tentative residential developments, infill developments and zoning cases in the area, will continue to push elementary and secondary schools beyond their capacity. Therefore, the aforementioned units should continue to be subject to full cash proffers, to mitigate the impact that this proposed development would have on schools. (Proffered Condition 2) Virginia Department of Transportation (VDOT~: VDOT notes that the Brookstone project has been submitted to Chesterfield County with a tentative layout under Chesterfield County's tentative process (lOTS0244 -latest plan dated September 27, 2010, for which comments have been made by VDOT, and others). The tentative was submitted under the provisions of the VDOT 2009 Subdivision Street 2 06SN0220-20141 ~N22-BUS ~~DD Acceptance Requirements (SSAR) regulation. Under those regulations, the Land Grant Drive stub must be connected to for State acceptance consideration. However, requested by the County on January 16, 2014, through the grandfathering clause of the SSAR's, was that State acceptance be considered under the provisions outlined in the 2005 Subdivision Street Requirements (SSR) regulation. VDOT accepts the County's request. Under the SSR's, no stub connection is required to Land Grant Drive as a condition of State acceptance. Alsq VDOT has no objection to the waiver of street connectivity from Newby's Wood Trail to Jacobs Road extended. 3 OEiSN0220-20141_~N22-B( )S-_~DD CASE MANAGER: Darla Orr i ~ ~- ~j~, u ~i ,k ~ ~- BS Time Remaining: 365 days ~.T,,,.o,,,~,o,- i ti ~nnti r~r ~ot,r,,,,-~ ~n ~ nn~ r~r r,,,,o i ~ ~nn~ n,.~ā€žt,o,- i ti ~n r~r n~ r~r ~.T,,, oH~t,o,- ~n ~nn~ r~r F~~ nn~~ arL~iā€ž i ~ ~nn4 '~l~v°'~~ i~ T ` r+~r+ nn~~ ~ v PE n,.~ā€ž~,o,- ~n ~n nn r~r ~.T,,, oH~t,o,- i ti ~ni n r~r i~'i-t"cfC~i 2~ n ~.T,,,. ~, ~c ~ni ~ r~r n~.~..,,,,-~, i n ~ ni ~ ~+~~+ x~~T l`~ -, 28~~ e ~---~--~--._ i i ~ni'~ nn STAFF' S REQUEST ANALYSIS AND RECOMMENDATION 06SN0220 (AMENDED) Brookstone Builders January 22, 2014 BS Dale Magisterial District Jacobs Elementary; Manchester Middle; and Clover Hill High Schools Attendance Zones North line of Jacobs Road REQUESTS: L Rezoning from Agricultural (A) and Residential (R-12) to Residential (R-15). II. Waiver to the street connectivity requirements for Land Grant Drive and Newbys Wood Trail. PROPOSED LAND USE: A single-family residential development with a nunimum lot size of 15,000 square feet is planned. The applicant has agreed to limit development to a maximum of sixty-seven (67) lots, yielding a density of approximately 0.88 Pro~Tiding a FIRST CHOICE community through excellence in public ser~Tice dwelling units per acre. Alsq waiver to street connectivity requirements is requested as no public road access is proposed from the development to Land Grant Drive and Newbys Wood Trail. PLANNING COMMISSION RECOMMENDATION RECOMMEND APPROVAL OF REQUEST I (REZONING) AND ACCEPTANCE OF THE PROFFERED CONDITIONS ON PAGES 2 THROUGH 6. RECOMMEND APPROVAL OF REQUEST II (WAIVER TO THE STREET CONNECTIVITY REQUIREMENTS FOR LAND GRANT DRIVE AND NEWBYS WOOD TRAIL) AND ACCEPTANCE OF PROFFERED CONDITION 14 ON PAGE 6. STAFF RECOMMENDATION Request I (Rezonin Recommend approval for the following reasons: A. The proposed zoning and land use complies with the recommendations of the Comprehensive Plan which suggests the request property is appropriate for Suburban Residential use (2.0 to 4.0 dwellings per acre). B. The applicant has offered to address the impact of the development on necessary capital facilities in accordance with the Board of Supervisors' Policy, thereby assuring adequate service levels are maintained to protect the health, safety and welfare of County citizens. Request II (Waiver to street connectivity to Land Grant Drive and Newbys Wood Trail: Recommend approval for the following reason: Absent a connection to Land Grant Drive and Newbys Wood Trail, a sufficient number of accesses are planned to adequately disperse traffic without causing a concentrated use of any one (1) stub street, and, with the emergency access to be constricted at Newbys Wood Trail, to provide access in the event of an emergency. (NOTE: THE ONLY CONDITION THAT MAY BE IMPOSED IS A BUFFER CONDITION. THE PROPERTY OWNER(S) MAY PROFFER CONDITIONS. CONDITION(S) NOTED "STAFF/CPC" WERE AGREED UPON BY BOTH STAFF AND THE COMMISSION.) PROFFERED CONDITIONS (STAFF/CPC) 1. Utilities. Public water and wastewater systems shall be used. (U) 2 06SN0220-20141 ~N22-BOS-RPT (STAFF/CPC) 2. Impacts on Capital Facilities. A. For each dwelling unit, the applicant, sub-divider, or assignee(s) shall pay the following to the County of Chesterfield, prior the issuance of a building permit for infrastnicture improvements within the service district for the property; provided, however, that the period through June 30, 2017, the applicant sub-divider, or assignee(s) shall pay the following to the County of Chesterfield, immediately after completion of the final inspection: i. $18,966.00 per dwelling unit, if paid prior to July 1, 2017; or ii. If paid after June 30, 2017, and before July 1, 2018, $18,966.00 per dwelling unit, adjusted for the four year cumulative change in the Marshall and Swift Building Cost Index between July 1 of the fiscal year in which the case was approved and July 1 four years later. Thereafter, the per dwelling unit cash proffer amount shall be automatically adjusted, annually, by the annual change in the Marshall and Swift Building Cost Index on July 1 of each year. iii. In the event the cash payment is not used for which proffered within 15 years of receipt the cash shall be returned in full to the payer. iv. Should any impact fees be imposed by Chesterfield County at any time during the life of the development that are applicable to the property, the amount paid in cash proffers shall be in lieu of or credited toward but not to be in addition to any impact fees in a manner determined by the County. B. Cash proffer payments shall be spent for the purposes proffered or as otherwise permitted bylaw. (B&M) (STAFF/CPC) 3. Density. A maximum of sixty seven (67) residential lots shall be permitted. (P) (STAFF/CPC) 4. Timber Management, for the purpose of enhancing the health and viability of the forest, under the supervision of a qualified forester, will only be allowed upon the submission and approval of the appropriate forest management plan to include, but not linuted tq erosion control, Chesapeake Bay Act/Wetland Restrictions and the 3 06SN0220-20141 ~N22-BOS-RPT issuance of a land disturbance permit by the Environmental Engineering Department. Any other timbering shall be incorporated into the site development erosion and sediment control plan/narrative as the initial phase of infrastnicture constriction and will not commence until the issuance of the actual site development land disturbance permit. (EE) (STAFF/CPC) 5. Constriction Traffic. Constriction traffic for the initial development shall be limited to Existing Jacobs Road and Jacobs Road Extended and shall be further limited on Existing Jacobs Road from entering and exiting the site between the hours of 7:45 a.m. and 8:45 a.m. and 2:15 p.m. and 3:15 p.m. on days of the regular school year. Note: This prohibits the use of any subdivision street, including Fordham Road, for the initial constriction access. (P) (STAFF/CPC) 6. Access. A. No lots shall have sole access to Double Tree Lane. B. In conjunction with preliminary plan submittal, an access plan for Jacobs Road Extended shall be submitted to and approved by the Chesterfield County Transportation Department. Access from the property to Jacobs Road Extended shall be as per the approved plan. C. There shall be no connection to Land Grant Drive. (T) (STAFF/CPC) 7. Dedication. In conjunction with recordation of the initial subdivision plat or within ninety (90) days of a request by the Transportation Department, whichever occurs first, a seventy (70) foot wide right-of--way for an east/west collector ("Jacobs Road Extended") from the eastern property line to the western property line shall be dedicated, free and unrestricted, to and for the benefit of Chesterfield County. The exact location of this right-of--way shall be approved by the Transportation Department. (T) (STAFF/CPC) 8. On-Site Road Improvements. To provide an adequate roadway system, the developer shall provide the following road improvements with the development of the property: A. Constriction of a traffic island/circle or other alternative traffic calming device in Jacobs Road Extended if approved by the Transportation Department and VDOT. The location OEiSN0220-20141_~N22-BOS-RPT and design shall be determined at time of tentative subdivision review; B. Constriction of two (2) lanes of Jacobs Road Extended, to VDOT Urban Collector Standards (40 mph) with modifications approved by the Transportation Department, from the intersection of Jacobs Road and existing Fordham Road through the property to the western property line. The portion of Jacobs Road Extended immediately adjacent to Tax ID 755-682-5559 shall be located as far north as practical. The exact length and location of this improvement shall be approved by the Transportation Department; C. Constriction of right and left turn lanes along Jacobs Road Extended at each public road intersection, as determined by the Transportation Department D. Dedication to Chesterfield County, free and unrestricted, any additional right-of--way (or easements) required for the improvements identified above. (T) (STAFF/CPC) 9. Phasing Plan. Prior to any constriction plan approval, a phasing plan for the required road improvements as identified in Proffered Condition 8, shall be submitted to and approved by the Transportation Department. (T) (STAFF/CPC) 10. Minimum Dwelling Size. The minimum gross floor area for one story dwelling units shall be 1800 square feet and dwelling units with more than one story shall have a minimum gross floor area of 2200 square feet. (BI & P) (STAFF/CPC) 11. Foundations. All exposed portions of the foundation of each new dwelling unit shall be faced with brick, stone veneer, or decorative concrete. Exposed piers supporting front porches shall be faced with brick or stone veneer. (BI & P) (STAFF/CPC) 12. Tree Preservation. A twenty (20) foot tree preservation strip, exclusive of required yards, shall be maintained along the boundary of the development adjacent to Newbys Wood and Fernbrook Subdivisions. Utility easements shall be permitted to cross this strip in a perpendicular fashion. Any healthy trees that are eight (8) inches in caliper or greater shall be retained within this tree preservation strip except where removal is necessary to accommodate the improvements permitted by the preceding sentence. (P) 5 06SN0220-20141 ~N22-BOS-RPT (STAFF/CPC) 13. Culverts. If any road is an only means of access, the culvert capacity during the 100-year storm will be designed to linut the head water elevation to the edge of the pavement at the road sag. (EE) (STAFF/CPC) 14. A gated emergency access, approved by the Fire Department, shall be provided from Jacobs Road to Newbys Wood Trail (FD) GENERAL INFORMATION Location: The request property fronts the north line of Jacobs Road, west line of Fordham Road and the southern termini of Double Tree Lane and Land Grant Drive. Tax IDs 753-684-4148; 755-683-7406; 756-683-5406; 757-682-0789 and 3089; and 757-683-1431 and Part of 1912. Existing Zonin A and R-12 Size: 75.7 acres Existing Land Use: Single-family residential or vacant Adjacent Zoning and Land Use: North - R-12; Single-family residential or vacant South - R-15 and R-12, and A; Single-family residential or vacant East - R-12 and A; Single-family residential, public/semi-public or vacant West - R-15 and A; Single-family residential or vacant t rTrr TTrF c Public Water System: There is an eight (8) inch water line extending along Newbys Wood Trail that terminates adjacent to Jacobs Road, approximately 350 feet east of this site. In addition, an eight (8) inch water line extends along Double Tree Lane and terminates approximately 175 feet north of this site. Another possible point of access to public water is the existing eight (8) inch water line extending along Gregory Drive, 400 feet north of this site. An off-site easement will be required to connect to this line. Note should also be made of an existing 6 06SN0220-20141 ~N22-BOS-RPT thirty (30) inch water transmission line that extends across the request site north of Jacobs Road and across the northern most portion of this site. This line experiences a high variation in pressure depending upon the cycling of the pumps at the Anderson Water Pump Station, and will not be suitable to serve this development. Use of the public water system is intended. (Proffered Condition 1) Per Utilities Department Design Specifications (DS-21), wherever possible, two (2) supply points shall be provided for subdivisions containing more than twenty-five (25) lots. Public Wastewater System: The public wastewater system is available to serve this site. Atwenty-seven (27) inch wastewater tnmk line extends along a tributary of Horners Run that crosses this site. The applicant has proffered to use the public wastewater system. (Proffered Condition 1) ENVIRONMENTAL Drainage and Erosion: The subject property has several perennial streams surrounding and draining through the property. These streams drain to the north to a tributary of Falling Creels. There are no known on- or off-site drainage or erosion problems and none are anticipated after development. The property is wooded and, as such, should not be timbered without obtaining a land disturbance permit from the Department of Environmental Engineering and the approved measures are installed (Proffered Condition 4). This will ensure appropriate erosion control measures are in place prior to land disturbance. Water QualitX: All perennial streams are subject to a 100 foot conservation area, inside of which uses are very limited. This RPA determination process has now been performed by virtue of this project's previous submittal as a proposed agricultural subdivision when it went through the tentative plat approval process in 2010. In order to provide appropriate emergency access to properties that may only have one means of access, any proposed road that provides such access that crosses the perennial stream must be designed such that the 100 year storm does not top the road. (Proffered Condition 13) PUBLIC FACILITIES The need for schools, parks, libraries, fire stations, and transportation facilities in this area is identified in the County's adopted Public Facilities Plan, the Thoroughfare Plan and the Capital 7 06SN0220-20141 ~N22-BOS-RPT Improvement Program and further detailed by specific departments in the applicable sections of this "Request Analysis." This development will have an impact on these facilities. Fire Service: The Public Facilities Plan, as part of the Comprehensive Plan, indicates that fire and emergency medical service (EMS) calls increased by forty-four (44) percent from 2001 to 2011, significantly faster than the County's population increase of seventeen (17) percent. Of the total incidents in 2011, nearly seventy-six (76) percent were medical emergencies and twenty-four (24) percent were fire-related. It is expected with the general aging of the population that medical emergency incidents will increase faster than the rate of population growth over time. Five (5) new fire/rescue stations are recommended for constriction by 2022 in the Plan. In addition to the five (5) new stations, the Plan also recommends the replacement/revitalization of four (4) existing stations. Based on sixty-seven (67) dwelling units, this request will generate approximately seven (7) calls for fire and emergency medical service each year. The Manchester Volunteer Rescue Squad Fire Station, Number 24, and Manchester Volunteer Rescue Squad currently provide fire protection and emergency medical service (EMS). The applicant has offered measures to address the impact on Fire and EMS. (Proffered Condition 2) Fire and EMS supports the proposed emergency access connection from Jacobs Road to Newbys Wood Trail as it improves the access in the event of an emergency (Proffered Condition 14). The connection to the north with Double Tree Lane is acceptable and Fire and EMS does not require an additional access with Land Grant Drive. (Proffered Condition 6.C) When the property is developed, the number of hydrants, quantity of water needed for fire protection, and access requirements will be evaluated during the plans review process. 8 06SN0220-20141 ~N22-BOS-RPT Schools: IMPACT OF DEVELOPMENT ANALYSIS: Residential Yield: 148 Student Yield Functional % of School Name Res dential Membershi p Capacity Trailers Capacity Development ,~,~ :~ Elementary: Jacobs Road 31 651 697 93% 5 Middle: Manchester 17 1,431 1,319 108% 20 High: Clover Hill 23 1,875 1,750 107% 0 Total 71 NOTE: The Student Yield is based on the FY2014 Cash Proffer Methodol ogy as provided by the Chesterfield County Finance Department. NOTE: ** If a school is less than 90% of capacity and has trailers, those trailers are not identified in the staff report. Student Membership is based on membership as of 09-30-13. School Capacity is based on the 2012-13 Space Utilization Study. After review of this request, the proposed rezoning case will continue to have a substantial impact on the aforementioned schools involved. The elementary and secondary school students generated by the proposal would continue to push enrollment to capacity and beyond at each school. Over time this case, combined with other tentative residential developments, infill developments and zoning cases in the area, will continue to push elementary and secondary schools beyond their capacity. Therefore, the aforementioned units should continue to be subject to full cash proffers, to mitigate the impact that this proposed development would have on schools. (Proffered Condition 2) T ,i hrari e~ Consistent with Board of Supervisors' Policy, the impact of development on library services is assessed County-wide. This development would likely impact the existing La Prade Library or a planned library in the Reams-Gordon area. The Public Facilities Plan 9 06SN0220-20141 ~N22-BOS-RPT recommends the new Reams-Gordon Branch address existing and anticipated demand issues on the existing Le Prade, Clover Hill, Bon Air and Midlothian libraries. The applicant has offered measures to address the impact of the development on libraries. (Proffered Condition 2) Parks and Recreation: The Public Facilities Plan identifies the need for three (3) regional parks totaling 600 acres, ten (10) community parks totaling 790 acres, nine (9) neighborhood parks totaling 180 acres, and three (3) water-based special purpose parks. The Plan also identifies the need for urban parks within mixed use developments to compliment and provide linkages to the County's park system. The Plan identifies the need for linear parks and trails and resource-based special purpose parks [historical, cultural and environmental] and makes suggestions for their locations. The Plan also addresses the need to expand existing park sites to meet level of service standards. The Plan also identifies the need to improve access to blueways through the acquisition of easements and properties. Co-location with schools and other compatible public facilities is desired. The applicant has offered measures to address the impact of this development on Parks and Recreation facilities. (Proffered Condition 2) County Department of Transportation: The applicant has proffered a maximum of sixty-seven (67) lots (Proffered Condition 3). Based on trip generation rates for single-family housing, development of the property could generate approximately 700 average daily trips. The Thoroughfare Plan, a component of the Comprehensive Plan, identifies a proposed Collector through the property ("Jacobs Road Extended"). The applicant has proffered to constrict two lanes of Jacobs Road Extended, with turn lanes and appropriate traffic calming, through the property in accordance with the Thoroughfare Plan (Proffered Conditions 7 and 8). Proffered Condition 9 permits these improvements to be phased as the development occurs. Access to collectors, such as Jacobs Road Extended, should be controlled to mitigate vehicular conflict points. The applicant has proffered to submit an acceptable access plan for Jacobs Road Extended to the Transportation Department in conjunction with preliminary plan subnuttal. (Proffered Condition 6.B) The applicant has proffered to contribute cash, in an amount consistent with the Board of Supervisors' Policy, towards mitigating the traffic impact of development (Proffered Condition 2). As development continues in this part of the County, traffic volumes on area roads will substantially increase. Cash proffers alone will not cover the cost of the improvements needed to accommodate the traffic increases. 10 06SN0220-20141 ~N22-BOS-RPT Virginia Department of Transportation (VDOT~: VDOT notes that the Miller's Run project has been submitted to Chesterfield County with a tentative layout under Chesterfield County's tentative process (lOTS0244 -latest plan dated September 27, 2010, for which comments have been made by VDOT, and others). The tentative was submitted under the provisions of the VDOT 2009 Subdivision Street Acceptance Requirements (SSAR) regulation. The developer has the option of continuing to use the provisions of the 2009 SSAR, or the developer may opt to use the provisions of the 2011 SSAR. In either case, the plans shall meet the regulatory requirement for access management as found under 24 VAC 30-73. Otherwise, VDOT has no opinion concerning the remaining proffers. Financial Imbact on Cabital Facilities: Per Dwelling Unit Potential Number of New Dwelling Units 67* 1.00 Population Increase 179.04 2.67 Number of New Students Elementary 14.11 0.21 Middle 7.65 0.11 High 10.25 0.15 Total 32.01 0.48 Net Cost For Schools $ 632,815 $ 9,445 Net Cost for Parks $ 83,549 $ 1,247 Net Cost for Libraries $ 21,641 $ 323 Net Cost For Fire Stations $ 47,503 $ 709 Average Net Cost Roads $ 537,273 $ 8,019 Total Net Cost $ 1,322,781 $ 19,743 *Based on Proffered Condition 3. The actual number of dwelling units and corresponding impact may vary. As noted, this proposed development will have an impact on capital facilities. Staff has calculated the fiscal impact of every new dwelling unit on schools, parks, libraries, fire stations and roads as $19,743 per unit. The applicant has been advised that a maximum proffer of $18,966 per unit would defray the cost of the capital facilities necessitated by this proposed development. The applicant has offered cash payments of $18,966 per dwelling unit to adequately assist in defraying the cost of this proposed development on capital facilities. (Proffered Condition 2) Note that circumstances relevant to this case have been reviewed and it has been determined that it is appropriate to accept the maximum cash proffer in this case. 11 06SN0220-20141 ~N22-BOS-RPT LAND USE Comprehensive Plan: The Comprehensive Plan suggests the property is appropriate for Suburban Residential II use (2.0 to 4.0 dwellings per acre). Area Development Trends: Area properties are zoned residentially and agriculturally and are occupied by single- family residential use within Fernbrook, Newbys Woods and Gregory's Charter Subdivisions or are vacant. Jacobs Road Elementary School is located east of the property across Fordham Road. It is anticipated that any development of area properties will be for residential purposes consistent with densities recommended by the Plan. Density: Proffered Condition 3 limits the number of lots permitted to a maximum of sixty-seven (67), yielding a density of approximately 0.88 dwelling units per acre. There are two (2) existing dwellings on the request property which would be counted towards the maximum allowable density. Dwelling Size and Foundation Treatment: Proffered Conditions 10 and 11 address minimum dwelling size and foundation treatment. Tree Preservation: In response to concerns from area property owners, Proffered Condition 12 requires that where the proposed development is adjacent to Newbys Wood and Fernbroolc Subdivisions, trees of a certain caliper would be preserved. It has been staff's experience that individual homeowners tend to clear tree preservation areas included within the boundaries of individual lots. To preserve the integrity of this strip, Proffered Condition 12 should be modified to require that these areas be provided in open space. Access and Street Connectivi With the proposed development, two (2) lanes of the collector road planned to connect Jacobs Road to Courthouse Road (Jacobs Road Extended) will be constricted from existing Jacobs Road through the property to its western property boundary (Proffered Condition 8.B). Access for the proposed development will be provided along this collector, as approved by the County Transportation Department (Proffered Condition 6.B). In addition, two (2) streets from within the Fernbroolc Subdivision (Double Tree Lane and Land Grant Drive) stub in to the request property along its northern boundary. Newbys Wood Trail offers a connection from Jacobs Road Extended to the south. 12 06SN0220-20141 ~N22-BOS-RPT In addition to promoting fire and emergency services safety, subdivision road connections provide interconnectivity between residential developments, thereby reducing congestion along collector and arterial roads and providing a convenient and safe access to neighboring properties. An exception to the Residential Subdivision Connectivity Policy is requested (Request II) to preclude any public road connections to Land Grant Drive and only an emergency access to Newbys Wood Trail (Proffered Conditions 6.C and 14). The Policy allows the Board, through the Commission's recommendation, to waive the requirement for streets in new subdivisions to connect to adjacent public streets that are designed as local streets, residential collectors and thoroughfare streets. Staff must evaluate this waiver based upon three (3) criteria: (1) there must be a sufficient number of other stub streets to adequately disperse traffic and not cause a concentrated use of any one (1) stub street; (2) the connection to a particular stub will cause concentrated traffic at that location; or (3) the projected traffic volume on any one (1) local street within an existing subdivision exceeds 1,500 vehicle trips per day. Several of the streets within the adjacent Fernbrook Subdivision were developed prior to the adoption of the Planning Commission's Stub Road Policy. As such, the traffic volume on some of these "lot-frontage" streets, such as Fordham Road, currently exceeds the 1,500 vehicles per day guideline established by the Policy. However, maintaining available stub road connections could disperse the traffic generated by this proposed development and not put the traffic burden on particular stub road(s) in violation of the Policy standards. The applicants indicate they plan to connect to Double Tree Lane to the north. To ensure the connection to Double Tree Lane affords connectivity for the entire development, Proffered Condition 6.A. prohibits lots from having sole access to the road. This access provides sufficient street access to disperse traffic from the development without a connection to Land Grant Drive. The applicants also indicate they do not plan to connect a public road to Newbys Wood Trail to the south, but offer an emergency access to improve access in emergencies. (Proffered Condition 14) Constriction Traffic: Proffered Condition 5 limits constriction traffic to Jacobs Road and Jacobs Road Extended, to include limitations during bussing hours for the adjacent Jacobs Elementary School. This prohibits the use of any subdivision street, including Fordham Road for constriction access. This proffered condition will be difficult, if not impossible, to enforce. CONCLUSIONS The proposed zoning and land use comply with the recommendations of the Comprehensive Plan which suggest the request property is appropriate for Suburban Residential use (2.0 to 4.0 13 06SN0220-20141 ~N22-BOS-RPT dwellings per acre). In addition, the proffered conditions adequately address the impacts of this development on necessary capital facilities, as outlined in the Board's policy thereby insuring adequate service levels are maintained to protect the health, safety and welfare of County citizens. A sufficient number of accesses are planned to adequately disperse traffic, provide access in the event of an emergency, and so as not to cause a concentrated use of any one (1) snib street. Given these considerations, approval of the rezoning (Request I) and waiver to connectivity for Land Grant Drive and Newbys Wood Trail (Request II) is recommended. CASE HISTORY Planning Commission Meeting (11/16/06): At the request of the applicant, the Commission deferred this case to Febniary 20, 2007. Staff (11/20/06): The applicant was advised in writing that any significant, new or revised information should be submitted no later than December 18, 2006, for consideration at the Commission's Febniary 20, 2007, public hearing. Alsq the applicant was advised that a $250.00 deferral fee must be paid prior to the Commission's public hearing. Staff (1/24/07): To date, no new information has been submitted, nor has the $250.00 deferral fee been paid. Applicant (2/12/07): The deferral fee was paid. Planning Commission Meeting (2/20/07): At the request of the applicant, the Commission deferred this case to April 17, 2007. 1~ OEiSN0220-20141_~N22-BOS-RPT Staff (2/21/07): The applicant was advised in writing that any significant, new or revised information should be submitted no later than Febniary 26, 2007, for consideration at the Commission's April 17, 2007, public hearing. Alsq the applicant was advised that a $250.00 deferral fee must be paid prior to the Commission's public hearing. Staff (3/12/07): To date, no new information has been submitted, nor has the $250.00 deferral fee been paid. Applicant (4/11/07): The deferral fee was paid. Planning Commission Meeting (4/17/07): At the request of the applicant, the Commission deferred this case to June 19, 2007. Staff (4/18/07): The applicant was advised in writing that any significant, new or revised information should be submitted no later than April 23, 2007, for consideration at the Commission's June 2007, public hearing. In addition, the applicant was advised that a $250.00 deferral fee must be paid prior to the Commission's public hearing. Applicant (5/7/07): Amended proffered conditions were submitted. Area Residents, Applicant, Staff and Dale District Commissioner (5/10/07): A meeting was held to discuss transportation impacts for this case. Discussion focused on the applicant's proposal to relieve traffic on Fordham Road by extending Jacobs Road from its western terminus to Courthouse Road as a collector road and severing the public road connection between Jacobs Road and Fordham Road. Concerns were expressed relative to the lack of connectivity between Fordham Road and Jacobs Road and its impact on Fernbrook Subdivision, emergency services and the elementary school; proximity of the new collector road in relation to existing subdivision developments; the 15 06SN0220-20141 ~N22-BOS-RPT condition of Newby's Bridge Road; constriction traffic; and connectivity to Newby's Wood. Subdivision. A follow-up meeting was announced for May 31, 2007, to discuss other case-related issues. Staff (5/25/07): Revised proffered conditions were submitted and the applicant was amended to include relief to street access requirements. To date, the deferral fee has not been paid. Area Residents, Applicant, Staff and Dale District Commissioner (5/31/07): A meeting was held to discuss other case related issues. Concerns were expressed relative to dwelling unit types, drainage, access, and the phasing of the development and associated road improvements. It was indicated that the applicant would review comments from the community meetings prior to determining if additional meetings were warranted. Applicant (6/19/07): The deferral fee was paid. Planning Commission Meeting (6/19/07): At the request of the applicant, the Commission deferred this case to their August 21, 2007, meeting. Staff (6/20/07): The applicant was advised in writing that any significant new or revised information should be submitted no later than June 25, 2007, for consideration at the Commission's August public hearing. The applicant was also advised that a $250.00 deferral fee must be paid prior to the Commission's public hearing. Staff (8/1/07): To date, no new information has been received nor has the deferral fee been paid. 16 06SN0220-20141 ~N22-BOS-RPT Staff (8/20/07): The deferral fee was paid. Planning Commission Meeting (8/21/07): On their own motion, the Commission deferred this case to their October 16, 2007, meeting. Staff (8/22/07): The applicant was advised in writing that any significant new or revised information should be submitted no later than August 27, 2007, for consideration at the Commission's October public hearing. Applicant (8/29/07, 9/27/07 and 9/28/07): Revised proffered conditions were submitted. Applicant (10/2/07): A waiver to the street connectivity policy was requested. Planning Commission Meeting (10/16/07): On their own motion, the Commission deferred this case to their November 20, 2007, meeting. Staff (10/17/07): The applicant was advised in writing that any significant, new or revised information should be submitted no later than October 22, 2007, for consideration at the Commission's November public hearing. Staff (10/26/07): To date, no new information has been submitted. 17 06SN0220-20141 ~N22-BOS-RPT Applicant (10/26/07): Amended and new proffered conditions were submitted. Exhibit A was revised. Planning Commission Meeting (11/20/07): At the request of the applicant, the Commission deferred this case to their regularly scheduled meeting in Febniary 2008. Staff (11/21/07): The applicant was advised in writing that any significant new or revised information should be submitted no later than December 10, 2007 for consideration at the Commission's Febniary, 2008 public hearing. The applicant was also advised that a $250.00 deferral fee must be paid prior to the Commission's public hearing. Applicant (1/8/08): Revised proffered conditions and Exhibit A were subntted. Staff (1/11/08): The deferral fee was paid. Applicant (1/23/08): Revised proffered conditions were submitted. Area Residents, Applicant, Staff and Dale District Supervisor and Commissioner (2/5/08): A meeting was held to discuss this case. Discussion focused on the applicant's proposal to extend Jacobs Road to Courthouse Road and a recent change to the proffered conditions to maintain the public road connection between Jacobs and Fordham Roads. Varying opinions were shared as to whether severing the Fordham/Jacobs Roads connection would provide relief to Fordham Road or encourage use of proposed subdivision streets or the elementary school bus loop to access Fordham Road. It was generally agreed that the applicant would defer this case to provide additional time to work through transportation issues with the community and the Dale District Commissioner. 18 06SN0220-20141 ~N22-BOS-RPT Planning Commission Meeting (2/19/08): At the request of the applicant, the Commission deferred this case to their June 17, 2008 meeting. Staff (2/21/08): The applicant was advised in writing that any significant, new or revised information should be submitted no later than April 7, 2008 for consideration at the Commission's June public hearing. The applicant was also advised that a $250.00 deferral fee must be paid prior to the Commission's public hearing. Area Community Representatives, Applicant, Staff and Dale District Commissioner (3/19/08): A meeting was held to discuss this case. Discussion focused on the extension of Jacobs Road, connectivity between Jacobs and Fordham Roads and project density. Those in support of the road extension and severing connectivity between Jacobs and Fordham Roads noted the potential traffic relief to Fordham Road. Those opposed indicated concern relative to the road extension carrying additional traffic from other communities; proximity of the extension to neighboring lots; lack of connectivity for emergency vehicles; use of elementary school bus loop as acct-through; and preference for a reduction in prof ect density rather than the road extension. The applicant indicated the need to work further with the Dale District Commissioner relative to resolution of these issues. Staff (5/13/08): To date, no new information has been submitted nor has the deferral fee been paid. Planning Commission Meeting (6/17/08): At the request of the applicant, the Commission deferred this case to their November 18, 2008 meeting. Staff (6/18/08): The applicant was advised in writing that any significant new or revised information should be submitted no later than September 8, 2008 for consideration at the 19 06SN0220-20141 ~N22-BOS-RPT Commission's November public hearing. The applicant was also advised that a $250.00 deferral fee must be paid prior to the Commission's public hearing. Staff (10/28/08): To date, no new information has been submitted. The deferral fee was paid. Planning Commission Meeting (11/18/08): At the request of the applicant, the Commission deferred this case to their regularly scheduled meeting in October 2009. Staff (11/19/08): The applicant was advised in writing that any significant, new or revised information should be submitted no later than August 10, 2009 for consideration at the Commission's October 2009 public hearing. The applicant was also advised that a $1,000.00 deferral fee must be paid prior to the Commission's public hearing. Staff (9/28/09): To date, no new information has been submitted. Staff (10/5/09): The deferral fee was paid. Planning Commission Meeting (10/20/09): At the request of the applicant, the Commission deferred this case to their regularly scheduled meeting in November 2010. Staff (10/21/09): The applicant was advised in writing that any significant, new or revised information should be submitted no later than September 20, 2010 for consideration at the Commission's November 2010 public hearing. The applicant was also advised that a $1,000.00 deferral fee must be paid prior to the Commission's public hearing. 20 06SN0220-20141 ~N22-BOS-RPT Staff (10/21/10): To date, no new information has been submitted, nor has the deferral fee been paid. Applicant (ll/15/10): The deferral fee was paid. Planning Commission Meeting (11/16/10): At the request of the applicant, the Commission deferred this case to their regularly scheduled meeting in March 2012. Staff (11/17/10): The applicant was advised in writing that any significant, new or revised information should be submitted no later than January 3, 2012 for consideration at the Commission's March 2012 public hearing. The applicant was also advised that a $1,000.00 deferral fee must be paid prior to the Commission's public hearing. Applicant (2/22/11): The application was amended to correct the acreage. Staff (3/2/12): To date, the deferral fee has not been paid. Applicant (3/20/12): The deferral fee was paid. Planning Commission Meeting (3/20/12): On their own motion and with the applicant's consent, the Commission deferred this case to their November 15, 2012 public hearing. 21 06SN0220-20141 ~N22-BOS-RPT Staff (3/21/12): The applicant was advised in writing that any significant, new or revised information should be submitted no later than August 31, 2012 for consideration at the Commission's November 15, 2012 public hearing. Applicant (10/8/12): The application was amended to remove the request for relief from street access requirements and the request to waive street connectivity requirements. Planning Commission Meeting (11/15/12): On their own motion and with the applicant's consent, the Commission deferred this case to Febniary 19, 2013. Staff (11/15/12): The applicant was advised in writing that any significant new or revised information should be submitted no later than November 21, 2012 for consideration at the Commission's Febniary 19, 2013 public hearing. Staff (1/29/13): To date, no new or revised information has been submitted. Planning Commission Meeting (2/19/13): On their own motion, and with the applicant's consent, the Commission deferred this case to May 21, 2013. Staff (2/20/13): The applicant was advised in writing that any significant new or revised information should be submitted no later than March 11, 2013 for consideration at the Commission's May 21, 2013 public hearing. 22 06SN0220-20141 ~N22-BOS-RPT Staff (5/2/13): To date no new or revised information has been received. Planning Commission Meeting (5/21/13): On their own motion, and with the applicant's consent, the Commission deferred this case to their August 20, 2013 public hearing. Staff (5/22/13): The applicant was advised in writing that any significant, new or revised information should be submitted no later than June 10, 2013 for consideration at the Commission's August 20, 2013 public hearing. Staff (7/25/13): To date, no new information has been received. Planning Commission Meeting (8/20/13): On their own motion, and with the applicant's consent, the Commission deferred this case to their November 19, 2013 public hearing. Staff (8/21/13): The applicant was advised in writing that any significant, new or revised information should be submitted no later than September 9, 2013 for consideration at the Commission's November 19, 2013 public hearing. Applicant (9/30, 10/4, 10/7, 10/21 and 10/28/13): Revisions to proffered conditions and proposed connectivity were submitted. Planning Commission Meeting (11/19/13): The applicant's representative accepted the recommendation. There was opposition present expressing concern relative to increased traffic along Fordham Road and the lack of sidewallcs along the road. Opposition also expressed concerns relative to increased 23 06SN0220-20141 ~N22-BOS-RPT traffic along Newbys Wood Trail if a public road connection is made from the proposed development to the Newbys Woods Subdivision. In response to neighborhood concerns, Dr. Brown stated that he would be supportive of a waiver to street connectivity so no public road access would be provided to Newbys Wood Trail. In response to a question from Dr. Brown, the Fire Department acknowledged that an emergency access to Newbys Wood Trail would enhance emergency access for Newbys Wood Subdivision more so than providing increased emergency access for the proposed development. The applicant agreed to include a waiver to street connectivity to Newbys Wood Trail and to proffer that an emergency access would be constricted. (Proffered Condition 14) On motion of Dr. Brown, seconded by Mr. Patton, the Commission recommended approval of Request I (Rezoning) and acceptance of the proffered conditions on pages 2 through 6. AYES: Messrs. Brown, Wallin, Gulley, Patton and Waller. On motion of Dr. Brown, seconded by Mr. Gulley, the Commission recommended approval of Request II (waiver to the street connectivity requirements for Land Grant Drive and Newbys Wood Trail) and acceptance of Proffered Condition 14 on page 6. AYES: Messrs. Brown, Wallin, Gulley, Patton and Waller. Board of Supervisors (12/11/13): On their own motion, and with the applicant's consent, the Board of Supervisors deferred this case to their January 22, 2014 public hearing. Staff (12/12/13): The applicant was advised in writing that any significant, new or revised information should be submitted no later than December 16, 2013 for consideration at the Board's January 22, 2014 public hearing. Staff (1/6/14): To date no new or revised information has been received. The Board of Supervisors, on Wednesday, January 22, 2014 beginning at 6:30 p.m., will take under consideration this request. 2~ OEiSN0220-20141_~N22-BOS-RPT ~ w ,. , ~~ ~ ~ ~M ` ~ , ...~ 4 O ... U i I ~ I I ~ ~II~ ~ ~~ I ~ ~ ~ ,~ u, 4 ~ ~~ ~~~No22o - Thc~rc:aut~hfiir~ Fl~~n ~~. T.. ,,- ~ ~~~ ~ ~ ~~ 2,00 . Fe~ d]0] AexialPbagxapl~y Diselaiver All data u Faovided "AS IS"The Ceeim~vrealtho(Vu~xoa, ^e Vu~xoa Geographic Ixd'omution Network and Heir rezcective d&cerz, agm4 and empbyeez jointly and zevexa¢ydisclvm Cojnnrglri(~2009 Chesl.et£ieldC ounty, Vugime myax'all reyvezeatamxs orwaxxaxme:,e:yvezz orhaplied,wxittaaororal, inftoraxisixigbyogxati~d'law, 2002 AerialPhotngephy-Pvblic Domain vchxdixig anywaxxmnies ofxneslantabilitx litresz (e apaxticular prxpoze, accurst' cure y ~xeereial vaLre, Prirded ty ESPI~MArcGIS*r" ar &eedomofdata &omuu}uigeementofany thud paNy udellecbral pmp=.Hy rigks. Chesletfield County asssnes rm legal responsibdityfoe the irfform etion contained onihis map. 7Y,is map is notbe umdfor lurid comre}rance. Horizwrtal date is based en the VA State Place Cowdizzate m NAD Topogephic int'wmstionistaseden 198 06SN0221