Loading...
15SN0603 CASE NUMBER: 15SN0603 APPLICANT: Cellco Partnership d/b/a Verizon Wireless CHESTERFIELD COUNTY, VIRGINIA Magisterial District:MATOACA ADDENDUM Board of Supervisors (BOS) Public Hearing Date: NOVEMBER 19, 2014 BOS Time Remaining: 365 DAYS Applicant’s Agent: JENNIFER D. MULLEN (804-977-3374) Applicant’s Contact: CLARE NOVAK (804-477-4349) Planning Department Case Manager: RYAN RAMSEY (804-768-7592) APPLICANT’S REQUEST Conditional use to permit a communications tower. A 122-foot communications tower and associated improvements are planned. (NOTES: A. Conditions may be imposed or the property owner may proffer conditions. B. Proffered conditions arelocated in Attachment 1.) ADDENDUM The purpose of this addendum is to advise the Board of the Planning Commission’s recommendation for this case, update the community meeting discussion, and provide a staff note to Proffered Condition 4.c. in Attachment 1. A staff note was added to Proffered Condition 4.c. in Attachment 1 to clarify that the applicant’s proposal will include the design and construction of a “slick stick” monopole tower. RECOMMENDATION RECOMMEND APPROVAL PLANNING Request complies with Comprehensive Planand is consistent COMMISSION with Telecommunications Tower Siting Policy criteria (11/18/2014) AYES: MESSRS. WALLIN, PATTON, BROWN ,GULLEY AND WALLER Providing a FIRST CHOICE community through excellence in public service CASE HISTORY Applicant Submittals 10/7/14Application submitted 11/6/14Proffers were submitted 11/7/14Revised proffers were submitted Community Meeting 11/12/14 Issues Discussed Matoaca Planning Commissioner, the applicant and staff attended this meeting at the Chesdin Landing club house Height and corresponding coverage area of the tower General consensus of support for the tower proposal Planning Commission Meeting 11/18/14 Citizen Discussion No citizens spoke to this case. Commission Discussion The applicant’scommunications tower request will be in conformance with Comprehensive Planand is consistent with Telecommunications Tower Siting Policy criteria. Recommendation –APPROVAL AND ACCEPTANCE OF THE PROFFERED CONDITIONS IN ATTACHMENT 1 Motion: Wallin; Seconded: Gulley AYES:Wallin, Patton, Brown, Gulley, and Waller. 215SN0603-2014NOV19-BOS-ADD ATTACHMENT 1 PROFFERED CONDITIONS Note: “STAFF/CPC” –Recommended by both staff and Planning Commission 1. The flagpole/tower shall be located as generally depicted on the plans (STAFF/CPC) and elevations prepared by Dewberry Engineers Inc., titled Verizon Wireless: Chesdin Landing, 21801 Lake Chesdin Parkway and identified as Attachments 2 and 3 in the “Request Analysis and Recommendation”. (P) 2. There shall be no signs permitted to identify this use. (P) (STAFF/CPC) 3. The base of the tower shall be enclosed by a minimum six (6) foot high (STAFF/CPC) fence designed to preclude trespassing. The fence shall be placed so as to provide sufficient room between the fence and the lease boundary line to accommodate evergreen plantings having an initial height and spacing to provide screening of the base of the tower and accessory ground- mounted equipment or structures from adjacent properties. A detailed plan depicting this requirement shall be submitted to the Planning Department for approval in conjunction with final site plan review. (P) 4. The color, design and lighting system for the tower shall be as follows: (STAFF/CPC) a.The tower shall be gray or another neutral color, acceptable to the Planning Department. b.The tower shall not be lighted. c.The tower shall be designed and erected as a stealth monopole with internally mounted antennas. (P) (NOTE: The tower will be designed and constructed as a “slick stick” monopole, as depicted in the elevation drawing attached with the staff report.) 5. Any building or mechanical equipment shall comply with the Zoning (STAFF/CPC) Ordinance relative to architectural treatment of building exteriors and screening of mechanical equipment in O, C and I Districts. (P) (NOTE: The Zoning Ordinance requires the screening of mechanical equipment located on the building or ground from adjacent properties and public rights of way. Screening would not be required for the tower.) 6. Prior to use of this telecommunications tower, the owner of the tower (STAFF/CPC) shall obtain approval of the structural integrity by a registered 315SN0603-2014NOV19-BOS-ADD professional engineer licensed in Virginia and a copy of the report filed with the Planning Department. (P) 7. The tower shall not exceed a height of 122 feet. (P) (STAFF/CPC) 8. At such time that the tower ceases to be used for communications (STAFF/CPC) purposes for a period exceeding twelve (12) consecutive months, the owner/developer shall dismantle and remove the tower and all associated equipment from the property. (P) 9. A thirty (30’) foot tree preservation area shall be provided on the (STAFF/CPC) Property (the “Tree Buffer”), as identified on Attachment 2. Such area shall comply with the requirements of the Zoning Ordinance for buffers less than fifty (50) feet. (P) 415SN0603-2014NOV19-BOS-ADD CASE NUMBER: 15SN0603 APPLICANT: Cellco Partnership d/b/a Verizon Wireless CHESTERFIELD COUNTY, VIRGINIA Magisterial District:MATOACA STAFF’SANALYSIS AND RECOMMENDATION Board of Supervisors (BOS) Public Hearing Date: NOVEMBER 19, 2014 BOS Time Remaining: 365 DAYS Applicant’s Agent: Jennifer D. Mullen (804-977-3374) Applicant’s Contact: Clare Novak (804-477-4349) Planning Department Case Manager: Ryan Ramsey (804-768-7592) APPLICANT’S REQUEST Conditional use to permit a communications tower. A 122-foot communications tower and associated improvements are planned. (NOTES: A. Conditions may be imposed or the property owner may proffer conditions. B. Proffered conditions arelocated in Attachment 1.) RECOMMENDATION THE PLANNING COMMISSION IS SCHEDULED TO HEAR THIS CASE AT PLANNING THEIR MEETING ON TUESDAY, NOVEMBER 18, 2014. STAFF WILL COMMISSION ADVISE THE BOARD OF THE COMMISSION’S ACTION AFTER THEIR (11/18/2014) MEETING. RECOMMEND APPROVAL Tower location and design complies with Comprehensive Plan STAFF Proposal is consistent with Telecommunications Tower Siting Policy criteria Providing a FIRST CHOICE community through excellence in public service SUMMARY OF IDENTIFIED ISSUES DepartmentIssue PLANNING- FIRE- CDOT- VDOT- UTILITIES- ENVIRONMENTAL - ENGINEERING 215SN0603-2014NOV19-BOS-RPT 315SN0603-2014NOV19-BOS-RPT Map 2: Comprehensive Plan Classification: RESIDENTIAL AGRICULTURAL The designation suggests the property is appropriate for a maximum of 0.5 dwellings per acre . Map 3: Surrounding Land Uses & Development Golf Course & Recreation Center Lake Chesdin Parkway Undeveloped Portion of Chesdin Landing Subdivision Chesdin Green Way 415SN0603-2014NOV19-BOS-RPT PLANNING Staff Contact: Ryan Ramsey (804-768-7592) ramseyrp@chesterfield.gov ZONING HISTORY Case NumberBOS Action Request 95SN0161Approved Rezoned from Agricultural (A) to Residential (R-88) with a (12/14/1994) conditional use to permit private recreational facilities. 95SN0226Approved Conditional use to permit a golfcourse. (2/22/1995) 02SN0111Approved Amendment to Case 95SN0161 relative to an increase the (9/6/2001)number of permitted dwellings plus an increase in the permitted acreage for a private recreational facility. PROPOSAL A 122-foot communications tower isproposed within the Chesdin Landing recreational center. PUBLIC FACILITIES PLAN The Public Facilities Plan, an element of the Comprehensive Plan, encourages: co-location on existing telecommunications towers, or architectural incorporation into existing building features Where co-location or architectural incorporation is not feasible, in areas designated for Residential Agricultural use, the Plansuggests: towers not be located in highly visible areas, and natural features such as topography and streams be used to provide transition between existing and future residential development TOWER SITING POLICY The Policy establishes guidelines for design, setbacks and security. Elements of the Policy are as follows: •Discourages sectored arrays in residential areas •Limits size of satellite and microwave dish antennas •Requires certification of structural integrity •Requires setbacks from existing off-site dwellings, and public rights-of-way (not withstanding Ordinance setback requirements) •Prohibits signs, except as required by state or federal guidelines •Requires security fence to preclude trespassing •Provides for screening of tower base and ground mounted equipment 515SN0603-2014NOV19-BOS-RPT The following provides an overview of conditions offered by the applicantto mitigate the impact of the toweron area properties: GeneralOverview Requirements Details Tower location and access depicted onAttachment 2. Approximately 332’ feet from Lake Chesdin Parkway, Location within recreationalcenter and adjacent to golf course. Proffered Condition 1 Planand Policy Requires the tower to be: A neutral color that is approved by the Planning Department; Tower Design Not be lighted, and; Designed as a stealth monopole tower. Proffered Condition 4 Plan Thirty (30) foot tree preservation area adjacent to Lake Chesdin Parkway to north, golf course to south, and Tree Preservation undeveloped residential area to east. Proffered Condition 9 Plan No signage permitted. Signage Proffered Condition 2 Policy Requires security fence to preclude trespassing. Proffered Condition 3 Policy Fencing andScreening of Tower Meet screening requirements of tower base and Base ground mounted equipmentfor development in O, C or I Districts. Proffered Condition 5 Policy Requires the submittal of a report, verified by a registered professional engineer, to ensure the structural integrity of the Structural Integrity tower. Proffered Condition 6 Policy Not to exceed 122 feet. Tower Height Proffered Condition 7 Requires removal of tower and equipment if use ceases for more than twelve (12) months. Cessation of Use Proffered Condition 8 Policy As proffered, the proposed communications tower complies with the Comprehensive Planand is consistent with Telecommunications Tower Siting Policycriteria. 615SN0603-2014NOV19-BOS-RPT PUBLIC FACILITIES FIRE SERVICE Staff Contact: Greg Smith (804-706-2012)smithgd@chesterfield.gov Nearby Fire and Emergency Medical Service (EMS)Facilities Fire Station Phillips Fire Station, Company Number 13 EMS Facility Winterpock Fire Station, Company Number 19 The request will have a minimal impact on Fire and EMS services. COUNTY DEPARTMENT OF TRANSPORTATION Staff Contact: Jim Banks (804-748-1037) banksj@chesterfield.gov The Comprehensive Plan, which includes theThoroughfare Plan, identifiescounty-wide transportation needs that are expected to mitigate traffic impacts of future growth. The anticipated traffic impact of the proposal has been evaluated and it is anticipated to be minimal. VIRGINIA DEPARTMENT OF TRANSPORTATION Staff Contact: Brian Lokker (804-674-2384) brian.lokker@vdot.virginia.gov VDOT Land Use Regulations Traffic Impact Analysis (24VAC30-155) - Access Management (24VAC30-73) - Subdivision Street Acceptance (24VAC30-91/92)- Land Use Permit (24VAC30-151)- SummaryVDOT has no comment on this request. 715SN0603-2014NOV19-BOS-RPT WATER AND WASTEWATER SYSTEMS Staff Contact: Jamie Bland (804-751-4439) blandj@chesterfield.gov The proposed communications tower will not be connected to the public water and wastewater systems. The request will not impact the public water and wastewater systems. Water and Wastewater Systems Currently Sizeof Existing LineConnection Required by County Code? Serviced? WaterYes 8”Yes WastewaterNoN/A No COUNTY COMMUNICATIONS Staff Contact: Robert Vest(804-717-6950) vestr@chesterfield.gov The Zoning Ordinance requires that any structure over eighty (80) feet in height be reviewed by the County’s Public Safety Review Team for potential detrimental impacts the structure could have on the County’s Radio Communications System microwave paths. This determination must be made prior to construction of the communications tower. COUNTY AIRPORT Staff Contact: Patrick Driscoll(804-768--7720) driscollp@chesterfield.gov A preliminary review of this proposal indicates that, given the approximate location and elevation of the proposed installation, there will be no adverse affect on the County Airport. ENVIRONMENTAL Drainage, Erosion and Water Quality Staff Contact: Doug Pritchard (804-748-1028)pritchardd@chesterfield.gov Environmental Engineeringhas no comment on this request. 815SN0603-2014NOV19-BOS-RPT CASE HISTORY Applicant Submittals 10/7/14Application submitted 11/6/14Proffers were submitted 11/7/14Revised proffers were submitted Community Meetings 11/12/14Community meeting is scheduled. Planning Commission Meetings 11/18/14This case is double advertised. If the Planning Commission acts on this request on November 18, 2014, the case will be considered by the Board of Supervisors on November19, 2014. 915SN0603-2014NOV19-BOS-RPT ATTACHMENT 1 PROFFERED CONDITIONS 1.The flagpole/tower shall be located as generally depicted on the plans and elevations prepared by Dewberry Engineers Inc., titled Verizon Wireless: Chesdin Landing, 21801 Lake Chesdin Parkway and identified as Attachments 2 and 3 in the “Request Analysis and Recommendation”. (P) 2.There shall be no signs permitted to identify this use. (P) 3.The base of the tower shall be enclosed by a minimum six (6) foot high fence designed to preclude trespassing. The fence shall be placed so as to provide sufficient room between the fence and the lease boundary line to accommodate evergreen plantings having an initial height and spacing to provide screening of the base of the tower and accessory ground-mounted equipment or structures from adjacent properties. A detailed plan depicting this requirement shall be submitted to the Planning Department for approval in conjunction with final site plan review. (P) 4.The color, design and lighting system for thetower shall be as follows: a.The tower shall be gray or another neutral color, acceptable to the Planning Department. b.The tower shall not be lighted. c.The tower shall be designed and erected as a stealth monopole with internally mounted antennas. (P) 5.Any building or mechanical equipment shall comply with the Zoning Ordinance relative to architectural treatment of building exteriors and screening of mechanical equipment in O, C and I Districts. (P) (NOTE: The Zoning Ordinance requires the screening of mechanical equipment located on the building or ground from adjacent properties and public rights of way. Screening would not be required for the tower.) 6.Prior to use of this telecommunications tower, the owner of the tower shall obtain approval of the structural integrity by a registered professional engineer licensed in Virginia and a copy of the report filed with the Planning Department. (P) 7.The tower shall not exceed a height of 122 feet. (P) 8.At such time that the tower ceases to be used for communications purposes for a period exceeding twelve (12) consecutive months, the owner/developer shall 1015SN0603-2014NOV19-BOS-RPT dismantle and remove the tower and all associated equipment from the property. (P) 9.A thirty (30’) foot tree preservation area shall be provided on the Property (the “Tree Buffer”), as identified on Attachment 2. Such area shall comply with the requirements of the Zoning Ordinance for buffers less than fifty (50) feet. (P) 1115SN0603-2014NOV19-BOS-RPT ATTACHMENT 2 SITE LAYOUT 1215SN0603-2014NOV19-BOS-RPT ATTACHMENT 3 TOWER ELEVATION 1315SN0603-2014NOV19-BOS-RPT