15SN0628
CASE NUMBER: 15SN0628
APPLICANT: ME Founders Bridge, LLC and Eagle Construction of Va., LLC
CHESTERFIELD COUNTY, VIRGINIA
Magisterial District: MIDLOTHIAN
STAFF’S ANALYSIS
AND
RECOMMENDATION
Board of Supervisors (BOS)
Public Hearing Date:
May 27, 2015
BOS Time Remaining:
365 DAYS
Applicant’s Agent:
MARK KUKOSKI
(804-741-4663)
Applicant’s Contact:
KATE COOPER
(804-741-4663)
Planning Department Case Manager:
DARLA ORR (804-717-6533)
APPLICANT’S REQUEST
Amendment of zoning (Case 05SN0320) to reduce cash proffers in a Residential (R-25) District.
Specifically, the applicant requests to amend Proffered Condition 10 of Case 05SN0320 to reduce
the cash proffer to the Board’s maximum acceptable cash proffer and to delay the escalator as
outlined in the Cash Proffer Policy.
Single family residential dwellings are being developed as Section 5 of the Founders Bridge
subdivision.
(NOTES: A. The only condition that may be imposed is a buffer condition. The property owner may proffer
conditions.
B. A proffered condition and approved conditions of Case 05SN0320 are located in Attachments 1 and 2)
RECOMMENDATION
PLANNING RECOMMEND APPROVAL
COMMISSION
(4/21/15)
RECOMMEND APPROVAL
STAFF
Addresses development impacts
Providing a FIRST CHOICE community through excellence in public service
SUMMARY OF IDENTIFIED ISSUES
Department Issue
PLANNING
BUDGET AND
MANAGEMENT
FIRE
PARKS AND
RECREATION
LIBRARIES
SCHOOLS
CDOT
VDOT
UTILITIES
ENVIRONMENTAL
ENGINEERING
215SN0628-2015MAY27-BOS-RPT
315SN0628-2015MAY27-BOS-RPT
TABLE A
REQUEST PROPERTIES
717-716-5691 2701 Michaux Valley Way
717-716-6281 2631 Michaux Valley Way
717-716-6673 2625 Michaux Valley Way
717-716-6860 2619 Michaux Valley Way
717-716-7449 2613 Michaux Valley Way
717-716-7938 2607 Michaux Valley Way
717-716-8190 14866 Michaux Valley Circle
717-716-8227 2601 Michaux Valley Way
717-716-8415 2525 Michaux Valley Way
717-716-9085 14848 Michaux Valley Circle
717-716-9676 14842 Michaux Valley Circle
717-717-0781 2707 North Otterdale Road
717-717-4025 2719 Michaux Valley Way
717-717-4410 2713 Michaux Valley Way
717-717-5001 2707 Michaux Valley Way
717-717-6522 2706 Michaux Valley Way
717-717-7210 2700 Michaux Valley Way
717-717-8312 14861 Michaux Valley Circle
717-717-9608 14855 Michaux Valley Circle
718-715-0071 2500 Michaux Valley Way
718-715-0888 2506 Michaux Valley Way
718-716-0245 14800 Michaux Valley Circle
718-716-0365 14836 Michaux Valley Circle
718-716-0922 14801 Michaux Valley Circle
718-716-1301 2512 Michaux Valley Way
718-716-1355 14818 Michaux Valley Circle
718-716-1591 14843 Michaux Valley Circle
718-716-1811 2518 Michaux Valley Way
718-716-2029 14807 Michaux Valley Circle
718-716-2281 14837 Michaux Valley Circle
718-716-2838 14813 Michaux Valley Circle
718-716-2973 14831 Michaux Valley Circle
718-716-3449 14819 Michaux Valley Circle
718-717-0602 14849 Michaux Valley Circle
415SN0628-2015MAY27-BOS-RPT
Map 2: Comprehensive Plan
Classification: LOW DENSITY RESIDENTIAL
The designation suggests the property is appropriate for single family residential use of 1.0 dwelling per
acre.
Map 3: Surrounding Land Uses & Development
Single family residential use –
Route 288
Founders BridgeSubdivision
N Otterdale Rd
Single family residential use
–Rosemont Subdivision
515SN0628-2015MAY27-BOS-RPT
PLANNING
Staff Contact: Darla Orr (804-717-6533) orrd@chesterfield.gov
ZONING HISTORY
Case Number BOS Action Request
Rezone A to R-12; Single family development with
maximum of 40 lots (current case includes 34 of
the 40 permitted lots)
Developed as part of Founders Bridge
Approved conditions:
APPROVED
05SN0320
- Minimum lot size, width & setbacks compatible
10/26/2005
with Founders Bridge
-Minimum house size (gross floor area) - 2,500
square feet
- Cash proffer of $15,600 per dwelling unit
Attachment 2
615SN0628-2015MAY27-BOS-RPT
FINANCIAL IMPACT ON CAPITAL FACILITIES
Budget and Management
Staff Contact: Natalie Spillman (717-8767) spillmann@chesterfield.gov
The need for schools, parks, libraries, fire stations and transportation facilities in this area is
identified in the County’s adopted Public Facilities Plan, Thoroughfare Plan and Adopted Capital
Improvement Program and further detailed by specific departments in the applicable sections
of this request analysis.
This proposed development will have an impact on capital facilities. Staff has calculated the
fiscal impact of every new dwelling unit on schools, roads, parks, libraries and fire stations at
$21,261 per unit.
The original zoning (Case 05SN0320) was approved in October 2005 with a density of 40 units
and with the maximum cash proffer at the time of $15,600 per dwelling units (currently
escalated by the Marshall and Swift Building Cost Index to $22,245 per unit).
The applicant has requested to reduce the previously approved cash proffers of $15,600
(currently escalated to $22,245) to the current maximum of $18,966 per unit. These cash
proffers would defray the cost of the capital facilities necessitated by this proposed
development. Based on the number the remaining units to be built, this amended cash proffer
would only apply to the remaining 34 units to be built.
The current Cash Proffer Policy allows the County to assess the impact of all dwelling units in
previously approved zoning cases that come back before the Planning Commission and Board of
Supervisors using the calculated capital facility costs in effect at the time the case is
reconsidered. If accepted, the amended cash proffer would remain at $18,966 for a period of
four years after which it would be escalated by the cumulative change in the Marshall and Swift
Building Cost Index, a provision recently adopted by the Board of Supervisors.
While appropriate to maintain the cash proffer of $15,600 (currently escalated to $22,245)
approved with Case 05SN0320, the Board of Supervisors has set the current maximum cash
proffer at $18,966, an amount lower than the escalated cash proffer amount approved with the
original case.
Note that circumstances relevant to this case as presented by the applicant have been
reviewed, and it has been determined that it is appropriate to accept the maximum cash
proffer of $18,966 for each dwelling unit.
715SN0628-2015MAY27-BOS-RPT
Per Dwelling Unit Impact on Capital Facilities
(1)
34
Potential Units
Facility Cash Proffer on Existing Applicant's Proposal
FY15 Calculated Impact
Categories Zoning (Current BOS Maximum)
Total $21,261 $22,245 $18,966
Overall Impact on Capital Facilities
Schools $318,784 $339,558 $284,376
Parks$45,118 $45,968 $40,256
Libraries $11,560 $13,600 $10,302
Fire
$26,724 $22,236 $23,834
Stations
Roads $320,688 $347,276 $286,076
Total $722,874 $768,638 $644,844
(1)
Based on the number of remaining units to be built
815SN0628-2015MAY27-BOS-RPT
PUBLIC FACILITIES
FIRE SERVICE
Staff Contact: Greg Smith (804-706-2012) smithgd@chesterfield.gov
The mission of Fire and Emergency Medical Services (EMS) is to protect life, property and the
environment through a comprehensive fire and life safety program that ensures an adequate
and timely response to emergencies. The Public Facilities Plan, as part of the Comprehensive
Plan, indicates:
County-wide Fire & EMS Service Information & Needs
New 5
Recommendations for Fire Stations
by 2022
Replacement/Revitalization 4
Fire 24%
1
2011 Incidents as a percent of total
EMS (Emergency Medical Services) 76%
Fire/EMS Increases in Call Volume
44%
from 2001 and 2011
County Population Increase from
17%
2001 to 2011
1
With the aging of population, medical emergency incidents are expected to increase faster than the rate of
population growth over time.
Fire Service - Project Impacts
Estimated Number of Calls for
6
Service Annually
Applicant’s Proposal to Address Offered in Accordance with Policy
1
Impacts Proffered Condition
1
The financial impact of residential development on fire facilities is addressed in the “Financial Impact on Capital
Facilities” section of the report.
Additional Information:
When the property is developed, the number of hydrants, quantity of water needed for fire
protection, and access requirements will be evaluated during the plans review process.
Information relative to nearby fire and emergency service facilities can be found in Attachment
3
915SN0628-2015MAY27-BOS-RPT
PARKS AND RECREATION
Staff Contact: Brian Geouge (318-8720) geougeb@chesterfield.gov
The County supports a high-quality park system to provide residents and visitors with equitable
access to active and passive recreation opportunities. The Public Facilities Plan, as part of the
Comprehensive Plan, indicates:
County-wide Parks and Recreation Needs
Park TypeNumber of New Parks Aggregate Acreage
Regional 3600
Community10 790
Neighborhood 9180
Special Purpose 3 1 -
Urban 2 - -
Linear 3 - -
1
The Public Facilities Plan notes facility recommendations for water-based parks. All other facilities are acquired
and developed on a site-by-site basis.
2
Facilities are recommended in urban areas where there is limited acreage available for park development.
3
Facility needs are assessed on a site-by-site basis as recommended in the Public Facilities Plan.
Parks and Recreation – Project Impacts
5.9 Acres of Regional, Community and/or Neighborhood
2012 County Level of Service
parkland per 1,000 persons
9 Acres of Regional, Community and/or Neighborhood
Target Level of Service
parkland per 1,000 persons
Applicant’s Proposal to Address Offered in Accordance with Policy
1
Impacts Proffered Condition
1
The financial impact of residential development on parks facilities is addressed in the “Financial Impact on Capital
Facilities” section of the report.
Additional Information:
Information relative to nearby parks and recreation facilities can be found in Attachment 3.
1015SN0628-2015MAY27-BOS-RPT
LIBRARIES
Staff Contact: Debra Winecoff (751-4475)winecoffd@chesterfield.gov
The public library system’s role in the county has expanded beyond its traditional function as a
resource for information and materials, and now serves as a community gathering place for
educational, cultural and informational services; community support during emergencies;
economic development; and revitalization activities. The Public Facilities Plan, as part of the
Comprehensive Plan,indicates:
County-wide Library Needs
Facility ActionCounty-wide Facility Needs
Expand or Replace 5 Libraries
Construction of New 5 Libraries
Facilities
1 Community Arts Center
Libraries -Project Impacts
2011 County Level of Service0.45 square feet of library space per person
Standard Level of Service 0.82 square feet of library space per person
Applicant’s Proposal to Offered in Accordance with Policy
1
Address Impacts Proffered Condition
1
The financial impact of residential development on library facilities is addressed in the “Financial Impact on
Capital Facilities” section of the report.
Additional Library Information:
Information relative to nearby library facilities can be found in Attachment 3
1115SN0628-2015MAY27-BOS-RPT
SCHOOLS
Staff Contact: Dr. Cynthia O. Richardson (318-8740) cynthia_o_richardson@ccpsnet.net
High performing, high quality public schools contribute to the quality of life and economic
vitality of the County. The Comprehensive Plan suggests a greater focus should be placed on
linking schools with communities by providing greater access, flexible designs and locations that
better meet the needs of the communities in which they are located. The Public Facilities Plan,
as part of the Comprehensive Plan, indicates:
County-wide School Needs
School Types Facilities to Revitalize/Replace New Facilities
Elementary 16 3
Middle 62
High 23
Technical - 1
Schools -Project Impacts
Elementary 7
Middle 4
Average Student Yield
High 5
Total 16
Applicant’s Proposal to Offered in Accordance with Policy
1
Address Impacts Proffered Condition
1
The financial impact of residential development on school facilities is addressed in the “Financial Impact on
Capital Facilities” section of the report.
Additional Information:
After review of this request, based on current school assignments and student enrollment the
proposed rezoning case will have an impact on schools. It is possible that over time this case,
combined with other tentative residential developments and other zoning cases in the area will
continue to push these schools to their capacity and therefore impact the capacity of facilities
division-wide.
Information relative to schools currently serving area can be found in Attachment 3.
1215SN0628-2015MAY27-BOS-RPT
COUNTY DEPARTMENT OF TRANSPORTATION
Staff Contact: Jim Banks (804) 748-1037 banksj@chesterfield.gov
Staff Contact: Steve Adams (804-751-4461) adamss@chesterfield.gov
The Comprehensive Plan, which includes the Thoroughfare Plan, identifies county-wide
transportation needs that are expected to mitigate traffic impacts of future growth. The
anticipated traffic impact of the proposal has been evaluated and recommendations are
detailed in the chart below:
Recommendation Applicant’s Proposal
Cash Proffer Policy
Offered in Accordance with Policy
Proffered Condition
VIRGINIA DEPARTMENT OF TRANSPORTATION
Staff Contact: Brian Lokker (804-674-2384) brian.lokker@vdot.virginia.gov
To date, no comments have been received from the Virginia Department of Transportation
(VDOT).
1315SN0628-2015MAY27-BOS-RPT
WATER AND WASTEWATER SYSTEMS
Staff Contact: Jamie Bland (804-751-4439) blandj@chesterfield.gov
Theproposal’s impacts on the County’s utility system are detailed in the chart below:
Water and Wastewater Systems
Currently Size of Existing LineConnection Required by County Code?
Serviced?
Water No 6” and 8” Yes
Wastewater No 8”Yes
The proposed request will not impact the public water and wastewater systems.
ENVIRONMENTAL
Drainage, Erosion and Water Quality
Staff Contact: Doug Pritchard (804-748-1028) pritchardd@chesterfield.gov
Environmental Engineering has no comment on this request.
1415SN0628-2015MAY27-BOS-RPT
CASE HISTORY
Applicant Submittals
2/16/2015 Application submitted
Community Meeting
3/4/2015 Discussion
School attendance zone for development
Applicant’s development schedule
Pedestrian trail
Board has approved similar reduction in recent cases
4/21/15
Citizen Comments
No citizens spoke to this case.
Recommendation – APPROVAL AND ACCEPTANCE OF THE
PROFFERED CONDITION IN ATTACHMENT 1
Motion: Waller; Seconded: Brown
AYES: Gulley, Waller, Brown, Patton and Wallin
The Board of Supervisorson Wednesday, May 27, 2015, beginning at 6:30 p.m., will consider
this request.
1515SN0628-2015MAY27-BOS-RPT
ATTACHMENT 1
PROFFERED CONDITION
Note:
“STAFF/CPC” –Recommended by both staff and Planning Commission
With the approval of this case, Proffered Condition 10of Case 05SN0320shall be amended as
follows:
(STAFF/CPC) Cash Proffers: For each dwelling unit, the applicant, sub-divider, or assignee(s)
shall pay the following to the County of Chesterfield, prior to the issuance of a
building permit for infrastructure improvements within the cash proffer service
district for the property, unless state law prevents enforcement of that timing:
a)$18,966 per dwelling unit for the period beginning the July 1 preceding
the Board of Supervisors’ approval of the case through July 1four years
later, at which point the amount will be adjusted for the cumulate change
in the Marshall and Swift Building Cost index during that time period.
b)Thereafter, the per dwelling unit cash proffer amount shall be
automatically adjusted, annually, by the annual change in the Marshall
and Swift Building Cost Index on July 1 of each year.
c)Cash proffer payments shall be spent for the purposes proffered or as
otherwise permitted by law. (B)
1615SN0628-2015MAY27-BOS-RPT
ATTACHMENT 2
CASE 05SN0320
1715SN0628-2015MAY27-BOS-RPT
1815SN0628-2015MAY27-BOS-RPT
1915SN0628-2015MAY27-BOS-RPT
2015SN0628-2015MAY27-BOS-RPT
2115SN0628-2015MAY27-BOS-RPT
2215SN0628-2015MAY27-BOS-RPT
ATTACHMENT 3
SUPPLEMENTAL PUBLIC FACILITIES STATISTICS
Schools Currently Serving Area
Weaver
RobiousJames River
Elementary
Middle School High School
School
Capacity
Functional Functional Functional
rship
MembershipMembership
% Capacity% Capacity% Capacity
CapacityCapacityCapacity
Categories
Membe
Current
and
Projected
2014 706 74695 1255 1364 92 20702131 97
2
Figures
2015 700 -94 1295 - 95 2091- 98
2016 708 -95 1329 - 97 2097- 98
2021 771 -1031321 - 97 2334- 110
Trailers Number of
5 6 2
1
Trailers
1
Trailers are not identified in the staff report for schools under 90% capacity.
2
Disclaimer: Please note that Projected Membership AND Functional Capacity are updated on an ANNUAL BASIS.
They are based on the September 30 membership and Space Utilization Study Report for a given year. School
boundary adjustments may be made to address over capacity levels.
Nearby Public Facilities
Fire Station Midlothian Fire Station, Company Number 5
EMS Facility Forest View Volunteer Rescue Squad
Library Midlothian Library
Parks & Recreation Watkins Annex and Mid-Lothian Mines Park
2315SN0628-2015MAY27-BOS-RPT