15SN0632
CASE NUMBER:15SN0632
APPLICANT: D. K. Walters Builder Inc.
CHESTERFIELD COUNTY, VIRGINIA
Magisterial District: BERMUDA
STAFF’SANALYSIS
AND
RECOMMENDATION
Board of Supervisors (BOS)
Public Hearing Date:
JUNE 24, 2015
BOS Time Remaining:
365 DAYS
Applicant’s Contact:
DAN WALTERS
(804-641-7860)
Planning Department Case Manager:
RYAN RAMSEY (804-768-7592)
APPLICANT’S REQUEST
Amendment of zoning (Case 06SN0158) to reduce cash proffers in a Residential (R-12) District.
A single-family residential subdivisionhas been recorded and partially completed.
(NOTES: A. Conditions may be imposed or the property owner may proffer conditions.
B. A proffered condition islocated in Attachment 1.)
RECOMMENDATION
RECOMMEND APPROVAL
Scope of cash proffer reduction is minimal, given the size of the
PLANNING applicant’s development
COMMISSION
Proffered conditions ensure quality building materials, design
(5/19/15)
and house sizes
AYES:Waller, Brown, and Patton
NAYS: Gulley and Wallin
RECOMMEND DENIAL
STAFF
Request does not address impacts on capital facilities
Providing a FIRST CHOICE community through excellence in public service
SUMMARY OF IDENTIFIED ISSUES
DepartmentIssue
PLANNING-
BUDGET AND Fails to fully address the development’s impact in accordance with
MANAGEMENT Board’s Cash Proffer Policy
Fails to fully address development’s impact on fire and EMS in
FIRE
accordance with Board’s Cash Proffer Policy
PARKS AND Fails to fully address development’s impact on parks and recreational
RECREATIONfacilities in accordance with Board’s Cash Proffer Policy
Fails to fully address development’s impact on library facilities in
LIBRARIES
accordance with Board’s Cash Proffer Policy
Fails to fully address development’s impact on school facilities in
SCHOOLS
accordance with Board’s Cash Proffer Policy
Fails to fully address development’s impact on traffic in accordance
CDOT
with Board’s Cash Proffer Policy
VDOT-
UTILITIES-
ENVIRONMENTAL
-
ENGINEERING
215SN0632-2015JUN24-BOS-RPT
315SN0632-2015JUN24-BOS-RPT
Map 2: Comprehensive Plan(The Chester Plan)
Classification: RESIDENTIAL
The designation suggests the property is appropriate for 2.5dwellings per acre.
Map 3: Surrounding Land Uses & Development
Chester
Osborne Road
Heights
Subdivision
Warfield Estates
Subdivision
Warfield Estates Drive
415SN0632-2015JUN24-BOS-RPT
PLANNING
Staff Contact: Ryan Ramsey (804-768-7592) ramseyrp@chesterfield.gov
ZONING HISTORY
Case NumberBOS Action Request
ApprovedRezoning from A to R-12 of 2.0 acres to permit the
06SN0158
(02/22/2006) development of three (3) single-family residential lots.
PROPOSAL
Asingle-family residential subdivision, known as Holly Haven,has been recorded and partially
developed. The subdivision consists of three (3) undeveloped subdivision lots.
In response to concerns expressed by the Bermuda District Commissioner relative to house size,
building materials and design, on May 19, 2015, the applicant submitted several new proffered
conditions. The following provides an overview of staff’s recommended conditions related to the
road frontage and design standards for the proposed single-family dwelling:
GeneralOverview
Requirements Details
Material limited to brick or stone
Foundation
Proffered Condition 2
Limit building materials on exterior façade to:
Brick, stone, masonry
Stucco
Building Materials
EIFS
Lap Siding (Includes premium quality vinyl with
0.40” minimum thickness)
Proffered Condition 3
Dimensional shingles with a 30-year minimum warranty
Roof Material
Proffered Condition 4
Limit construction and building materials for front
porches:
Masonry wall or piers to support porch
Lattice between exposed porch piers
Porches, Stoopsand Decks
Minimum 5’ porch depth
Permit masonry or finished wood steps
Material and support requirements for
railings and handrails
Proffered Condition 5
Minimum gross floor area of 1,600 square feet for a one-
story dwelling or 1,800 square feet for a dwelling greater
Minimum House Size
than one-story
Proffered Condition 6
515SN0632-2015JUN24-BOS-RPT
FINANCIAL IMPACT ON CAPITAL FACILITIES
Budget and Management
Staff Contact: Natalie Spillman (804-717-8767) spillmann@chesterfield.gov
The need for schools, parks, libraries, fire stations and transportation facilities in this area is
identified in the County’s adopted Public Facilities Plan, Thoroughfare Plan and Adopted Capital
Improvement Program and further detailed by specific departments in the applicable sections
of this request analysis.
This proposed development will have an impact on capital facilities. Staff has calculated the
fiscal impact of every new dwelling unit on schools, roads, parks, libraries and fire stations at
$21,261 per unit.
The original zoning case 06SN0158 was previously approved for three lots with a cash proffer of
$15,600 (currently escalated to $22,245). The applicant is requesting to reduce the currently
escalated cash proffer of $22,245 back to the amount originally approved by the Board of
Supervisors, $15,600. The proffer also includes language that would freeze the $15,600
contribution for a period of four years after which it would be escalated by the cumulative
change in the Marshall and Swift Building Code Index, a provision recently adopted by the
Board of Supervisors.
The current Cash Proffer Policy allows the County to assess the impact of all dwelling units in
previously approved zoning cases that come back before the Planning Commission and Board of
Supervisors using the calculated capital facility costs in effect at the time the case is
reconsidered. Amended cash proffers would remain unchanged for a period of four years after
which they would be escalated by the cumulative change in the Marshall and Swift Building
Cost Index.
While appropriate to maintain the cash proffer, currently escalated to $22,245 approved with
case 06SN0158, the Board of Supervisors has set the current maximum cash proffer at $18,966,
an amount lower than the currently escalated amount. While, the applicant’s cash proffer of
$15,600 falls short of addressing its impact on capital facilities, the difference between the two
figures, applied to three dwelling units, will have minimal impact on the county’s ability to
provide capital facilities.
The Planning Commission and Board of Supervisors, through their consideration of this request,
may determine that there are unique circumstances relative to this request that may justify
acceptance of proffers as offered for this case.
615SN0632-2015JUN24-BOS-RPT
3*
Per Dwelling Unit Impact on Capital Facilities
Potential
Units
FY15 Cash Proffer Variance
FacilityCurrent BOS Applicant
Calculated on Existing from
CategoriesMaximum Proposal
Impact ZoningMaximum
Schools $9,376 $7,604 $8,364 $6,880 ($1,484)
Parks$1,327 $858 $1,184 $974 ($210)
Libraries$340 $496 $303 $249 ($54)
Fire
$786 $576 $701 $577 ($124)
Stations
Roads$9,432 $12,711 $8,414 $6,920 ($1,494)
Total $21,261 $22,245 $18,966 $15,600 ($3,366)
Overall Impact on Capital Facilities
Schools $28,128 $22,812 $25,092 $20,640 ($4,452)
Parks$3,981 $2,574 $3,552 $2,922 ($630)
Libraries$1,020 $1,488 $909 $747 ($162)
Fire
$2,358 $1,728 $2,103 $1,731 ($372)
Stations
Roads$28,296 $38,133 $25,242 $20,760 ($4,482)
Total $63,783 $66,735 $56,898 $46,800 ($10,098)
*Based on the number of vacant lots per Proffered Condition 6 of case 06SN0158. The actual
number of lots and corresponding impact may vary.
715SN0632-2015JUN24-BOS-RPT
PUBLIC FACILITIES
FIRE SERVICE
Staff Contact: Greg Smith (804-706-2012)smithgd@chesterfield.gov
The mission of Fire and Emergency Medical Services (EMS) is to protect life, property and the
environment through a comprehensive fire and life safety program that ensures an adequate
and timely response to emergencies. The Public Facilities Plan, as part of the Comprehensive
Plan, indicates:
County-wide Fire & EMS Service Information & Needs
New5
Recommendations for Fire Stations
by 2022
Replacement/Revitalization4
Fire 24%
1
2011 Incidents as a percent of total
EMS (Emergency Medical Services)76%
Fire/EMS Increases in Call Volume
44%
from 2001 and 2011
County Population Increase from
17%
2001 to 2011
1
With the aging of population, medical emergency incidents are expected to increase faster than the rate of
population growth over time.
Fire Service - Project Impacts
Estimated Number of Calls for
1
Service Annually
Applicant has not fully addressed impacts on fire and
Applicant’s Proposalto Address EMS facilities (cash proffer not in accordance with
1
Impacts current policy).
Proffered Condition
1
The financial impact of residential development on fire facilities is addressed in the “Financial Impact on Capital
Facilities” section of the report.
Additional Information:
When the property is developed, the number of hydrants, quantity of water needed for fire
protection, and access requirements will be evaluated during the plans review process.
Information relative to nearby fire and emergency service facilities can be found in Attachment
2.
815SN0632-2015JUN24-BOS-RPT
PARKS AND RECREATION
Staff Contact: Brian Geouge (804-318-8720) geougeb@chesterfield.gov
The County supports a high-quality park system to provide residents and visitors with equitable
access to active and passive recreation opportunities. The Public Facilities Plan, as part of the
Comprehensive Plan, indicates:
County-wide Parks and Recreation Needs
Park TypeNumber of New Parks Aggregate Acreage
Regional 3600
Community10 790
Neighborhood 9180
Special Purpose3 1 -
Urban 2 - -
Linear 3 - -
1
The Public Facilities Plannotes facility recommendations for water-based parks. All other facilities are acquired
and developed on a site-by-site basis.
2
Facilities are recommended in urban areas where there is limited acreage available for park development.
3
Facility needs are assessed on a site-by-site basis as recommended in the Public Facilities Plan.
Parks and Recreation –Project Impacts
5.9 Acres of Regional, Community and/or Neighborhood
2012 County Level of Service
parkland per 1,000 persons
9 Acres of Regional, Community and/or Neighborhood
Target Level of Service
parkland per 1,000 persons
Applicant has not fully addressed impacts on parks and
Applicant’s Proposal to Address recreationalfacilities (cash proffer not in accordance with
1
Impacts current policy).
Proffered Condition
1
The financial impact of residential development on parks facilities is addressed in the “Financial Impact on Capital
Facilities” section of the report.
Additional Information:
Information relative to nearby parks and recreation facilities can be found in Attachment 2.
915SN0632-2015JUN24-BOS-RPT
LIBRARIES
Staff Contact: Debra Winecoff (804-751-4475)winecoffd@chesterfield.gov
The public library system’s role in the county has expanded beyond its traditional function as a
resource for information and materials, and now serves as a community gathering place for
educational, cultural and informational services; community support during emergencies;
economic development; and revitalization activities.The Public Facilities Plan, as part of the
Comprehensive Plan,indicates:
County-wide LibraryNeeds
Facility ActionCounty-wide Facility Needs
Expand or Replace 5 Libraries
5 Libraries
Construction of New
Facilities
1 Community Arts Center
Libraries -Project Impacts
2011 County Level of Service 0.45 square feet of library space per person
Standard Level of Service 0.82 square feet of library space per person
Applicant’s Proposal to Applicant has not fully addressed impacts on library facilities
1
Address Impacts (cash proffer not in accordance with current policy)
Proffered Condition
1
The financial impact of residential development on library facilities is addressed in the “Financial Impact on
Capital Facilities” section of the report.
Additional Library Information:
Information relative to nearby library facilities can be found in Attachment 2.
1015SN0632-2015JUN24-BOS-RPT
SCHOOLS
Staff Contact: Dr. Cynthia O. Richardson (804-318-8740)
cynthia_o_richardson@ccpsnet.net
High performing, high quality public schools contribute to the quality of life and economic
vitality of the County. The Comprehensive Plan suggests a greater focus should be placed on
linking schools with communities by providing greater access, flexible designs and locations that
better meet the needs of the communities in which they are located. The Public Facilities Plan,
as part of the Comprehensive Plan, indicates:
County-wide School Needs
School Types Facilities to Revitalize/ReplaceNew Facilities
Elementary 163
Middle 62
High23
Technical-1
Schools -Project Impacts
Elementary1
Middle0
Average Student Yield
High0
Total1
Applicant’s Proposal to Applicant has not fully addressed impacts on school facilities
1
Address Impacts(cash proffer not in accordance with current policy)
Proffered Condition
1
The financial impact of residential development on school facilities is addressed in the “Financial Impact on
Capital Facilities” section of the report.
Additional Information:
After review of this request, based on current school assignments and student enrollment the
proposed rezoning case will have animpact on schools. It is possible that over time this case,
combined with other tentative residential developments and other zoning cases in the area will
continue to push these schools to their capacity and therefore impact the capacity of facilities
division-wide.
Information relative to schools currently serving area can be found in Attachment 2.
1115SN0632-2015JUN24-BOS-RPT
COUNTY DEPARTMENT OF TRANSPORTATION
Staff Contact: Jim Banks (804-748-1037)banksj@chesterfield.gov
The Comprehensive Plan, which includes the Thoroughfare Plan, identifiescounty-wide
transportation needs that are expected to mitigate traffic impacts of future growth. The
anticipated traffic impact of the proposal has been evaluated and recommendations are
detailed in the chart below:
RecommendationApplicant’s Proposal
Cash Proffer Policy Applicant has not fully addressed
traffic impacts (cash proffer not in
accordance with current policy)
Proffered Condition
VIRGINIA DEPARTMENT OF TRANSPORTATION
Staff Contact: Brian Lokker (804-674-2384) brian.lokker@vdot.virginia.gov
VDOT Land Use Regulations
-
Traffic Impact Analysis (24VAC30-155)
-
Access Management (24VAC30-73)
-
Subdivision Street Acceptance (24VAC30-91/92)
-
Land Use Permit (24VAC30-151)
VDOT has no comment on this request.
Summary
WATER AND WASTEWATER SYSTEMS
Staff Contact: Jamie Bland (804-751-4439)blandj@chesterfield.gov
The proposal’s impacts on the County’s utility system are detailed in the chart below:
Water and Wastewater Systems
Currently Sizeof Existing LineConnection Required by County Code?
Serviced?
WaterYes 8”Yes
WastewaterYes 8”Yes
Parcels 794-657-7210 and 794-657-8115 are not connected to public water and wastewater,
but are proffered to connect with Case 06SN0158. Parcel 794-657-8920 is currently connected
to public water and wastewater.
1215SN0632-2015JUN24-BOS-RPT
ENVIRONMENTAL
Drainage, Erosion and Water Quality
Staff Contact: Doug Pritchard (804-748-1028)pritchardd@chesterfield.gov
Environmental Engineering has no comment on this request.
1315SN0632-2015JUN24-BOS-RPT
CASE HISTORY
Applicant Submittals
3/2/15Application submitted
4/20/15Proffered conditions weresubmitted
5/19/15Proffered conditions were submitted
Planning Commission Meeting
5/19/15 Citizen Comments
Citizens spoke in support and opposition of the applicant’s request:
Proffer reductions are beneficial for infill development
Marshall and Swift Building Code Index is not an appropriate inflation
mechanism for the cash proffer escalation
Reduction of cash proffer below the Board’s maximum cash proffer
should not be approved,
Need to apply the Cash Proffer Policy equally to all applicants
Commission Discussion
The Commission noted their support for this case:
The exception to the Board’s maximum cash proffer is relatively small
scale considering the size applicant’s subdivision (3 lots)
Continues to offer the original cash proffer amount as proffered in 2006
Proffered conditions improve the original case and require that a quality
house is constructed on the lots
In addition, the Commission noted opposition for this case, including:
Property is not located in arevitalization area
Difficult to prove that a hardship exists
Cash Proffer Policy does not provide the flexibilityfor reducing cash
proffers for the applicant’s request
Recommendation – APPROVAL AND ACCEPTANCE OF THE
PROFFERED CONDITIONS IN ATTACHMENT 1
Motion: Patton; Seconded: Waller
AYES:Waller, Brown, and Patton
NAYS: Gulley and Wallin
1415SN0632-2015JUN24-BOS-RPT
ATTACHMENT 1
PROFFERED CONDITION
Note:
“CPC” –Recommended by the Planning Commission only
With the approval of this case, Proffered Condition 5 of Case 06SN0158 shall be amended as
follows:
(CPC)1.Cash Proffers: For each dwelling unit, the applicant, sub-divider, or assignee(s)
shall pay the following to the County of Chesterfield, prior to the issuance of a
building permit for infrastructure improvements within the cash proffer service
district for the property, unless state law prevents enforcement of that timing:
a.$15,600 per dwelling unit for the period beginning the July 1 preceding
the Board of Supervisors’ approval of the case through July 1 four years
later, at which point the amount will be adjusted for the cumulate change
in the Marshall and Swift Building Cost index during that time period.
b.Thereafter, the per dwelling unit cash proffer amount shall be
automatically adjusted, annually, by the annual change in the Marshall
and Swift Building Cost Index on July 1 of each year.
c.Cash proffer payments shall be spent for the purposes proffered or as
otherwise permitted by law. (B&M)
(STAFF NOTE: Except as amended herein, all previous conditions of zoning
approved in Case 06SN0158 shall remain in full forceand effect.)
(CPC)2.Foundations: The exposed portion of any foundation shall be brick or stone. (P)
(CPC)3.Exterior Facades: Acceptable siding materials include brick, stone, masonry,
stucco, synthetic stucco (E.I.F.S), and lap siding. Lap sidingmay be permitted to
be manufactured from natural wood or cement fiber board or may be premium
quality vinyl siding. Plywood and metal siding are not permitted. Additional
siding requirements:
a.Premium quality vinyl is defined as vinyl siding with a minimum wall
thickness of .040”.
b.Synthetic Stucco (E.I.F.S.) siding shall be finished in smooth, sand or level
texture. Rough textures are not permitted. (P)
1515SN0632-2015JUN24-BOS-RPT
(CPC)4.Roof Material: Roofing material shall be dimensional architectural shingles or
better with a minimum thirty (30) year warranty. (P)
(CPC)5.Porches, Stoops and Decks
a.Front Porches: All front entry stoops and front porches shall be
constructed with continuous masonry foundation wall or on 12”x12”
masonry piers. Extended front porches shall be a minimum of five (5)’
deep. Space between piers under porches shall be enclosed with framed
lattice panels. Handrails and railings shall be finished painted wood or
metal railing with vertical pickets or sawn balusters. Pickets shall be
supported on top and bottom rails that span between columns.
b.Front Porch Flooring: Porch flooring shall be permitted to be concrete,
exposed aggregate concrete, or a finished paving material such as stone,
tile or brick, finished (stained dark) wood, or properly trimmed composite
decking boards. All front steps shall be masonry to match the foundation
or finished wood with painted risers. (P)
(CPC)6.Minimum House Size. The minimum gross floor area shall be 1,600 square feet
for a one-story dwelling unit or 1,800 squarefeet for a dwelling unit greater than
one-story. (P)
1615SN0632-2015JUN24-BOS-RPT
ATTACHMENT 2
SUPPLEMENTAL PUBLIC FACILITIES STATISTICS
Schools Currently Serving Area
Curtis
Elizabeth DavisThomas Dale
Elementary
Middle SchoolHigh School
School
Capacity
Categories
Current
and
Projected
2014727 881 831243 128497 2239282479
2
Figures
2015735 -831289 - 100 2213-78
2016750 -851343 - 105 2189-78
2021797 -901339 - 104 2342-83
TrailersNumber of
0 2 -
1
Trailers
1
Trailers are not identified in the staff report for schools under 90% capacity.
2
Disclaimer: Please note that Projected Membership AND Functional Capacity are updated on an ANNUAL BASIS.
They are based on the September 30 membership and Space Utilization Study Report for a given year.School
boundary adjustments may be made to address over capacity levels.
Nearby Public Facilities
Fire Station The Dutch Gap Fire Station, Company Number 14
EMS Facility The Bensley-Bermuda Volunteer Rescue Squad
Library Chester Library
Parks & RecreationChester Linear Park, Goyne Park, Dutch Gap Conservation Area
1715SN0632-2015JUN24-BOS-RPT
ATTACHMENT 3
APPROVED CONDITIONS FOR CASE 06SN0158
1815SN0632-2015JUN24-BOS-RPT
1915SN0632-2015JUN24-BOS-RPT