15SN0634
CASE NUMBER: 15SN0634
APPLICANT: Charter (E & A) LLC
CHESTERFIELD COUNTY, VIRGINIA
STAFF’SANALYSISMagisterial District: MIDLOTHIAN
AND 200 Charter Colony Parkway
RECOMMENDATION
Board of Supervisors (BOS)
Public Hearing Date:
SEPTEMBER 16, 2015
BOS Time Remaining:
344 DAYS
Applicant’s Agent:
BRENNEN KEENE
(804-775-1005)
Applicant’s Contact:
REYNOLDS ALLEN
(301-652-3588)
Planning Department Case Manager:
RYAN RAMSEY (804-768-7592)
APPLICANT’S REQUEST
Amendment of conditional use planned development(Cases 94SN0138 & 13SN0509) to permit
exceptions to density and residential townhouse standards.
An eighty (80) unit residential townhouse development is planned.Density within Charter Colony
is currently limited to 1,800 dwelling units with the development of John Tyler Community
College. Eighty (80) additional dwelling units above the permitted 1,800 dwelling unitsin Charter
Colony are proposed.
In addition, exceptions relative to bulk standards in the Residential Townhouse (R-TH) District for
setbacks, lot size, unit variation, buffers, landscaping, open space and recreational areasare
requested.
Notes:
A.Conditions may be imposed or the property owner may proffer conditions.
B.Proffered conditions and Textual Statementare located in Attachments1and 2.
RECOMMENDATION
RECOMMEND APPROVAL
PLANNING
High-quality, village-concept townhouse community
COMMISSION
Future development on Le Gordon Drive is limited
(7/21/2015)
Substantial capital facilities improvements already constructed
as a part of Charter Colony
Providing a FIRST CHOICE community through excellence in public service
RECOMMENDATION (CONTINUED)
RECOMMEND APPROVAL
PLANNING
COMMISSION AYES: Gulley, Wallerand Wallin
(7/21/2015)NAYES:Brown
ABSENT: Patton
RECOMMEND DENIAL
STAFF
Request does not address impacts on capital facilities
215SN0634-2015SEP16-BOS-RPT
SUMMARY OF IDENTIFIED ISSUES
DepartmentIssue
PLANNING-
BUDGET AND Fails to address the development’s impact in accordance with Board’s
MANAGEMENT Cash Proffer Policy
Fails to address development’s impact on fire and EMS in accordance
FIRE
with Board’s Cash Proffer Policy
PARKS AND Fails to address development’s impact on parks and recreational
RECREATIONfacilities in accordance with Board’s Cash Proffer Policy
Fails to address development’s impact on library facilities in
LIBRARIES
accordance with Board’s Cash Proffer Policy
Fails to address development’s impact on school facilities in
SCHOOLS
accordance with Board’s Cash Proffer Policy
Fails to address development’s impact on traffic in accordance with
CDOT
Board’s Cash Proffer Policy
VDOT-
UTILITIES-
ENVIRONMENTAL
-
ENGINEERING
315SN0634-2015SEP16-BOS-RPT
415SN0634-2015SEP16-BOS-RPT
Map 2: Comprehensive Plan(Midlothian Area Community Plan)
Classification: PLANNED TRANSITION AREA
The designation suggests the property is appropriate for mixed-use development that contributes to
an overall transition to a smaller scale, pedestrian-oriented environment in Midlothian Village.Primary
uses will include office, medium-density housing (7-14 dwelling units per acre), personal services and
community facilities.
Map 3: Surrounding Land Uses & Development
Martin’s Shopping Center
IvymontShopping Center
Midlothian Turnpike
Midlothian Woods
Condominiums
Charter Colony Parkway
515SN0634-2015SEP16-BOS-RPT
PLANNING
Staff Contact: Ryan Ramsey (804-768-7592) ramseyrp@chesterfield.gov
ZONING HISTORY
Case NumberBOS Action Request
Rezoning from R-15 to R-9 of 764.3 acres, from R-TH to R-
Approved9 of 6.2 acres, and from R-15 to C-3 of 3.6 acres, all with
94SN0138
(08/24/1994) Conditional Use Planned Development to permit use and
bulk exceptions.
Amendment of Conditional Use Planned Development
(Case 94SN0138) within Tract 7 to modify the location and
Approved
13SN0509 reduce setbacks along of the East-West Collector Road
(06/26/2013)
and obtain conceptuallandscape plan approval for the
area fronting on Le Gordon Drive.
PROPOSAL
An eighty (80) unit residential townhouse development is planned.The request property is
located within a portion of Tract 7, an area defined by the Master Plan in the original Charter
Colony zoning request. Residential townhomes are a permitted use, when developed in
accordance with the Residential Townhouse (R-TH) District standardsand zoning conditions.
Several exceptions to these development standards and the overall density limitations are
requested.
CHARTER COLONY DENSITY
The following chart provides an overview of the development’s density modification:
Case NumberPermitted Overall Density Request
Tract 4 has been developed for
non-residential purposes (John
1
1,800 Dwelling Units
Tyler Community College)
If Tract 4 is developed
1,784 dwelling units have been
for non-residential uses
94SN0138
recorded or approved as of May,
1
2,100 Dwelling Units
2015
If Tract 4 is developed
16 dwelling units remain (12 of
for residential uses
these units may be non-age
restricted dwelling units)
The proposed 80 lots would be in
15SN0634
80 Dwelling Units (On the
addition to the permitted 1800
(Current
Request Property)
dwelling units permitted elsewhere
Request)
in the Charter Colony
1
Density is for the entire Charter Colony zoning request geography, as outlined in Zoning Case 94SN0138.
DEVELOPMENT STANDARDS
The request includes a number of modifications to the Residential Townhouse (R-TH) District
standards. These exceptions are necessary to promote avillage-style townhouse concept rather
615SN0634-2015SEP16-BOS-RPT
than a traditional, suburban-styled development per the current R-TH ordinance requirements.
Generally, dwellings would consist of a mix of rear and front loaded townhomes, oriented along
public roads and common areas. Alleys would facilitate access to the rear-loaded lots. Townhomes
would also front the Special Access Road (East/West Road) and a commonarea. Sidewalks and
pathways would be provided throughout the development, encouraging pedestrian-oriented
placement of townhomes that are adjacent to streets and common areas.
The following chart provides an overview of the development’s modification to Residential
Townhouse (R-TH) District standards:
Design or Bulk Request
Requirement
DensityIncreased from 8 to 14 dwelling units per acre 1 maximum density
Textual Statement4.A.
Lot Area and WidthReduction in lot size and lot width for end units.
Textual Statement4.B.
Setbacks
Reduced side, corner sideand rear yard setbacks
Reduced encroachments for certain improvements (i.e. uncovered
stairs, terraces, landings, porches, or enclosed entrances)
Establish a Special Access Road (East/West Road) setback
Textual Statement 4.C. , 4.E., 7.C., 7.D. and 7.E.
Concrete curb and gutter not required for private alleys and
Driveways and Parking
driveways
Areas
Textual Statement 4.G.
Eliminate unit variation
Group or Row Design
Textual Statement 4.H.
Active recreational facilities not required. Passive recreation
Recreational and Common
amenities to include a “Pavilion” and “Common Area”.
Area
Textual Statement 4.I and Proffered Condition 12
Street TreesMix of large maturing and small ornamental street trees, based on
the orientation of garage on unit along public roads, special access
streetand units fronting common area
Textual Statement4.J. and Proffered Condition 10
Building HeightIncreased from 3 stories or 40’, whichever is lessto 4 stories or 45’,
whichever is less
Textual Statement7.F.
1
Relief to this standard was previously given in Case 94SN0138.
ARCHITECTURE & SITE DESIGN
The applicant has offered several proffered conditions relative to the architecture, unit designand
community amenities for the proposed townhouse development. The following chart and
Attachment 5 (Exhibit B) providesan overview:
715SN0634-2015SEP16-BOS-RPT
Design RequirementRequest
Architectural and Site Generally similar to the design shown on Attachment 5 (Exhibit B). In
Design Criteria addition, the following restrictions and elements shall be
incorporated into townhouse units and community:
Specified exterior and roof materials
Enhanced treatment of townhouse end units and the rear
elevationsof units adjacent to Charter Colony Parkway
Roofline variation
Front entry porch and walkway widths
Screening of alley accessfrom rights-of-way
Specified fence materials
Minimum garage sizes (1 or 2-car garages)
Allow on-street parking
Concrete driveways
Design and phasing standards for open space area and pavilion
Proffered Conditions 7,8,9,11 and12
BUFFER, LANDSCAPINGAND STREETSCAPE IMPROVEMENTS
The applicant has offered several proffered conditions relative to the design and layout of required
buffers, landscaping and streetscape improvements.The following chart provides an overview of
the development’s requirements:
Design ElementRequest
Buffer
Buffer and supplemental plantings to be reviewed prior to
construction commencing on property(along Charter Colony
Parkway)
Easements may encroach into buffer, as shown on Exhibit A
Proffered Condition 3and Textual Statement7.A
Unit LightingEach townhouse shall have a post light
Proffered Condition 11.D.
Pedestrian Access &
Meandering path on south side of Special Access
Sidewalks
Pedestrian pathway connection between the townhouse
development and Le Gordon Drive
A pedestrian crosswalk installed across the Special Access
Sidewalks on one side of all Public Roads
Sidewalk network around the common area and linking to Private
Alleys
Proffered Condition 6 and Attachment 4 (Exhibit A)
While a number of exceptions are requested, the applicant has proffered several architectural
and design elements that will result in a village-style, high-quality, pedestrian-oriented
townhouse development that is integrated into nearby existing developments and the larger
Charter Colony community. As proffered, the exceptions to the typical R-TH standards will not
be detrimental to existingorpending development in the immediate area.
815SN0634-2015SEP16-BOS-RPT
FINANCIAL IMPACT ON CAPITAL FACILITIES
Budget and Management
Staff Contact: Natalie Spillman(717-8767) spillmann@chesterfield.gov
The need for schools, parks, libraries, fire stations and transportation facilities in this area is
identified in the County’s adopted Public Facilities Plan, Thoroughfare Plan and Adopted Capital
Improvement Program and further detailed by specific departments in the applicable sections
of this request analysis.
This proposed development will have an impact on capital facilities. Staff has calculated the
fiscal impact of every new dwelling unit on schools, roads, parks, libraries and fire stations at
$21,261 per unit. The applicant has been advised that the current maximum proffer of $18,966
per unit would defray the cost of the capital facilities necessitated by this proposed
development.
The original zoning case 94SN0138 was approved in August 1994. Proffered Condition 2 of
94SN0138 states the maximum number of dwelling units within the development would be
limited to 1,800 units, since Tract 4 was utilized for non-residential uses. Proffered Condition 3
states each residential lot developed in excess of 2,088 units would be subject to pay a cash
proffer. Since the overall development was limited to 1,800 units, a cash proffer has never been
applicable. The applicant has requested to amend the previously approved case which would
increase the density, only on Tract 7, to add 80 units; however, they have not offered a way to
address the impact of this proposed development on capital facilities. Because the applicant is
requesting to increase the density above the currently allowed 1,800 units, staff feels that it is
appropriate to accept a cash proffer to assist in mitigating the corresponding impacts on capital
facilities.
The Cash Proffer Policy allows the County to assess the impact of all dwelling units in previously
approved zoning cases that come back before the Planning Commission and Board of
Supervisors using the calculated capital facility costs in effect at the time the case is
reconsidered. It is appropriate to accept the maximum cash proffer of $18,966 for each
dwelling unit.
The Planning Commission and the Board of Supervisors, through their consideration of this
request, may determine that there are unique circumstances relative to this request that may
justify acceptance of proffers as offered for this case.
915SN0634-2015SEP16-BOS-RPT
80*
Per DwellingUnit Impact on Capital Facilities
Potential
Units
FY15 Cash Proffer
Facility Current BOS ApplicantVariance from
Calculated on Existing
Categories Maximum Proposal Maximum
Impact Zoning
Schools $9,376 $0 $8,364 $0 ($8,364)
Parks$1,327 $0 $1,184 $0 ($1,184)
Libraries$340 $0 $303 $0 ($303)
Fire
$786 $0 $701 $0 ($701)
Stations
Roads$9,432 $0 $8,414 $0 ($8,414)
Total $21,261 $0 $18,966 $0 ($18,966)
Overall Impact on Capital Facilities
Schools $750,080 $0 $669,120 $0 ($669,120)
Parks$106,160 $0 $94,720 $0 ($94,720)
Libraries$27,200 $0 $24,240 $0 ($24,240)
Fire
$62,880 $0 $56,080 $0 ($56,080)
Stations
Roads$754,560 $0 $673,120 $0 ($673,120)
Total $1,700,880 $0 $1,517,280 $0 ($1,517,280)
*Based on Proffered Condition 2 of case 15SN0634.The actual number of dwelling units and
corresponding impact may vary.
1015SN0634-2015SEP16-BOS-RPT
PUBLIC FACILITIES
FIRE SERVICE
Staff Contact: Anthony Batten (804-717-6167)battena@chesterfield.gov
The mission of Fire and Emergency Medical Services (EMS) is to protect life, property and the
environment through a comprehensive fire and life safety program that ensures an adequate
and timely response to emergencies. The Public Facilities Plan, as part of the Comprehensive
Plan, indicates:
County-wide Fire & EMS Service Information & Needs
New5
Recommendations for Fire Stations
by 2022
Replacement/Revitalization4
Fire 24%
1
2011 Incidents as a percent of total
EMS (Emergency Medical Services)76%
Fire/EMS Increasesin Call Volume
44%
from 2001 and 2011
County Population Increase from
17%
2001 to 2011
1
With the aging of population, medical emergency incidents are expected to increase faster than the rate of
population growth over time.
Fire Service - Project Impacts
Estimated Number of Calls for
14
Service Annually
Applicant has not addressed impacts on fire and EMS
Applicant’s Proposal to Address
facilities (cash proffer not in accordance with current
1
Impacts
policy).
1
The financial impact of residential development on fire facilities is addressed in the “Financial Impact on Capital
Facilities” section of the report.
Additional Information:
When the property is developed, the number of hydrants, quantity of water needed for fire
protection, and access requirements will be evaluated during the plans review process.
Information relative to nearby fire and emergency service facilities can be found in Attachment
3.
1115SN0634-2015SEP16-BOS-RPT
PARKS AND RECREATION
Staff Contact: Brian Geouge (804-318-8720) geougeb@chesterfield.gov
TheCounty supports a high-quality park system to provide residents and visitors with equitable
access to active and passive recreation opportunities. The Public Facilities Plan, as part of the
Comprehensive Plan, indicates:
County-wide Parks and Recreation Needs
Park TypeNumber of New Parks Aggregate Acreage
Regional 3600
Community10 790
Neighborhood 9180
Special Purpose3 1 -
Urban 2 - -
Linear 3 - -
1
The Public Facilities Plannotes facility recommendations for water-based parks. All other facilities are acquired
and developed on a site-by-site basis.
2
Facilities are recommended in urban areas where there is limited acreage available for park development.
3
Facility needs are assessed on a site-by-site basis as recommended in the Public Facilities Plan.
Parks and Recreation –Project Impacts
5.9 Acres of Regional, Community and/or Neighborhood
2012 County Level of Service
parkland per 1,000 persons
9 Acres of Regional, Community and/or Neighborhood
Target Level of Service
parkland per 1,000 persons
Applicant has not addressed impacts on parks and
recreational facilities (cash proffer not in accordance with
Applicant’s Proposal to Address
current policy). Applicant citing proffers set in zoning case
1
Impacts
94SN0138, quality materials, and quality of life
contributions.
1
The financial impact of residential development on parks facilities is addressed in the “Financial Impact on Capital
Facilities” section of the report.
Additional Information:
Information relative to nearby parks and recreation facilities can be found in Attachment 3.
1215SN0634-2015SEP16-BOS-RPT
LIBRARIES
Staff Contact: Debra Winecoff (804-751-4475)winecoffd@chesterfield.gov
The public library system’s role in the county has expanded beyond its traditional function as a
resource for information and materials, and now serves as a community gathering place for
educational, cultural and informational services; community support during emergencies;
economic development; and revitalization activities.The Public Facilities Plan, as part of the
Comprehensive Plan,indicates:
County-wide LibraryNeeds
Facility ActionCounty-wide Facility Needs
Expand or Replace 5 Libraries
5 Libraries
Construction of New
Facilities
1 Community Arts Center
Libraries -Project Impacts
2011 County Level of Service 0.45 square feet of library space per person
Standard Level of Service 0.82 square feet of library space per person
Applicant’s Proposal to Applicant has not addressed impacts on library facilities (cash
1
Address Impacts proffer not in accordance with current policy)
1
The financial impact of residential development on library facilities is addressed in the “Financial Impact on
Capital Facilities” section of the report.
Additional Library Information:
Information relative to nearby library facilities can be found in Attachment 3.
1315SN0634-2015SEP16-BOS-RPT
SCHOOLS
Staff Contact: Atonja Allen (804-318-8740) atonja_allen@ccpsnet.net
High performing, high quality public schools contribute to the quality of life and economic
vitality of the County. The Comprehensive Plan suggests a greater focus should be placed on
linking schools with communities by providing greater access, flexible designs and locations that
better meet the needs of the communities in which they are located. The Public Facilities Plan,
as part of the Comprehensive Plan, indicates:
County-wide School Needs
School Types Facilities to Revitalize/ReplaceNew Facilities
Elementary 163
Middle62
High23
Technical-1
Schools -Project Impacts
Elementary17
Middle9
Average Student Yield
High12
Total38
Applicant’s Proposal to Applicant has not addressed impacts on school facilities (cash
1
Address Impactsproffer not in accordance with current policy)
1
The financial impact of residential development on school facilities is addressed in the “Financial Impact on
Capital Facilities” section of the report.
Additional Information:
After review of this request, based on current school assignments and student enrollment the
proposed rezoning case will have animpact on schools. It is possible that over time this case,
combined with other tentative residential developments and other zoning cases in the area will
continue to push these schools to their capacity and therefore impact the capacity of facilities
division-wide.
Information relative to schools currently serving area can be found in Attachment 3.
1415SN0634-2015SEP16-BOS-RPT
COUNTY DEPARTMENT OF TRANSPORTATION
Staff Contact: Jim Banks (804-748-1037)banksj@chesterfield.gov
The Comprehensive Plan, which includes the Thoroughfare Plan, identifies county-wide
transportation needs that are expected to mitigate traffic impacts of future growth. The
anticipated traffic impact of the proposal has been evaluated and recommendations are
detailed in the chart below:
RecommendationApplicant’s Proposal
Applicant has not addressed traffic
Cash Proffer Policy
impacts in accordance with current policy.
VIRGINIA DEPARTMENT OF TRANSPORTATION
Staff Contact: Brian Lokker (804-674-2384) brian.lokker@vdot.virginia.gov
VDOT Land Use Regulations
-
Traffic Impact Analysis (24VAC30-155)
-
Access Management (24VAC30-73)
As proffered and proposed the conditions
for meeting SSAR street acceptance
connectivity (two external connections to a
publically maintained street) and pedestrian
accommodation criteria (sidewalks on one
side of the street) would be met.
Street acceptance is further subject to
Subdivision Street Acceptance (24VAC30-91/92)
compliance with meeting VDOT’s roadway
design standards which include verification
on the need for turn lanes proposed at
roadway access points. The Department
will evaluate during the site plan review
process.
-
Land Use Permit (24VAC30-151)
-
Summary
1515SN0634-2015SEP16-BOS-RPT
WATER AND WASTEWATER SYSTEMS
Staff Contact: Jamie Bland (804-751-4439) blandj@chesterfield.gov
The proposal’s impacts on the County’s utility system are detailed in the chart below:
Water and Wastewater Systems
Currently Sizeof Existing LineConnection Required by County Code?
Serviced?
WaterNo12” & 8”Yes
WastewaterNo8”Yes
Map 5: Existing Water & Wastewater Systems
Additional Information:
The proposed request will not impact the public water and wastewater systems.
1615SN0634-2015SEP16-BOS-RPT
ENVIRONMENTAL
Drainage, Erosion and Water Quality
Staff Contact: Doug Pritchard (804-748-1028)pritchardd@chesterfield.gov
The proposal’s impacts on drainage, erosion and water qualityare detailed in the chart below:
Stormwater
Issue Discussion/Conditions
The property is in the Michaux Creek Watershed which drains into
Geography
Powhatan County before reaching the James River
The necessary stormwater management infrastructure to accommodate
Stormwater this project has already been installed as a part of the site development
Managementimprovements for the Charter Colony/Midlothian Turnpike/Le Gordon
Drive Martin’s Grocery Store.
1715SN0634-2015SEP16-BOS-RPT
CASE HISTORY
Applicant Submittals
3/9/15Application submitted
5/8/15Revised proffers and textual statement were submitted
5/11/15& Revised proffers and textual statement were submitted
5/12/15
6/29/15A revised proffer wassubmitted, relative to permitting engineered wood siding
as a permitted building material
Community Meeting
4/22/15Issues Discussed
Midlothian Planning Commissioner, applicant, agent and staff attended
House size, sales price, number of bedrooms/bathrooms, cash proffer,
access to Charter Colony recreational facilities, number of students
generated by this development and the impact on the overcrowding
situation at Watkins Elementary School
Planning Commission Meetings
5/19/15 Citizen Comments
Citizens spoke in support and opposition of the applicant’s request:
Development will have high-quality architecture and building materials
Development may worsenthe overcrowding at J.B. Watkins Elementary
School
Need to meet with area residents and evaluate traffic impacts on Le
Gordon Drive
Offering no cash proffer is not acceptable since there is a need for public
facilities within the immediate community and on a county-wide basis
Commission Discussion
The Commission noted their desireto deferthis case to allow additional
time for the applicant to meet with the community to discuss impacts of the
development along Le Gordon Drive
Action –DEFERRED TO JULY 21, 2015
7/21/15 Citizen Comments
Several citizens spoke in opposition to this case, noting that the applicant
has not offered a full cashproffer to address impacts on capital facilities,
overcapacity of Watkins Elementary, increased traffic along LeGordon
Drive, and overdevelopment of the site.
Two citizensspoke in support of this case, noting that the applicant has
presented a quality housing product, there is a need for additional housing
in Midlothian Village and that the developer of Charter Colony has already
contributed towards offsetting its impact on capital facilities.
1815SN0634-2015SEP16-BOS-RPT
Commission Discussion
The Commission noted their support for this case:
Applicant has provided a village-concept plan for a high-quality
townhouse community
Further development opportunities on Le Gordon Drive are limited
Impacts to local schools will need be addressed by the School Board,
relative to overcrowding at Watkins Elementary School
A substantial amount of capital facility improvements have already been
constructed as a part of Charter Colony development
Dr. Brown noted his opposition to this case given development will generate
students and usage of capital facilities; thereforea cash proffer to offset
these impacts is appropriate.
Recommendation – APPROVAL AND ACCEPTANCE OF THE
PROFFERED CONDITIONS IN ATTACHMENT 1
Motion:WallerSecond: Wallin
AYES: Gulley, Wallerand Wallin
NAYES:Brown
ABSENT: Patton
Board of Supervisors Meeting
8/26/15 BoardDiscussion
The Boardnoted their desire to defer this case to the next regularly
scheduled Board of Supervisors meeting.
Action -DEFERRED TO SEPTEMBER 16, 2015
The Board of Supervisors on Wednesday, September 16, 2015, beginning at 6:30 p.m., will
consider this request.
1915SN0634-2015SEP16-BOS-RPT
ATTACHMENT 1
PROFFERED CONDITIONS
Note:
“CPC” –Recommended by the Planning Commission only
The Owners and the Developer (the “Owners”) in this zoning case, pursuant to §15.2-2298 of
the Code of Virginia (1950 as amended) and the Zoning Ordinance of Chesterfield County, for
themselves and their successors or assigns, proffer that the development of the Property
known as part of Chesterfield County Tax Identification Number 726-707-3592 (the “Property”)
under consideration will be developed according to the following conditions if, and only if, the
rezoning request for amendment to the Conditional Use Planned Development (“CUPD”) is
granted. In the event the request is denied or approved with conditions not agreed to by the
Owners, the proffers shall immediately be null and void and of no further force or effect.
The application contains two (2) exhibits described as follows:
Exhibit A –A plan titled “Charter Colony Townhouses, Preliminary Site Plan,” dated
January 9, 2015, last revised February 24, 2015, and prepared by Youngblood, Tyler &
Associates P.C.
Exhibit B –Elevations titled “Conceptual Elevations A, B, C, C-1, and D” prepared by
HHHunt.
The Applicant hereby amends Proffered Condition 1 of Case 13SN0509 to read as follows:
(CPC)1.Master Plan. The Textual Statement dated February 27, 2015, last revised
May11, 2015, shall be considered the Master Plan. (P)
(Note: Except as amended herein, all previous conditions of zoning approved in
Case 13SN0509 shall remain in full force and effect.)
The Applicant hereby amends Proffered Condition 2 of Case 94SN0138 to read as follows:
(CPC)2.Dwelling Units. A maximum of eighty (80) dwelling units shall be permitted on
the Property. The dwelling units are independent of, in addition to, and shall not
otherwise affect or limit in any manner the original number of dwelling units
permitted by Proffered Condition 2 of case 94SN0138. (P)
(Note: Except as amended herein, all previous conditions of zoning approved in
Case 94SN0138 shall remain in full force and effect.)
2015SN0634-2015SEP16-BOS-RPT
(CPC)3.Buffers.
A.Charter Colony Parkway.
i.A fifty (50) foot buffer (“50-Foot Buffer”) measured from the
right-of-way shall be provided along Charter Colony Parkway as
shown on Exhibit A.
ii.Natural vegetation within the 50-Foot Buffer shall be maintained
to the maximum extent feasible. Prior to any construction on the
Property, an on-site inspection by the Planning Department shall
identify the trees within the 50-Foot Buffer that should be saved.
Those trees shall be tagged and protected.
iii.If insufficient plantings exist within the 50-Foot Buffer, as
determined by the Planning Department, additional plantings
shall be added. The exact locations, quantities,species, and sizes
of any supplemental landscaping shall be determined at the time
of subdivision review.
B.Structures.
i.A decorative wall and/or signage may be provided within the
50-Foot Buffer to identify the townhouse development.
ii.Rear yard fencing for lots may be installed within the 50-Foot
Buffer, provided that the required landscaping in the buffer is
maintained. (P)
(CPC)4.Setbacks on Special Access. A ten (10) foot setback shall be required for
buildings located along the East-West Special Access Road (“Special Access”)
except as to accommodate improvements noted in Proffered Conditions5.A.and
10.A. \[For clarification, no buffers are required along the Special Access.\] (P)
(CPC)5.Pedestrian Access.
A.A sidewalk or meandering path located within the front yards of the
townhouses shall be provided along the south side of the Special Access
as generally shown on Exhibit A.
B.A pedestrian connection to the path located along LeGordon Drive shall
be provided from the turnaround shown on Exhibit A and as approved by
the Planning Department at the time of subdivision review.
C.At least one pedestrian crosswalk located in-line with the sidewalk
fronting the shopping center buildings that face Charter Colony Parkway
shall be provided across the Special Access, if approved by VDOT.
D.Sidewalks shall be provided on one side of the Public Roads of the
townhouse development as shown on Exhibit A. Public Roads are those
roads that are internal to the Property and designed to be accepted for
state maintenance.
E.Additional sidewalks shall be provided across the Common Area and
linking to the Private Alleys as generally shown on Exhibit A.
2115SN0634-2015SEP16-BOS-RPT
F.All private sidewalks leading to the front of the dwelling units shall be a
minimum of four (4) feet in width. (P)
(CPC)6.Garages and Parking.
A.Rear-loaded, alley-accessed townhouses shall have two-car garages.
B.Front-loaded townhouses shall have one-car garages.
C.On-street parking shall be permitted on Public Roads as approved by
VDOT.(P)
(CPC)7.Alley Access and Screening. Where an alley is visible from Public Roads, a
screening wall, fence, or landscaping shall be used to minimize the view of
parking and service areas. (P)
(CPC)8.Townhouse Design.
A.The architecture design shall be generally similar to those shown on
Exhibit B.
B.The townhouse end units that face outside the Property and in the
locations noted on Exhibit A as Lots 1, 31, 32, 45, 46, 61, and 62 shall be
constructed with additional façade design and detailing such as shown on
Conceptual Elevation D.
C.All endunits that are internal to the Property shall wrap any brick on the
front façade a minimum of eighteen (18) inches along the side of the unit.
D.Exterior materials shall be brick or fiber cement siding (such as
HardiePlank, HardieShingle, and HardieTrim)orengineered wood siding
(such as LP SmartSide). Vinyl siding shall not permitted as an exterior
material.
E.Other materials may be used for trim, architectural decorations, or
design elements provided they blend with the traditional and cottage
style architecture, as generally depicted in Exhibit B.
F.Roof materials shall be standing seam metal or a thirty (30) year
architectural dimensional shingles with algae protection.
G.Roofs or roof lines shall be varied in color, height, or by a visual/material
break between the roofs.
H.All front entries shall be covered with a solid porch roof. At least one unit
in each group of rear-loaded townhouses shall provide a front porch
design extending the full width of the unit to provide variety and vertical
breaks to the units.
I.Any rear elevation adjacent to Charter Colony Parkway (Lots 11-31 on
Exhibit A) shall be constructed with similar architectural details as those
on the front elevation of the townhouse. All single windows shall have a
shutter treatment. In addition, a minimum of two (2) dwelling units in a
row or group shall incorporate a brick façade treatment from the
foundation to the top of the second floor. The units with a brick façade
shall not be required to incorporate decorative siding treatment above
thebrick.
2215SN0634-2015SEP16-BOS-RPT
J.The minimum square footage of the townhouses shall be 1600 square
feet. (P)
(CPC)9.Fences.
A.Any rear yard fences constructed shall be vinyl, fiber cement lumber,
metal, and/or comparable material.
B.The height of rear yard fences shall not exceed six (6) feet. (P)
(CPC)10.Streetscape.
A.Large maturing trees, planted approximately 40’ on center, shall be
provided along the Public Roads of rear-loaded lots, along the Special
Access Street, and Common Area, except where there is a conflict with
utilities, sightlines, and drivewayareas.
B.Small ornamental trees shall be provided between groups of front-loaded
lots, except where there is a conflict with utilities.
C.Front yard post lights shall be provided for each townhouse.(P)
(CPC)11.Driveways. Driveways shall be concrete. Gravel or asphalt driveways shall not
be permitted.(P)
(CPC)12.Common Areas.
A.An open lawn passive recreation area shall be provided as shown as
Common Area on Exhibit A.
B.A covered community gathering space such as pavilion, gazebo, or similar
structure (“Pavilion”) shall be provided on the Property.
i.The Pavilion shall be a minimum of 192 square feet in size and the
design of the Pavilion shall be compatible with the architecture of
the community.
ii.The exact location of the Pavilion shall be determined at the time
of preliminary subdivision plat approval.
iii.Once the location is identified, the Pavilion shall be constructed as
part of that row or group of townhouses immediately adjacent to
the Pavilion location.
iv.Notwithstanding the provisions above, the Pavilion shall be under
th
construction prior to the issuance of the 40building permit.(P)
2315SN0634-2015SEP16-BOS-RPT
ATTACHMENT 2
TEXTUAL STATEMENT
Case 15SN0634
March 2, 2015
Revised May 8, 2015
Revised May 11, 2015
Tract 7 – C-3 with Conditional Use Planned Development to permit residential multi-family and
townhouse uses; recreational uses accessory to residential uses in the development; private
schools plus exceptions to C-3 bulk requirements.
1.Uses permitted shall be those permitted in the Community Business (C-3) District;
Residential Multi-Family (R-MF) District and Residential Townhouse (R-TH) District;
recreational uses accessory to residential uses in the development; plus private schools.
2.Development of any non-residential use shall conform to the requirements of the
Midlothian Village Fringe District of the Zoning Ordinance, except that the setbacks from
the East-West Special Access Road shall be as set forth in Proffered Condition 4 of Case
13SN0509.
3.Residential multi-family and townhouseuses shall conform to the Zoning Ordinance
requirements for Residential Multi-family (R-MF) for any multi-family uses and
Residential Townhouse (R-TH) for any townhouse usesexcept there shall be no
minimum acreage requirement for such uses and density shall not exceed fourteen (14)
units per acre.
4.Residential Townhouse uses shall conform to the regulations set forth in the Residential
Townhouse (R-TH) district except as set forth in below and as specified in the Proffered
Conditions.
A.Density. There shall be no minimum acreage requirement and density shall not
exceed fourteen (14) units per acre.
B.Lot Area & Width.Each lot shall have an area not less than 1,520 square feet
and a lot width of not less than 19 feet; except that end lots shall have a
minimum area of 2,320 square feet and lot width of not less than 29 feet.
C.Setbacks from Special Access Road. The minimum building setback from the
East-West Special Access Road shall be ten (10) feet.
D.Side Yard.The side yard setback for all end lots shall be ten (10) feet.
E.Corner Side Yard.The corner side yard shall be twenty (20) feet.
F.Rear yard.The rear yard shall be twenty (20) feet.
G.Driveways and Parking Areas. All public roads shall have concrete curb and
gutter. Alleys and driveways shall not be required to have concrete curb and
gutter.
2415SN0634-2015SEP16-BOS-RPT
H.Group or Row Design. There shall be no required variation in the front yard
setbacks for the townhouse units.
I.Common Area.No active recreational facilities or areas shall be required;
however, passive recreation is provided as set forth in Proffered Condition 12.
J.Street Trees.Street tree installation shall be provided as set forth in Proffered
Condition 10.
5.At time of site plan review for any recreational uses, conditions may be imposed to
insure land use compatibility. These conditions may address, but not necessarily be
limited to, buffering screening, lighting and hours of operation.
6.A natural or open space area of approximately four (4) acres shall be maintained
between Charter Colony Parkway and LeGordon Drive, generally adjacent to Parcels 2,
4, 5, 7, 10, 19, and 20 on Tax Map 15-15 (1) as illustrated on Exhibit 'B.' This open space
may be utilized for access, stormwater retention, wetlands mitigation, water quality
facilities, utility extensions andsimilar uses as may be approved by the Planning
Commission, but shall not be used for building or parking. Specific measures shall be
required to mitigate the impact of these improvements to LeGordon Drive and adjacent
residential areas, if deemed necessary by the Planning Commission. These measures
may include but not necessarily be limited to additional landscaping, architectural
treatment, fences, walls, hedges, berms, etc.
7.The development of the townhouses shall conform to the Zoning Ordinance exceptas
follows:
A.The buffer along Charter Colony Parkway may be reduced to thirty (30) feet
where necessary to accommodate existing easements, utilities running generally
parallel to the buffer, fencing, and signage (including a decorative wall).
B.If side entry townhouses are provided, uncovered stairs, terraces, landings,
porches, or enclosed entrances may project into the side yard or the corner side
yard up to eight (8) feet.
C.Bay windows and eves may project into any yard setback up to three and a half
feet (3.5) feet.
D.Covered porches enclosed on three sides may project into a front yard setback
up to four (4) feet.
E.The maximum height of all buildings shall be four (4) stories or forty-five (45)
feet, whichever is less.
2515SN0634-2015SEP16-BOS-RPT
ATTACHMENT 3
SUPPLEMENTAL PUBLIC FACILITIES STATISTICS
Schools Currently Serving Area
Watkins
Midlothian Midlothian
Elementary
Middle SchoolHigh School
School
Capacity
Categories
Current
and
Projected
20141011818 1241225 150681 1472156994
2
Figures
20151033-1261206 - 80 1548-99
20161051-1281213 - 81 1591-101
20211072-1311211 - 80 1802-115
TrailersNumber of
3 -0
1
Trailers
1
Trailers are not identified in the staff report for schools under 90% capacity.
2
Disclaimer: Please note that Projected Membership AND Functional Capacity are updated on an ANNUAL BASIS.
They are based on the September 30 membership and Space Utilization Study Report for a given year.School
boundary adjustments may be made to address over capacity levels.
Nearby Public Facilities
Fire Station The Midlothian Fire Station, Company Number 5
EMS Facility The Forest View Volunteer Rescue Squad
Library Midlothian Library
Parks & RecreationWatkins Annex Park, Midlothian Middle Athletic Complex, Mid-
Lothian Mines Park
2615SN0634-2015SEP16-BOS-RPT
ATTACHMENT 4
EXHIBIT A (CONCEPTUAL LAYOUT)
2715SN0634-2015SEP16-BOS-RPT
ATTACHMENT 5
EXHIBIT B (CONCEPTUAL ELEVATIONS)
2815SN0634-2015SEP16-BOS-RPT
2915SN0634-2015SEP16-BOS-RPT
3015SN0634-2015SEP16-BOS-RPT
3115SN0634-2015SEP16-BOS-RPT
ATTACHMENT 6
APPROVED PROFFERED CONDITION 2(94SN0138)
3215SN0634-2015SEP16-BOS-RPT
3315SN0634-2015SEP16-BOS-RPT
ATTACHMENT 7
APPROVED PROFFERED CONDITIONS (13SN0509)
3415SN0634-2015SEP16-BOS-RPT
3515SN0634-2015SEP16-BOS-RPT
3615SN0634-2015SEP16-BOS-RPT
3715SN0634-2015SEP16-BOS-RPT
ATTACHMENT 8
APPROVED TEXTUAL STATEMENT (13SN0509)
3815SN0634-2015SEP16-BOS-RPT
3915SN0634-2015SEP16-BOS-RPT