Loading...
03-27-1972 PacketPresent Mr o Irvil Mr. Leo t, [~ir. J.Rui Mr. A. J, On motior this Boar connecti~ On motio~ this Boar extra hel 1971-'72 are hereb Fund to t Ayes: Mr. There was in which~ program ol Upon cons Mro O'Neil the same Ao T f~ f~ (aZ (b Bo I VIRGINIA: At an adjourned meeting of the Board of Supervisors of Chesterfield County: held at the Courthouse on March 27: 1972 at 5:00 P.M. G. Homer, Chairman yers~ Vice-Chairman fin Apperson Krepe!a ~lin O'Neill Also Present: Mr. Oliver D. ~%udy~ Comm. Attorney Mr. ho W. Burnett: Exec. Sec'y. Mro John Eo Longmire:Asst. ExecoSec,y. Mro Robt. Ao Painter: Co. Engineer Mr. ?lichae! Ritz: Co. Planner of Mro O'~[aill; seconded by Mro Myers~ it is resolved that authorizes the County Engineer to give two (2) sewer · to Robert G. Chandler on Lots 5 and ~ on Robertson Avenue. of Mr. Apperson~seconded by Mro I,~yers~ it is resolved that approves the additional appropriation of $2000.00 for and the appropriation of $200.00 for postage in the udget of the Commissioner of the l~evenue and said amounts f appropriated from the unappropriated surplus of the General ~e items specified. Hornet: Mro Myers~ Mr. Apperson~ Mr. Krepela and Mr. O'Neill. presented a report of the Airport Advisory Board meeting :ertain recommendations were made concerning the building the County Airport° deration whereof: and on motion of ?-lro Krepela~ seconded by .19 it is resolved that the following recommendations be and ~re hereby approved: ,e advisory group recommends tha't the preliminary plans ,r 'the terminal building be approved subject to the ,llowing: The second floor be designed only after FAA has agreed to lease the space at a feasible rate° The base~ent design should be a ;~roughed in,~ situation and this portion of the building should be bid as an altern~teo The architect design the facility so that the cost estlm~-.'ce with the exception of 'the second floor be under $200~000o t is recommended that the preliminary plans be approved ]bject to some alterations to the '~lean to~, portions of ~is f ' ' -acmlmty by the Advisory Board. It is anticipated that two: of o~ The ~ exce~ Ayes Nay: one ~lean to~ be eliminated and the other be made into tories with the second floor roughed in for future rental lice space and expansion of airport services. rchitect's service relative to this facility should not ~d $500.00, Mr. Homer, Mro Myers, Mro Krepela and Mr. O'Neill° Mr o kpper son The ~oard mee~s with Subdivision C£dinanceo On mdtion of ~iro r~iyers~ that Ayes Michael Ritz to revi~.~ %he proposed seconded by ~iro Apperson~ it is resolved this ~-'~ '~ uc!rc~ adjourns at 11:30 p.m. ~'i. ro l~oz'ncr~ i~r. P~yers~ Pit. Apperson~ ~lro Krepela and Mr. O'Neill. -2- AIRPORT Meeting 1. PPer The appo priority possible many are No reco~ result build ing UDVISORY BOARD REPORT: ~umber 1 - March 13, 1972, 3 P.M. to 6 P.M., Ail present. %tiqns-The various methods of operating an airport were discussed. :ntees generally favor a salaried airport manager whose first will be to maintain safe ~andards of operations. Other duties of this position were discussed and found to include Ls of operation. ~endation concerning the airport operation was made as a this meeting. 'n~q.q~-The advisory group reviewed plans for the terminal and Maintenance Hangar. Terminal Building-Each member had reviewed these plans prior to the meeting. Several aspects of its usage were discussed. 1P~=ea%~~-The advisory group recommends that the pre- im'ihar~ ~l'a~S for the terminal building be approved subject to the following: (a) (b) The second floor be designed only after FAA has agreed to lease the space at a feasible rate. The basement design should be a "roughed in" situation and this portion of the building should be bid as an alternate. (c) The architect design the facility so that the cost estimate with the exception of the second floor be under $200,000. ~aintenance Hangar-Bill Shelton and John Longmire discussed :heir travels to Byrd Airport and Hanover Airport to discuss :hese plans with base operators. The advisory group discussed :he potential for renting office space within this facility Lf it is made available. ~e~g9~ati~n-It is recommended that the preliminary plans )e approved subject to-some alterations to the "lean to" )ortions of this facility by the advisory board. It is ~nticipated that one "lean to" be eliminated and the other ~e made into two stor4es with the second floor roughed in or future rental of office space and expansion of airport ervices. he architect,s service relative to this facility should ot exceed $500.00. H. B. WALKER COMMISSIONER COUNTY OF CHESTERFIELD OFFICE: OF THE COMMISSIONER OF' THE REVENUe' CHESTERFIELD, VIRGINIA 23832 March 22, 1972 Mr. M. W. Burnett Executive Secretary Board of Supervisors Chesterfield County Chesterfield~ Virginia Dear Mr. Burnett: I would appreciate it very much if the Board of Supervisors would make an additional appropriation of $2~000. for Extra Help, and an additional $200. for Postage for the 1971-72 Budget. The above request for additional appropriation for Extra Help will be needed due to the anticipated change in the 1973 Personal Property billing date. Very truly yours, H. B. Walker Commissioner of the Revenue CZ,