Loading...
16SN0679 CASE NUMBER: 16SN0679 APPLICANT: Laura Moss Wallace and William Brian Simonson CHESTERFIELD COUNTY, VIRGINIA STAFF’S ANALYSIS Magisterial District: CLOVER HILL 200 & 242 Hazelmere Drive AND RECOMMENDATION Board of Supervisors (BOS) Public Hearing Date: APRIL 27, 2016 BOS Time Remaining: 365 DAYS Applicant’s Contact: LAURA MOSS WALLACE (804-517-5170) Applicant’s Contact: WILLIAM BRIAN SIMONSON (804-247-0743) Planning Department Case Manager: RYAN RAMSEY (804-768-7592) APPLICANTS’ REQUEST Rezoning from Agricultural (A) to Residential (R-25). A single-family residential subdivision is planned. Density would be limited to three (3) lots (Proffer Condition 1), yielding two (2) new dwellings in addition to the dwelling currently owned and occupied by the applicants. Notes: A.The only condition that may be imposed is a buffer condition. The property owner may proffer conditions. B.Proffered conditions and conceptual subdivision plan are located in Attachments 1 and 2. RECOMMENDATIONS PLANNING RECOMMEND APPROVAL COMMISSION (3/15/2016) RECOMMEND APPROVAL STAFF Complies with Comprehensive Plan Addresses development impacts Providing a FIRST CHOICE community through excellence in public service SUMMARY OF IDENTIFIED ISSUES Department Issue PLANNING - BUDGET AND - MANAGEMENT FIRE - PARKS AND - RECREATION LIBRARIES - SCHOOLS - CDOT - VDOT - UTILITIES - ENVIRONMENTAL - ENGINEERING REVITALIZATION - 216SN0679-2016APR27-BOS-RPT 316SN0679-2016APR27-BOS-RPT Map 2: Comprehensive Plan (Northern Courthouse Road Community Plan) Classification: RESIDENTIAL The designation suggests the property is appropriate for 1.5 dwellings per acreor less. Map 3: Surrounding Land Uses & Development Stonehenge Hazelmere Drive Ashley Woods Subdivision Bondurant Drive 416SN0679-2016APR27-BOS-RPT PLANNING Staff Contact: Ryan Ramsey (804-768-7592) ramseyrp@chesterfield.gov PROPOSAL A single-family residential subdivision is proposed. The two (2) request properties are currently occupied by a single-family home, in which the applicants reside. Two (2) adjoiningparcels, not a part of this request, are also owned by the applicants and are zoned Residential (R-15 and R-25). The applicants’ desire to create two (2) additional lots from these four (4) parcels. Each lotwould achieve road frontage and access from Hazelmere Drive. A conceptual subdivision plan is shown in Attachment 1 (Exhibit A). The request properties were not included in the original zoning or development plans of the Stonehenge and Ashley Woods subdivisions. As a residential infill project, the applicants have proffered conditions that will ensure compatibility of the development with the adjoining subdivision lots and homes. The following provides an overview of the development’s design standards proffered by the applicants: General Overview Requirements Details Maximum of three (3) dwelling units Includes the existing dwelling, owned and occupied Density by the applicants Proffered Condition 1 30,000 square feet Minimum Lot Size Proffered Condition 2 2,400 square feet of gross floor area Minimum House Size Proffered Condition 3 Asphalt or concretedriveways Driveways Proffered Condition 4.a. One (1) flowering tree in front yard Yard Landscaping Foundation planting bed along front facade Proffered Condition 4.b. Permitted materials established for foundations, roofs, facades and front porches; vinyl must be 0.44 inch Foundation & Building Materials thickness Proffered Conditions 4.c. Prohibits front loaded garages Garages Proffered Condition 4.c.v. 516SN0679-2016APR27-BOS-RPT FINANCIAL IMPACT ON CAPITAL FACILITIES Budget and Management Staff Contact: Natalie Spillman (804-717-8767) spillmann@chesterfield.gov The need for schools, parks, libraries, fire stations and transportation facilities in this area is identified in the County’s adopted Public Facilities Plan, Thoroughfare Plan and Adopted Capital Improvement Program and further detailed by specific departments in the applicable sections of this request analysis. This proposed development will have an impact on capital facilities. Staff has calculated the fiscal impact of every new dwelling unit on schools, roads, parks, libraries and fire stations at $23,418 per unit. The applicant is requesting to rezone the property from agricultural (A) to residential (R-25) to permit the subdivision of the property into three lots. There is an existing home which will remain on one of the lots. To address the impact of this development on capital facilities, the applicant has proffered the current maximum of $18,966 per each dwelling unit, which would apply to the two additional lots. The proffer also includes language that would freeze the $18,966 contribution for a period of four years after which it would be escalated by the cumulative change in the Marshall and Swift Building Cost Index. Note that circumstances relevant to this case, as presented by the applicant, have been reviewed, and it has been determined that it is appropriate to accept the maximum cash proffer of $18,966 for each dwelling unit. Per Dwelling Unit Impact 2 on Capital Facilities Potential Units FacilityApplicant's Proposal FY16 Calculated Impact Categories (Current BOS Maximum) Schools $9,648 $7,814 Parks $1,347 $1,091 Libraries $318 $258 Fire Stations $861 $697 Roads $11,244 $9,106 Total $23,418 $18,966 Overall Impact on Capital Facilities Schools $19,296 $15,628 Parks $2,694 $2,182 Libraries $636 $516 Fire Stations $1,722 $1,394 Roads $22,488 $18,212 Total $46,836 $37,932 616SN0679-2016APR27-BOS-RPT PUBLIC FACILITIES FIRE SERVICE Staff Contact: Anthony Batten (804-717-6167) BattenA@chesterfield.gov The mission of Fire and Emergency Medical Services (EMS) is to protect life, property and the environment through a comprehensive fire and life safety program that ensures an adequate and timely response to emergencies. The Public Facilities Plan, as part of the Comprehensive Plan, indicates: County-wide Fire & EMS Service Information & Needs New 5 Recommendations for Fire Stations by 2022 Replacement/Revitalization 4 Fire 24% 1 2011 Incidents as a percent of total EMS (Emergency Medical Services) 76% Fire/EMS Increases in Call Volume 44% from 2001 and 2011 County Population Increase from 17% 2001 to 2011 1 With the aging of population, medical emergency incidents are expected to increase faster than the rate of population growth over time. Fire Service - Project Impacts Estimated Number of Calls for 1 Service Annually Applicant’s Proposal to Address Offered in Accordance with Policy 1 Impacts Proffered Condition 5 1 The financial impact of residential development on fire facilities is addressed in the “Financial Impact on Capital Facilities” section of the report. Additional Information: When the property is developed, the number of hydrants, quantity of water needed for fire protection, and access requirements will be evaluated during the plans review process. 716SN0679-2016APR27-BOS-RPT PARKS AND RECREATION Staff Contact: Brian Geouge (804-318-8720) geougeb@chesterfield.gov The County supports a high-quality park system to provide residents and visitors with equitable access to active and passive recreation opportunities. The Public Facilities Plan, as part of the Comprehensive Plan, indicates: County-wide Parks and Recreation Needs Park TypeNumber of New Parks Aggregate Acreage Regional 3600 Community10 790 Neighborhood 9180 Special Purpose 3 1 - Urban 2 - - Linear 3 - - 1 The Public Facilities Plan notes facility recommendations for water-based parks. All other facilities are acquired and developed on a site-by-site basis. 2 Facilities are recommended in urban areas where there is limited acreage available for park development. 3 Facility needs are assessed on a site-by-site basis as recommended in the Public Facilities Plan. Parks and Recreation – Project Impacts 5.9 Acres of Regional, Community and/or Neighborhood 2012 County Level of Service parkland per 1,000 persons 9 Acres of Regional, Community and/or Neighborhood Target Level of Service parkland per 1,000 persons Applicant’s Proposal to Address Offered in Accordance with Policy 1 Impacts Proffered Condition 5 1 The financial impact of residential development on parks facilities is addressed in the “Financial Impact on Capital Facilities” section of the report. 816SN0679-2016APR27-BOS-RPT LIBRARIES Staff Contact: Jennifer Stevens(804-751-4998) stevensj@chesterfield.gov The public library system’s role in the county has expanded beyond its traditional function as a resource for information and materials, and now serves as a community gathering place for educational, cultural and informational services; community support during emergencies; economic development; and revitalization activities. The Public Facilities Plan, as part of the Comprehensive Plan,indicates: County-wide Library Needs Facility ActionCounty-wide Facility Needs Expand or Replace 5 Libraries Construction of New 5 Libraries Facilities 1 Community Arts Center Libraries -Project Impacts Applicant’s Proposal to Offered in Accordance with Policy 1 Address Impacts Proffered Condition 5 1 The financial impact of residential development on library facilities is addressed in the “Financial Impact on Capital Facilities” section of the report. 916SN0679-2016APR27-BOS-RPT SCHOOLS Staff Contact: Atonja Allen (804-318-8740) atonja_allen@ccpsnet.net High performing, high quality public schools contribute to the quality of life and economic vitality of the County. The Comprehensive Plan suggests a greater focus should be placed on linking schools with communities by providing greater access, flexible designs and locations that better meet the needs of the communities in which they are located. The Public Facilities Plan, as part of the Comprehensive Plan, indicates: County-wide School Needs School Types Facilities to Revitalize/Replace New Facilities Elementary 16 3 Middle 62 High 23 Technical - 1 Schools -Project Impacts Elementary 1 Middle 0 Average Student Yield High 0 Total 1 Applicant’s Proposal to Offered in Accordance with Policy 1 Address Impacts Proffered Condition 5 1 The financial impact of residential development on school facilities is addressed in the “Financial Impact on Capital Facilities” section of the report. Additional Information: After review of this request, based on current school assignments and student enrollment the proposed rezoning case will have animpact on schools. It is possible that over time this case, combined with other tentative residential developments and other zoning cases in the area will continue to push schools to their capacity and therefore impact the capacity of facilities division-wide. The approved School Board Capital Improvement Program (CIP) plan for FY2016-FY2022 includes the construction of a new elementary school in the Midlothian area and revitalization or replacement of ten (10) existing schools. These ten (10) facilities are Providence Middle School, Monacan High School, Manchester Middle School, Beulah Elementary School, Enon Elementary School, Matoaca Elementary School, Harrowgate Elementary School, Reams Elementary School, Crestwood Elementary School, and Ettrick Elementary School. Additional information on the CIP can be found in the financial section of the CCPS Adopted Budget for FY2016. 1016SN0679-2016APR27-BOS-RPT COUNTY DEPARTMENT OF TRANSPORTATION Staff Contact: Jim Banks (804) 748-1037 banksj@chesterfield.gov The Comprehensive Plan,which includes the Thoroughfare Plan, identifies county-wide transportation needs that are expected to mitigate traffic impacts of future growth. The anticipated traffic impact of the proposal has been evaluated and recommendations are detailed in the chart below: Recommendation Applicant’s Proposal Cash Proffer PolicyReference “Budget and Management” discussion on Page 6 Proffered Condition 5 VIRGINIA DEPARTMENT OF TRANSPORTATION Staff Contact: Brian Lokker (804-674-2384) brian.lokker@vdot.virginia.gov VDOT Land Use Regulations Traffic Impact Analysis (24VAC30-155) - Access Management (24VAC30-73) - Subdivision Street Acceptance (24VAC30-91/92) - Land Use Permit (24VAC30-151) - Summary VDOT has no comment on this request. WATER AND WASTEWATER SYSTEMS Staff Contact: Jamie Bland (804-751-4439) blandj@chesterfield.gov Theproposal’s impacts on the County’s utility system are detailed in the chart below: Water and Wastewater Systems Currently Size of Existing LineConnection Required by County Code? Serviced? Water Yes 6”Yes Wastewater Yes 8”Yes The proposed request will not impact the public water and wastewater systems. 1116SN0679-2016APR27-BOS-RPT ENVIRONMENTAL Drainage, Erosion and Water Quality Staff Contact: Rebeccah Ward (804-748-1028) WardR@chesterfield.gov Stormwater Issue Discussion/Conditions Property is located within the Falling Creek Watershed. Geography Drains though the Ashley Woods subdivision to Falling Creek. Greater than 2,500 square feet of total land disturbance with the Erosion and installation of a new driveway on the lot with the existing house requires Sediment Control a land disturbance permit. REVITALIZATION Staff Contact: Carl Schlaudt(804-318-8674) schlaudtc@chesterfield.gov The subject site is not located in a revitalization area. The Revitalization Office has no comment on this proposal. 1216SN0679-2016APR27-BOS-RPT CASE HISTORY Applicant Submittals 1/4/16 Application submitted 2/24/16 Proffered conditions weresubmitted Community Meeting 2/9/16 Issues Discussed: Density of development limited to 3 dwellings, which would include the applicant’s existing home (3 lots) Minimum house and lot sizes Connection of public water and sewer required Access to proposed lots and conceptual lot layout plan Cash proffer and development standards for new homes Planning Commission Meeting 3/15/16Citizen Comments No citizens spoke to this case. Commission Discussion Community meeting held with citizens in support of case Complies with Plan Recommendation – APPROVAL SUBJECT TO CONDITIONS IN ATTACHMENT 1 Motion: Freye Second: Wallin AYES: Wallin, Sloan, Freye, Jackson and Jones The Board of Supervisors on Wednesday, April, 27, 2016, beginning at 6:30 p.m., will consider this request. 1316SN0679-2016APR27-BOS-RPT ATTACHMENT 1 PROFFERED CONDITIONS Note: “STAFF/CPC” –Recommended by both staff and Planning Commission (STAFF/CPC)1. DensityThe density of this development shall not exceed three (3) lots. . (P) (STAFF/CPC)2. Lot Size. The minimum lot size shall be 30,000 square feet. (P) (STAFF/CPC)3. Minimum House Size. The minimum gross floor area for each dwelling unit shall be 2,400 square feet. (P) (STAFF/CPC)4. Architectural/Design Elements. The following requirements shall apply to any new dwelling constructed on the property: a.Driveways.All portions of driveways and parking areas shall be asphalt or concrete . b.Landscaping and Yards. i.Supplemental Trees. Prior to the issuance of a Certificate of Occupancy for each dwelling unit, a minimum of one (1) flowering tree shall be planted in each front yard. At the time of planting, these supplemental trees shall have a minimum caliper of 2” measured at breast height (4’ 10” above ground). ii.Front Foundation Planting Beds. Foundation planting is required along the entire front façade of all units, and shall extend along all sides facing a street. Foundation Planting Beds shall be a minimum of 4’ wide from the unit foundation. Planting beds shall be defined with a trenched edge or suitable landscape edging material. Planting beds shall include medium shrubs and may also include spreading groundcovers. c.Architecture and Materials. i.Foundations:The exposed portion of any foundation shall be brick or stone. Synthetic or natural stucco foundations may be permitted for façades constructed entirely of stucco. Rear walkout basement walls shall be permitted to be sided or cast concrete painted to match house. ii.Exterior Facades:Acceptable siding materials include brick, stone, masonry, stucco, synthetic stucco (E.I.F.S), and horizontal lap siding. Horizontal lap siding may be permitted to be manufactured from natural wood or cement fiber board or may be premium quality vinyl siding. Plywood and metal siding are not permitted. Additional siding requirements: 1416SN0679-2016APR27-BOS-RPT 1.Cementitious and vinyl siding is permitted in traditional wide beaded styles only. Premium quality vinyl is defined as vinyl siding with a minimum wall thickness of .044”. 2.Synthetic Stucco (E.I.F.S.) siding shall be finished in smooth, sand or level texture. Rough textures are not permitted. iii.Roof Material:Roofing material shall be dimensional architecturalshingles or better with a minimum 30 year warranty. iv.Porches, Stoops and Decks 1.Front Porches:All front entry stoops and front porches shall be constructed with continuous masonry foundation wall or on 12”x12” masonry piers. Extended front porches shall be a minimum of five (5)’ deep. Space between piers under porches shall be enclosed with framed lattice panels. Handrails and railings shall be finished painted wood or metal railing with vertical pickets or swan balusters. Pickets shall be supported on topand bottom rails that span between columns. 2.Front Porch Flooring:Porch flooring shall be permitted to be concrete, exposed aggregate concrete, or a finished paving material such as stone, tile or brick, finished (stained dark) wood, or properly trimmed composite decking boards. Unfinished treated wood decking is not permitted. All front steps shall be masonry to match the foundation. v.Garages:Front loaded garages shall be prohibited. Any garage shall be side or rear loaded. (P) (STAFF/CPC)5. Cash Proffers.For each dwelling unit, the applicant, sub-divider, or assignee(s) shall pay the following to the County of Chesterfield, prior to the issuance of a building permit for infrastructure improvements within the cash proffer service district for the property, unless state law prevents enforcement of that timing: a.$18,966 per dwelling unit for the period beginning the July 1 preceding the Board of Supervisors’ approval of the case through July 1 four years later, at which point the amount will be adjusted for the cumulate change in the Marshall and Swift Building Cost index during that time period. b.Thereafter, the per dwelling unit cash proffer amount shall be automatically adjusted, annually, by the annual change in the Marshall and Swift Building Cost Index on July 1 of each year. c.Cash proffer payments shall be spent for the purposes proffered or as otherwise permitted by law. (B&M) 1516SN0679-2016APR27-BOS-RPT ATTACHMENT 2 CONCEPTUAL SUBDIVISION LAYOUT 1616SN0679-2016APR27-BOS-RPT