Loading...
16SN0701 CASE NUMBER: 16SN0701 APPLICANT: Hanky, LLC CHESTERFIELD COUNTY, VIRGINIA STAFF’S ANALYSIS Magisterial District: CLOVER HILL 27 North Courthouse Road AND RECOMMENDATION Board of Supervisors (BOS) Public Hearing Date: JUNE 22, 2016 BOS Time Remaining: 365 DAYS Applicant’s Agent: DANIEL L. CASKIE (804-569-7060) Applicant’s Contact: MICHAEL C. HANKY (804-569-7060) Planning Department Case Manager: RYAN RAMSEY (804-768-7592) APPLICANT’S REQUEST Conditional use to permit a warehouse (self-storage facility) and office uses plus conditional use planned development to permit exceptions to ordinance requirements in an Agricultural (A) District. Specifically, modifications and exceptions are requested for building and parking setbacks that are adjacent to Agricultural (A) zoning. The development of an indoor self-storage facility with accessory office space is planned. An indoor self-storage facility is a use first permitted by right in the Light Industrial (I-1) and General Business (C-5) Districts. Notes: A.Conditions may be imposed or the property owner may proffer conditions. B.Proffered Conditions, Textual Statement, Conceptual Site Plan and Conceptual Elevations are located in Attachments 1 - 4. RECOMMENDATION RECOMMEND APPROVAL Uses will be limited PLANNING Proposal contains high-quality architecture, compatible with COMMISSION area development (5/17/2016) Unique development opportunity that would have minimal impact on adjoining properties Providing a FIRST CHOICE community through excellence in public service RECOMMENDATION (CONTINUED) RECOMMEND DENIAL Plan suggests office, not light industrial or general commercial uses STAFF Fails to aggregate parcels at intersection Fails to limit height and offer residential character for buildings 216SN0701-2016JUN22-BOS-RPT SUMMARY OF IDENTIFIED ISSUES Department Issue While the accessory office uses comply with Plan, the proposed indoor self-storage facility does not comply with the office land use designation recommended by the Plan. The development fails to adhere to components of Note 3 within the Plan, which suggests: PLANNING Aggregating all of the parcels designated for office at this intersection; Limitingbuildings to1 story in height; and Design buildingsto be residential in character. FIRE - CDOT - VDOT - UTILITIES - ENVIRONMENTAL - ENGINEERING 316SN0701-2016JUN22-BOS-RPT 0256 - 7194 703 - - 9576 745 703 - - 744 703 - 7882 744 - 703 - 744 416SN0701-2016JUN22-BOS-RPT Map 2: Comprehensive Plan (Northern Courthouse Road Community Plan) Classification: OFFICE* The designation suggests the property is appropriate for professional and administrative offices. Retail and service uses that serve primarily office developments would be appropriate when part of a mixed use project of aggregated acreage under a unified plan of development and when located interior to the project. * Note 3 of the Plan applies to the request properties. One-story professional and administrative offices that are residential in character will be allowed. All parcels must be aggregated in this area in order to be developed. Map 3: Surrounding Land Uses & Development Single-family Residential Kirney Subdivision North Courthouse Road Vacant Reams Rd 516SN0701-2016JUN22-BOS-RPT PLANNING Staff Contact: Ryan Ramsey (804-768-7592) ramseyrp@chesterfield.gov PROPOSAL & USES Development of a self-storage facility, to include accessory office space, is planned. A conceptual site plan and elevations for the facility are located in Attachments 3 and 4. A self-storage facility is a use first permitted in General Business (C-5) and Light Industrial (I-1) Districts, under the designation of a “warehouse” use. Uses for this property would be limited to office and indoor self-storage warehouse uses only. No outside storage or on-site auctions would be permitted. The following provides an overview of the development: General Overview Requirements Details The Textual Statement serves as the Master Plan and outlines exceptions to permit modified setback standards Exhibit A –Conceptual Site Plan Master Plan Layout of development to generally conform to Concept Plan Exhibit B – Conceptual Architectural Elevations Proffered Conditions 1 & 4 Limit uses to office and indoor self-storage warehouse uses only. Provide a minimum of 5,600 gross square feet of Uses office space Outside storage and on-site auctions prohibited. Proffered Conditions2& 3 Uses developed according to Emerging Growth Design District standards, except as modified for buffersand Development Standards setbacks. Textual Statement & Proffered Condition5 Compatible with Exhibit B Portions of buildings visible to public rights-of- way and adjoining properties zoned R or A, Architecture & Building Materials require the use of brick or masonry split-faced block 1 and 2-story buildings permitted Proffered Condition 6, Attachment 4 616SN0701-2016JUN22-BOS-RPT General Overview(Continued) Requirements Details Buffers provided around the perimeter of the property, in accordance with Exhibit A: North –10’ & 50’ Buffers South – 15’& 50’ Buffers Buffers and Screening East – 100’ Buffer West – 10’, 15’ and 50’ Buffers Screen parking area along northern property line with fence Proffered Conditions 7 & 8, Attachment 3 Permit 1 freestanding, monument-style sign that meets Signage Zoning Ordinance requirements Proffered Condition 9 Parking lot lighting not to exceed 20 feet in height for Lightinguses permitted Proffered Condition 10 Limited to 6:00 AM to 10:00 PM, daily Hours of Operation Proffered Condition 11 Prohibit servicingbetween the hours of 8:00 PM and Hours of Servicing Waste Storage 7:00 AM Areas Proffered Condition 12 ARCHITECTURE & DESIGN Per the Northern Courthouse Road Community Plan, development of the request properties should contain the following elements: Designed to be residential in character; Limited to one (1) story in height; Aggregate the office-designated parcels at the northeast corner of North Courthouse and Reams Road for development. The applicant’s proposal is a mix of one (1) and two (2) story buildings that use similar building materials and architecture found in the newly constructed North Courthouse Road Library. The proposalonly encompasses 7 acres of the 13.7 acres of office-designated property at the northeast corner of North Courthouse and Reams Road. Consequently, the applicant’s proposal would not be representative of the development pattern recommended by the Plan. DEVELOPMENT STANDARDS Typically nonresidential development would comply with the Emergent Growth Design District standards within commercial, office or industrial zoning districts. The applicant’s request would maintain the site’s current agricultural zoning with a conditional use to permit the indoor self- storage facility and office uses. Therefore, building setbacks would normally comply with agricultural standards and parking areas setbacks would comply with Emergent Growth Design District standards. 716SN0701-2016JUN22-BOS-RPT As proffered, building and parking area improvements on the request property would be regulated by Emerging Growth Design District standards for the Corporate Office (O-2) District. However, side yard setbacks for building and parking areas cannot be achieved per the Concept Site Plan (Attachment 3). A modification for the building setback and an exception for the parking setback are requested.(Textual Statement, Attachment 2) The following table highlights the modification and exception to Emerging Growth standards needed to accommodate the planned site improvements: Development Standards Emerging Growth Design Modification Proposed District Requirement 30’ with Perimeter25’ setback; Landscape A (Adjacent with 10’ or 15’ Building Setbacks & Landscaping to A, R, R-TH, R-MF or buffer plantings* From Side Yard MH Zoning) Concept Plan & Textual Statement, Item 1 Emerging Growth Design Exception Proposed District Requirement 30’ with Perimeter 10’ or 15’ setback; Landscape A (Adjacent with 10’ or 15’ Parking Setbacks & Landscaping to A, R, R-TH, R-MF or buffer plantings* From Side Yard MH Zoning)Concept Plan & Textual Statement, Item 2 * Required buffers vary by location on the site and are shown on the Conceptual Site Plan, Attachment 3. The applicant’s proposal will provide an enhanced landscaping treatment(Perimeter Landscape C) within the required buffer areas as compared to the landscaping required for side yard setbacks (Perimeter Landscape A) within the Emerging Growth Design District. 816SN0701-2016JUN22-BOS-RPT PUBLIC FACILITIES FIRE SERVICE Staff Contact: Anthony Batten (804-717-6167) battena@chesterfield.gov Nearby Fire and Emergency Medical Service (EMS) Facilities Fire Station The Courthouse Fire Station, Company Number 20 EMS Facility The Courthouse Fire Station, Company Number 20 When the property is developed, the number of hydrants, quantity of water needed for fire protection, and access requirements will be evaluated during the plans review process. COUNTY DEPARTMENT OF TRANSPORTATION Staff Contact: Jim Banks (804-748-1037) banksj@chesterfield.gov The Comprehensive Plan, which includes the Thoroughfare Plan, identifies county-wide transportation needs that are expected to mitigate traffic impacts of future growth. The anticipated traffic impact of the proposal has been evaluated and recommendations are detailed in the chart below: RecommendationApplicant’s Proposal Right of Way Dedication Offered as Recommended. 45 feet from centerline along Reams Road. Proffered Condition 14 Vehicular Access Control No direct access to Reams Road. Access to Courthouse Road limited to one Offered as Recommended. entrance/exit. Proffered Condition 15 Note: An access easement will be provided to the adjacent property to the south. Road Improvements A separate right turn lane Courthouse Road at the approvedaccess. Offered as Recommended. Proffered Condition 16 A sidewalk along Courthouse Road and along Reams Road for the property frontage. 916SN0701-2016JUN22-BOS-RPT VIRGINIA DEPARTMENT OF TRANSPORTATION Staff Contact: Brian Lokker (804-674-2384) brian.lokker@vdot.virginia.gov VDOT Land Use Regulations - Traffic Impact Analysis (24VAC30-155) - Access Management (24VAC30-73) - Subdivision Street Acceptance (24VAC30-91/92) - Land Use Permit (24VAC30-151) VDOT has no comment on this request. Summary 1016SN0701-2016JUN22-BOS-RPT WATER AND WASTEWATER SYSTEMS Staff Contact: Jamie Bland (804-751-4439) blandj@chesterfield.gov Theproposal’s impacts on the County’s utility system are detailed in the chart below: Water and Wastewater Systems Currently Size of Existing LineConnection Required by County Code? Serviced? Water No 16”Yes Wastewater No 8”Yes Map 5: Existing Water & Wastewater Systems 1116SN0701-2016JUN22-BOS-RPT Additional Information: There is an existing 16” public water line along Reams Road and North Courthouse Road for connection, and a 8” public wastewater line running along Courthouse Road. Water connection is readily available. Current connection fees found at www.chesterfield.gov/utilities. Will be responsible of developer in addition to utility work required for connecting. Sewer connection will require a crossing of North Courthouse Road. A public sewer line must be able to serve 15, 31 and 39 North Courthouse Road in future. Developer must dedicate easement along frontage of North Courthouse Road for future extensions of sewer by others. The proposed request will not adversely impact the public water and wastewater systems. 1216SN0701-2016JUN22-BOS-RPT ENVIRONMENTAL Drainage, Erosion and Water Quality Staff Contact: Rebeccah Ward (804-748-1028) wardr@chesterfield.gov Stormwater Issue Discussion/Conditions Located within the Falling Creek Watershed The western corner of the property drains to existing storm sewer along Courthouse Road The majority of the property drains to the south to an existing culvert under Reams Road, which may not be adequate for the Geography proposed development The culvert discharges to a small stream which transverses a property on the southern side of Reams Road, then under several driveways into a storm sewer system along Courthouse Road The storm sewer along Courthouse Road discharges into a pond maintained by VDOT on the western side of Courthouse Road The project is subject to the Part IIB technical criteria of the Virginia Stormwater Management Program Regulations for both water quality and quantity On-site detention/retention must be provided to achieve minimum 10-year storm performance on the existing culvert under Reams Road, as determined at time of site plan review Proffered Condition 17 Stormwater Management A hydraulic analysis of the existing VDOT stormwater basin on the western side of Courthouse Road must be provided for the post- development 100-year storm event. A minimum of one-foot of freeboard must be maintained within the basin, or on-site retention/detention must be provided such that the 100-year storm event does not exceed the pre-developed discharge rate for the 100-year storm event 1316SN0701-2016JUN22-BOS-RPT CASE HISTORY Applicant Submittals 3/7/16 Application, proffers and textual statement submitted 4/13/16 & Revised applications were submitted 4/21/16 4/25/16 Revised proffers, textual statement, concept plan and elevations were submitted 4/28/16& Revised proffers and textual statement were submitted 5/9/16 Community Meeting 3/29/16Issues Discussed Size of the storage units within the facility Lighting and landscape treatment along the northern property line Hours of operation for the facility would be limited Planning Commission Meeting 5/17/16Citizen Comments No citizens spoke to this case. Commission Discussion Questions and comments relative to permitted uses, site layout, signage and fencing were addressed by the applicant: Incorporate office space for small business use At this time, unable to acquire corner site to aggregate –will provide cross access easement between properties Monument style-signage No retail; saleof limited items used for storage purposes only permitted in the storage office Vinyl fencing provided at request of adjacent property owner Uses would be limited Quality architecture, compatible to the North Courthouse Road Library, offered by the applicant As conditioned, the request is a unique use of the property that will have minimal impact on adjoining properties Recommendation – APPROVAL SUBJECT TO PROFFERED CONDITIONS IN ATTACHMENT 1 Motion: Freye Second: Sloan AYES: Wallin, Sloan, Freye, Jackson and Jones The Board of Supervisors on Wednesday, June 22, 2016, beginning at 6:30 p.m., will consider this request. 1416SN0701-2016JUN22-BOS-RPT ATTACHMENT 1 PROFFERED CONDITIONS Note: The following proffered conditions were recommended by the Planning Commission only 1.Master Plan. The textual statement dated May 6, 2016 and the following exhibits, each of which is made a part of these proffers by this reference thereto, shall be considered the Master Plan. a.Exhibit A, entitled Courthouse Commercial Concept Plan, prepared by The Bay Companies, Inc. and dated April 11, 2016. b.Exhibit B, entitled Courthouse Commercial, prepared by GMF + Associates and dated February 28, 2016.(P) 2.Uses. Uses shall be limited to office and indoor self-storage warehouse uses only. Outside storage and on-site storage auctions shall be prohibited. (P) 3.Minimum Office Space Provided. The development of an indoor self-storagewarehouse facility shall contain a minimum of 5,600 gross square feet of office space, as shown on the Concept Plan (Exhibit A), within Building A. (P) 4.Concept Plan Requirements. The site shall be designed as generally depicted on the Conceptual Site Plan (Exhibit A). However, the exact location of buildings, parking and other improvements may be modified provided such modifications comply with Ordinance standards, conditions herein, and provided that the general intent of the plan is maintained. Modifications to the Concept Plan may be reviewed and approved by the Director of Planning at time of site plan review. (P) 5.Development Standards. Except for any bulk exceptions specified in the textual statement and for buffers, development of any permitted use shall meet the Zoning Ordinance development standards applicable to the Corporate Office (O-2) District in the Emerging Growth Design District.(P) 6.Architectural Treatment. The architectural treatment of and exterior materials for the buildings on the Property shall be compatible and consistent with the elevations identified as Exhibit B, with the following provisions: a.Building Materials. i.The portions of the building elevations that are visible to public rights-of-way and adjacent properties zoned for residential or agricultural uses shall be constructed of brick or masonry split-faced block. 1516SN0701-2016JUN22-BOS-RPT ii.Building elevations internal to the development may also use E.F.I.S. and metal wall panels (excluding corrugated or unfinished metal panels) or equivalent permanent architecturally finished materials. b.Building Heights. Building heights shall be limited to the lesser of two (2) stories or thirty (30) feet. (P) 7.Buffers. Buffers shall be provided around the perimeter of the property, in accordance with Exhibit A, and shall meet Zoning Ordinance requirements. Buffers of at least fifty (50) feet in widthshall not be graded or cleared in order to retain existing vegetation within these areas. This provision shall not preclude either the removal of dead, diseased or dying vegetation within any buffer area or the placement of utilities which run generally perpendicular through the buffer. (P) 8.Screening. A six (6) foot tall, durable vinyl fence shall be provided within the buffer along a portion of the north Property line, generally as shown on Exhibit A. This fence shall provide screening of the adjoining parking area and “SWM Area” to the adjacent residence located at GPINs 744-703-7194, 744-703-Part of 9576 and 744703-Part of 7882. (P) 9.Freestanding Signage. One (1) freestanding, monument-style sign shall be permitted along North Courthouse Road.This sign shall meet Zoning Ordinancerequirements.(P) 10. Lighting. Parking lot lighting for uses permitted by this conditional use shall not exceed a height of twenty (20) feet. (P) 11. Hours of Operation. The hours of operation for offices and indoor self-storage warehouses uses shall be limited to 6:00 AM to 10:00 PM, daily. (P) 12. Hours of Servicing Waste Storage Areas. Solid waste storage areas for any use shall not be serviced between the hours of 8:00 PM and 7:00 AM.(P) 13. Burning Ban. The developer shall not use burning to clear or timber the subject property. (EE) 14. Dedication. Prior to any site plan approval, or within sixty (60) days of a written request by the Transportation Department, whichever occurs first, forty-five (45) feet of rightof way on the north side of Reams Road, measured from the centerline of that part of Reams Road immediately adjacent to the property, shall be dedicated, free and unrestricted, to and for the benefit of Chesterfield County. (T) 15. Access. a.No direct vehicular access shall be provided from the property to Reams Road. b.Direct vehicular access from the property to Courthouse Road shall be limited to one (1) entrance/exit, generally located towards the northern property line. The exact location of this access shall be approved by the Transportation Department. Prior to 1616SN0701-2016JUN22-BOS-RPT any site plan approval, an access easement, acceptable to the Transportation Department, shall be recorded across the property to provide shared use of the approved access with the adjacent property to the south (GPIN 745-703-0256). (T) 16. Road Improvements. Prior to issuance of a certificate of occupancy, the following road improvements shall be completed, as determined by the Transportation Department: a.Construction of additional pavement along the northbound lanes of Courthouse Road at the approved access to provide a separate right turn lane; b.Construction of a sidewalk along Courthouse Road and along Reams Road for the entire property frontage; c.Dedication to Chesterfield County, free and unrestricted, of any additional right-of- way (or easements) required for the improvements identified above. (T) 17. Drainage. On-site detention/retention must be provided to achieve minimum 10-year storm performance on the existing culvert under Reams Road, as determined at time of site plan review. In addition, the post-development 25-year peak discharge to the existing culvert shall not exceed the pre-development 25-year peak discharge.(EE) 1716SN0701-2016JUN22-BOS-RPT ATTACHMENT 2 TEXTUAL STATEMENT Hanky, LLC – Case Number 16SN0701 May 6, 2016 Requested: Conditional use plus conditional use planned development to permit office and indoor self-storage warehouse uses in an Agricultural (A) District. Specifically, the applicant requests the following exceptions to the Zoning Ordinance: 1.Building Setbacks. Interior Side Yard (when adjacent to A, R, R-TH, R-MF or MH): 25 feet. This a. setback exception shall not further reduce any proffered buffer area as shown on Exhibit A. 2.Parking Area Setbacks. Interior Side Yard (when adjacent to A, R, R-TH, R-MF or MH): 10 feet. This a. setback exception shall not further reduce any proffered buffer area as shown on Exhibit A. 1816SN0701-2016JUN22-BOS-RPT ATTACHMENT 3 CONCEPTUAL SITE PLAN – EXHIBIT A Fence per Proffered Condition 8 1916SN0701-2016JUN22-BOS-RPT ATTACHMENT 4 CONCEPTUAL ELEVATIONS – EXHIBIT B - 1 2016SN0701-2016JUN22-BOS-RPT ATTACHMENT 4 CONCEPTUAL ELEVATIONS – EXHIBIT B - 2 2116SN0701-2016JUN22-BOS-RPT