Loading...
17SN0782 CASE NUMBER: 17SN0782 APPLICANT: J.W. Lawler CHESTERFIELD COUNTY, VIRGINIA MATOACA DISTRICT STAFF’S ANALYSIS AND RECOMMENDATION Board of Supervisors Hearing: MAY 24, 2017 Board of Supervisors Time Remaining: 365 DAYS Applicant’s Contact: J.W. LAWLER (804-379-0808) Planning Department Case Manager: RYAN RAMSEY (804-768-7592) 10.2 Acres – 6100 Round Rock Road REQUEST Amendment of zoning approval (Case 01SN0201) to amend cash proffers in a Residential (R-88) District. Specifically, the applicant proposes to amend Proffered Condition 1 relative to a cash proffer payment. Notes: A. The only condition that may be imposed is a buffer condition. The property owner may proffer conditions. B. Proffered conditions and approved zoning conditions from Case 01SN0201 are located in Attachments 1 and 2. SUMMARY A single-family residential subdivision (Swift Creek Estates) is under development. There are 6 units included with this request, on which a cash proffer could be collected, in the amount of $13,708 per dwelling unit. Currently, the total potential value of the approved cash proffer equates to $82,248. With this request, the applicant is proposing to reduce the cash proffer amount to $9,400 per dwelling unit, with a total potential value of $56,400. Existing zoning conditions, and those proffered with this request provide design and architectural standards (Summarized on Pages 5 & 6) that are comparable in quality to the surrounding community. RECOMMENDATIONS PLANNING APPROVAL COMMISSION PLANNING AND TRANSPORTATION – APPROVAL Quality design and architecture provide for a convenient, attractive, and STAFF harmonious community. The development’s traffic impact will be addressed by providing cash payments. Providing a FIRST CHOICE community through excellence in public service SUMMARY OF IDENTIFIED ISSUES Department Issue The Public Facilities Plan suggests the Ettrick-Matoaca library should be expanded/replaced or a new facility should be constructed in the general LIBRARIES vicinity at or near current site. Land for expansion or replacement of this facility or new facility has not been acquired. The Public Facilities Plan suggests that Ettrick Elementary School be revitalized or replaced. the Plan also recommends revitalization or replacement of Matoaca East and Matoaca West Middle School, and a SCHOOLS new high school in the vicinity of Branders Bridge, Bradley Bridge and Ironbridge Roads. A budget has not been developed for the acquisition of land or construction of these school facilities as recommended in the Plan. 217SN0782-2017MAY24-BOS-RPT 317SN0782-2017MAY24-BOS-RPT Comprehensive Plan Classification: LOW DENSITY RESIDENTIAL The designation suggests the property is appropriate for residential use with a maximum of 1 dwelling unit per acre. Surrounding Land Uses and Development Single-family uses (Swift Creek Estates Subdivision) Round Rock Road Simmons Branch Terrace Amonte Parkway Single-family uses (Elko Farms Subdivision) Matoaca High School 417SN0782-2017MAY24-BOS-RPT PLANNING Staff Contact: Ryan Ramsey (804-768-7592) ramseyrp@chesterfield.gov Zoning History Case Number Request Rezoning to Residential (R-88). Proffered conditions included a cash proffer of $11,500 per dwelling unit to address the development’s impacts. The cash 01SN0201 proffer has been escalated by the Marshall and Swift Building Cost Index to Approved $13,708. (Condition 1) (6/2002) This staff report for Case 01SN0201 analyzed the impact of the proposed development on public facilities and the applicant’s offer to mitigate that impact. Proposal Single-family residential uses are proposed. An overall maximum of fifty-nine (59) dwelling units are permitted with the existing zoning. Fifty-nine (59) lots are recorded within the boundaries of the existing zoning request, of which six (6) would be impacted by this request. Design Requirements of Case 01SN0201 The following provides an overview of the approved design requirements referenced in attached case information (Attachment 2): Minimum house sizes Brick or stone veneer, dryvit type material foundations Design High quality residential development addresses the Comprehensive Plan goals for strong and sustainable neighborhoods that are visually attractive, well-planned and well-maintained. Further, the purpose and intent of the zoning ordinance to promote the health, safety, convenience and general welfare of the public includes the creation of convenient, attractive and harmoniouscommunities, protection against overcrowding of land, and protection of the natural environment. As such, developments that promote unique, viable and long lasting places and enhance the community are encouraged. The following provides an overview of additional design requirements offered as part of this request (Attachment 1 -Proffered Condition): Architectural styles compatible to homes constructed in the Swift Creek Estates subdivision Varied architectural style for dwellings located side-by-side or directly across a street 30-year architectural/dimensional roof shingles 517SN0782-2017MAY24-BOS-RPT Each unit required to have an attached garage;maximum projection for front-loaded garages from front facade; upgraded garage door treatments for front and corner-side loaded garages Variety of siding materials to include vinyl with minimum thickness of 0.042 inches Front porch treatments, if provided Front foundation planting bedsand installation of a front yard tree Gravel, concrete, asphalt or decorative paver driveways and concrete front walks Provide initial screening of HVAC/whole house generators from public roads with landscaping or low maintenance material As suggested by the Comprehensive Plan goals and zoning ordinance, the proffered conditions of this current request along with those approved with Case 01SN0201 include design and architectural elements that will be compatible with the surrounding community. COUNTY TRANSPORTATION Staff Contact: Jim Banks (804-748-1037) banksj@chesterfield.gov The property consists of 6 recorded lots in Swift Creek Estates Subdivision. Based on that number oflots and applying trip generation rates for a single-family dwelling, development could generate approximately 79average daily trips. Traffic generated by development of the property will be distributed via John Winston Jones Parkway to Woodpecker Road. Woodpecker Road is a major arterial with a recommended right of way width of 90 feet, as identified on the County’s Thoroughfare Plan. Woodpecker Road is a two-lane road. Sections of the road were improved in conjunction with the construction of Matoaca High School. Other sections of the road are substandard, with approximately 10-foot lane widths and no usable shoulders. VDOT minimum geometric design standards recommend this road have 12-foot lane widths and 10 foot shoulders. In 2015, the traffic count on Woodpecker Road between Matoaca Road and Sandy Ford Road was 7,205 vehicles per day (Level of Service “E”). Section 19.1-231 of the County Code outlines the general requirements to meet the needs of the traffic generated by a proposed development, including acceptable levels of service. This proposed residential development would contribute to an identifiable need for transportation improvements. The applicant has not offered to provide any mitigating road improvements. The property is located within Traffic Shed 18, which encompasses the area of the County south of Route 10, east of Lewis Road, Bradley Bridge Road, and Sandy Ford Road, west of Harrowgate Road, and north of Hickory Road, Woodpecker Road, and Lakeview Avenue. Several roads in this traffic shed or which serve this traffic shed are substandard, with little or no shoulders, fixed objects (trees) adjacent to the edge of the pavement, and poor vertical and horizontal alignments. The traffic volume generated from this proposed residential development will contribute to an identifiable need for transportation facility improvements to these roads in excess of existing transportation facility capacity. Roads in this shed or which serve this shed need to be improved or widened to address safety and accommodate increased traffic, including the increased traffic from the proposed development. 617SN0782-2017MAY24-BOS-RPT An applicant may choose to address the development’s impact on the county’s road transportation network through dedication of property, construction of road improvements, or a cash proffer. If an applicant elects to offer cash to address the impact on the county’s road transportation network, Transportation staff has calculated the average impact of a single- family dwelling unit on the transportation network to be $12,652; however, the Board of Supervisors has adopted a policy establishing that it would accept a maximum cash proffer of $9,400 per dwelling unit as addressing the traffic impacts of residential development, with all of the funds to be dedicated towards improvements to the road network. As such, if the applicant chooses to address the development’s impacts on the county’s road network through payment of a cash proffer, $9,400 per dwelling unit for improvements to the road network would be appropriate. The applicant has proffered to pay $9,400 per dwelling unit (Proffered Condition). Staff supports the request. BUDGET & MANAGEMENT Staff Contact: Natalie Spillman (804-318-8767) spillmann@chesterfield.gov County finance staff is responsible for managing the finances of the County and making recommendations to the County Administrator regarding the allocation of available resources for the provision of services and capital facilities to serve the citizens of the County. Finance staff will advise the County Administrator if changed economic circumstances require adjustments to the County’s budget or capital improvement program. VIRGINIA DEPARTMENT OF TRANSPORTATION Staff Contact: Brian Lokker (804-674-2384) brian.lokker@vdot.virginia.gov Virginia Department of Transportation has no comment on this request. 717SN0782-2017MAY24-BOS-RPT FIRE AND EMERGENCY MEDICAL SERVICES Staff Contact: Anthony Batten (804-717-6167) battena@chesterfield.gov Mission The mission of Fire and Emergency Medical Services (EMS) is to protect life, property and the environment through a comprehensive fire and life safety program that ensures an adequate and timely response to emergencies. Response Times The proposed development is located in the rural response zone for which Fire & EMS has a goal of responding to at least 90% of the calls for service in under twelve (12) minutes. Fire and EMS is currently unable to meet that goal. Nearby Fire/EMS Facilities The Matoaca Station, Company Number 8 The Ettrick-Matoaca Volunteer Rescue Squad Anticipated Fire & EMS Impacts/Needs Based on an average of 0.24 calls per dwelling, it is estimated that this development will generate one (1) annual call for Fire/EMS services. Additional Fire and EMS Comments When the property is developed, the number of hydrants, quantity of water needed for fire protection, and access requirements will be evaluated during the plans review process. 817SN0782-2017MAY24-BOS-RPT SCHOOLS Staff Contact: Atonja Allen (804-318-8740) atonja_allen@ccpsnet.net Mission High performing, high quality public schools contribute to the quality of life and economic vitality of the County. The comprehensive plansuggests a greater focus should be placed on linking schools with communities by providing greater access, flexible designs and locations that better meet the needs of the communities in which they are located. Capital Improvements The School Board FY2017 adopted Capital Improvement Plan (CIP) continues to support the 2013 voter approved school revitalization program that will replace or renovate ten schools and construct one new elementary school to add capacity in the Midlothian area of the county. The ten existing facilities that are part of the revitalization program are Providence Middle School, Monacan High School, Manchester Middle School, Beulah Elementary School, Enon Elementary School, Matoaca Elementary School, Harrowgate Elementary School, Reams Elementary School, Crestwood Elementary School, and Ettrick Elementary School. The project at Providence Middle School is currently in construction, a new Manchester Middle School is planned for construction on the existing school site,and the project at Monacan High School is complete. Additional information on the CIP can be found in the financial section of the CCPS Adopted Budget for FY2017. Anticipated School Impacts Enrollment Anticipated Schools Percent of Functional Number of Current Student Yield by Currently Serving Total Capacity Trailers Enrollment School Type Area Functional Capacity Elementary 1 Ettrick 709 1 619 87 Middle 1 Matoaca 12673 930 73 High1 Matoaca 19135 1756 92 Total\[1\] 3 Note: Based upon average number of students per single family dwelling unit countywide at 0.48 students per unit. \[1\] Public Facilities Plan The Public Facilities Planrecommends that Ettrick Elementary School be revitalized or replaced between 2014-2020. Post 2020, the Plan also recommends revitalization or replacement of Matoaca East and Matoaca West Middle School, and a new high school in the vicinity of Branders Bridge, Bradley Bridge and Ironbridge Roads, however at this time a budget has not been developed for the acquisition of land or construction of these school facilities as recommended in the Plan. 917SN0782-2017MAY24-BOS-RPT LIBRARIES Staff Contact: Jennifer Stevens (804-751-4998) stevensj@chesterfield.gov Mission The public library system’s role in the county has expanded beyond its traditional function as a resource for information and materials, and now serves as a community gathering place for educational, cultural and informational services; community support during emergencies; economic development;and revitalization activities. Nearby Libraries Ettrick-MatoacaLibrary Public Facilities Plan The Public Facilities Plan suggests the Ettrick-Matoaca library should be expanded/replaced or a 20,000 square foot new facility shall be constructed in the general vicinity at or near current site. Land for expansion or replacement of this facility or new facility has not been acquired. PARKS AND RECREATION Staff Contact: Stuart Connock (804-751-4484) ConnockS@chesterfield.gov To date, no comments have been received. ENVIRONMENTAL ENGINEERING Staff Contact: Rebeccah Ward (804-748-1028) WardR@chesterfield.gov Environmental Engineering has no comment on this request. UTILITIES Staff Contact: Jamie Bland (804-751-4439) blandj@chesterfield.gov The proposed request to reduce cash proffer will not impact the public water and wastewater systems. 1017SN0782-2017MAY24-BOS-RPT CASE HISTORY Applicant Submittals 2/6/17 Application submitted 3/30/17 Revised proffered conditions were submitted Community Meeting 4/13/17 The applicant clarified specifics relative to the proposal and noted no changes proposed to minimum dwelling sizes or architectural quality found within the community. Planning Commission 4/26/17Citizen Comments: No citizens spoke to this request. Recommendation –APPROVAL AND ACCEPTANCE OF THE PROFFERED CONDITIONS IN ATTACHMENT 1 Motion: Freye Second: Wallin AYES: Sloan, Jackson, Freye, Jones and Wallin The Board of Supervisors on Wednesday, May 24, 2017, beginning at 6:00 p.m., will consider this request. 1117SN0782-2017MAY24-BOS-RPT ATTACHMENT 1 PROFFERED CONDITIONS Note: Both the Planning Commission and Staff recommend acceptance of the following proffered conditions, as offered by the applicant. With the approval of this request, Proffered Condition 1 of Case 01SN0201 shall be amended as outlined below. Road Cash Proffer. For each dwelling unit, the applicant shall pay $9,400.00 per dwelling 1. unit or the amount approved by the Board of Supervisors not to exceed $9,400.00 to the County of Chesterfield for road improvements within the service district for the property. Each payment shall be made prior to the issuance of a certificate of occupancy for a dwelling unit, unless state law modifies the timing of the payment. (T) The Applicant hereby offers the following proffers: Architectural/Design Elements: 2. a.Driveways/Front Walks i.Driveways: All portions of driveways and parking areas shall be brushed concrete, stamped concrete, exposed aggregate concrete, asphalt, decorative pavers or gravel. ii.Front Walks: A minimum of a 42-inch-wide concrete front walk shall be provided to the front entrance of each dwelling unit, to connect to drives, sidewalks or street. b.Landscaping i.Front Yard Tree: One (1) tree per lot shall be planted or retained. A tree shall be planted or retained on both street frontages on corner lots. The front yard tree shall be a large deciduous tree and have a minimum caliper of 2.5 inches. Native trees shall be permitted to have a minimum caliper of 2 inches. ii.Front Foundation Planting Beds: Foundation planting is required along the entire front façade of all units, and shall extend along all sides facing a street. Foundation Planting Beds shall be a minimum of four (4) feet wide from the unit foundation. Planting beds shall be defined with a trenched edge or suitable landscape edging material. Planting beds shall include medium shrubs and may include spreading groundcovers. Unit corners shall be visually softened with vertical accent shrubs (4’-5’) or small evergreen trees (6’-8’) at the time of planting. 1217SN0782-2017MAY24-BOS-RPT c.Architecture and Materials i.Style and Form:The architectural styles shall be interpretations of traditional Richmond architecture, using forms and elements compatible with those in the Swift Creek Estates subdivision such as Georgian, Adam, Classical Revival Colonial, Greek Revival, Queen Anne, and Craftsman Styles. ii.Repetition: Dwellings with the same elevations may not be located adjacent to, directly across from, or diagonally across from each other on the same street. This requirement does not apply to units on different streets backing up to each other. iii.Exterior Facades: Acceptable siding materials include brick, stone, masonry, stucco, synthetic stucco (E.I.F.S), vinyl siding, and approved horizontal lap siding. Horizontal lap siding may be manufactured from natural wood or cement fiber board or may be premium quality vinyl siding with a minimum wall thickness of 0.042 inches. Plywood and metal siding are not permitted. d.Roof Materials: Roofing material shall be dimensional architectural shingles or better with a minimum 30-year warranty. e.Porches and Stoops i.Front Porches: All front entry stoops and front porches shall be constructed with continuous masonry foundation wall or on 12” x 12” masonry piers. Extended front porches shall be a minimum of five (5) feet deep. Space between piers under porches shall be enclosed with framed lattice panels. Handrails and railings shall be finished painted wood, vinyl rails or metal rail systems with vertical pickets or swan balusters. Pickets shall be supported on top and bottom rails that span between columns. f.Garages. i.All units shall have an attached garage. Front loaded attached garages shall be permitted to extend as far forward from the front line of the main dwelling as the front line of the front porch provided that the rooflines of the porch and garage are contiguous. Where the rooflines are not contiguous, garages shall be permitted to project a maximum of two (2) feet forward of the front line of the main dwelling. ii.Front loaded and corner side loaded garages shall use an upgraded garage door. An upgraded garage door is any door with a minimum of two (2) enhanced features. Enhanced features shall include windows, raised panels, decorative panels, arches, hinge straps or other 1317SN0782-2017MAY24-BOS-RPT architectural features on the exterior that enhance the entry (i.e. decorative lintels, shed roof overhangs, arches, columns, keystones, eyebrows, etc.) Flat panel garage doors are prohibited. g.Heating, Ventilation and Air Conditioning (HVAC) Units and Whole House Generators.Units shall initially be screened from view of public roads by landscaping or low maintenance material, as approved by the Planning Department. (P) 1417SN0782-2017MAY24-BOS-RPT ATTACHMENT 2 APPROVED CONDITIONS (01SN0201) 1517SN0782-2017MAY24-BOS-RPT 1617SN0782-2017MAY24-BOS-RPT 1717SN0782-2017MAY24-BOS-RPT