Loading...
84S129~QUEST~ ~ ~: August 6, 1984 EO, Box 1990 Midlothian Virginia 23113 804.744.9005 Ms. Beverly Rogers Planning Department Chesterfield County Chesterfield, VA 23832 Dear Veverly: The following is a summary of our various conversations concerning parking in Market Square. While we are sympathetic with the problems that have o¢cured at Midlothian Cinemas, we believe that the situation in Market Square is quite different. Requiring a full 367 additional parking spaces for the theater alone would seem to be overkill, especially when you project the land area required for this many more spaces relative to existing parking areas. It would require more than doubling the parking area presently existing in front of Safeway. This requirement would be even more ludicrous when different operating hours are taken into account. The peak hours for a convenience center (like Market Square) are 4:00- 6:00 P.M. when only 2 spaces per 1000 square feet are required, whereas the peak hours for theaters do not occur until after 7:00 P.M. when there is little patronage of retail facilities. There is no overlapping of available parking use at Midlothian Cinemas due to distances involved. This theater is basically a free standing theater, while the Market Square theaters will be an integral part of the shopping center. In addition, the operator of the theaters in Brandermill is proposing to dedicate one theater (225 seats) exclusively for children, with specially designed seating, etc. Experience has shown that such a theater generates primarily drop off and pedestrian traffic (not requiring parking spaces). Also, the bicycle/pedestrian system in Brandermill would encourage an even greater degree of pedestrian and other nonautomobile traffic. In recent studies the Urban Land Institute has made the following recommendations: Ms. Beverly Rogers August 6, 1984 Page Two For centers of 25,000 to 400,000 square feet, only 4.0 spaces per 1000 square feet are required; e For centers of 100,000 to 200,000 square feet and having cinemas with 450 seats, no additional parking is required; however, for larger cinemas, such centers require only 3 spaces per 100 seats. Utilizing these findings, we think that a recommendation for approval can be based on the following: I. Existing Conditions Existing retail space Existing Safeway Proposed retail (includin~ the theater square footage) 20,500 sq. ft. 38,590 sq. ft. 60,220 sq. ft. Total 119,310 sq. ft. of retail B. Total parking available* 584 spaces II. Parking Demand Case A: Utilizing Chesterfield County requirements for retail and the ULI recommendations for theaters: @ 4.4 spaces/1000 sq. ft., 119,310 sq. ft. requires: 525 parking spaces @ 3 spaces/100 seats, 1100 seats requires: 33 parking spaces Total spaces required 558 Total spaces provided* 584 Yields Case B: Utilizing ULI recommendations for retail and theaters: @ 4.0 spaces/1000 sq. ft. 119,310 sq. ft. requires: 477 parking spaces 26 extra spaces Ms. Beverly Rogers August 6, 1984 Page Three @ 3 spaces/100 seats, 1100 seats requires: 33 parking spaces Total spaces required 510 Total spaces provided* 584 Yields * These spaces devoted to retail are summarized as follows: Area A (in front of Market Square) Area B (behind Investors) Area C (around Safeway) Area D (to be provided by modifications) Total Spaces 74 extra spaces 109 spaces 67 spaces 382 spaces 26 spaces 584 spaces It should be noted that there are an additional 119 spaces in Market Square available for employee and office/bank parking throughout the day as well as. for parking for retail and theater use during non-office/bank hours. Additionally, there are several non-retail uses (realty offices, post office, etc.) which currently occupy areas included as retail square footages in this report. It would seem, therefore, that the parking provided is more than adequate to meet the peak demands of a convenience center such as Market Square and that to assume 100% of all spaces for retail are consumed by retail patrons during peak theater hours is not a valid conclusion based on extensive research by The Urban Land Institute. We therefore request a recommendation for approval by the staff based on the above information. Managing Partner JCP/lsd COLLABORATIVE August 15, 1984 Member'~ RO. Box 1990 Midlothian Virginia 23113 804-744.9005 Mr. Stan Balderson Director, Planning Department Chesterfield County Chesterfield, VA 23832 Dear Stan: Pursuant to our conversation re: rezoning case #84S129, the developer is willing to accept as an additional condition the following: "At the time of site plan review for Phase II (which includes the proposed theater) a specific schedule for the theater will be made a part of the conditions for site plan approval in order to address the parking issues and number of theater seats." I believe that, with this condition, the parking issues and Size of theater can be more aqcurately addressed at a more specific phase of the development process, while clearing the way for rezoning of the theater at this time. I appreciate your help in this matter. questions, please feel free to call. If you have any Managing P'~rtner JCP/lsd cc: J. B. Campbell Max Gardner Beverly Rogers