17SN0807
CASE NUMBER: 17SN0807
APPLICANT: BWS Enterprises, LLC, Sean Sawyer
CHESTERFIELD COUNTY, VIRGINIA
MIDLOTHIAN DISTRICT
ADDENDUM
Board of Supervisors (BOS) Hearing:
AUGUST 22, 2018
BOSTime Remaining:
365 DAYS
s:
DAVID S. ANDERSON (804-432-6699)
44.1 Acres 14291 Midlothian Turnpike
SEAN SAWYER (757-650-5759)
Planning Department Case Manager:
JANE PETERSON (804-748-1045)
REQUEST
Rezoning from Corporate Office (O-2) and Community Business (C-3) to Townhouse Residential
(R-TH) of 15.9 acres and Multifamily Residential (R-MF) of 28.2 acres plus conditional use planned
development to permit exceptions to ordinance requirements on a total of 44.1 acres.
Notes:
A.Conditions may be imposed or the property owner may proffer conditions.
III.I.2.a.x.ff
B.Amended Proffered Condition 1 and Textual Statement Item are attached, noting changes
with strikethroughs and underlines.
C.AMENDMENTS TO THIS CASE WERE MADE AFTER PUBLIC ADVERTISEMENT. THE BOARD OF SUPERVISORS
WOULD NEED TO UNANIMOUSLY SUSPEND THEIR RULES TO CONSIDER THESE AMENDMENTS.
SUMMARY
A townhouse and multifamily residential development is planned. A maximum of 435 dwelling
units are proposed to include 160 townhouses and 275 apartments, yielding an overall density of
9.9 dwelling units per acre. Exceptions to ordinance standards are requested to accommodate
these uses.
The traffic impact of this development could be valued at $2,498,520 (based on road cash proffer
of $5,922 for each townhouse unit and $5,640 for each apartment unit). The applicant has
proffered to provide road improvements to include:
a three-lane typical section for the Main Access at its intersection with Route 60
extension of Midlothian Wood Boulevard to property boundary; and
a sidewalk along Midlothian Wood Boulevard from Midlothian Wood Way to property
In addition, the applicant has proffered off-site Midlothian Turnpike improvements along the
eastbound lanes from Old Otterdale Road to the Ivymont Shopping Center entrance to include
pavement reduction; street trees; shared use path; street lighting; Midlothian gateway signage;
and crosswalk improvements with raised median extension at the shopping center entrance.
These improvements have an estimated value of $1,041,850, being $1,456,670 less than the
anticipated traffic impact of the proposed development.
Providing a FIRST CHOICE community through excellence in public service
SUMMARY (CONTINUED)
The applicant has proffered design and architectural standards (summarized on pages 7 through
9) to ensure a well-designed, quality development that would complement the surrounding
community.
ADDENDUM
The purpose of this Addendum is to provide an amendment to the Textual Statement and a
proffered condition, and to update the amendment dates and correct a typographical error in
the Case History section.
The Textual Statement amendment includes an additional exterior building material
(Celect Cellular Composite Siding) for use in the multifamily portion of the development.
Proffered Condition 1 has been amended to reflect the revision date of the Textual
Statement to accommodate this change.
The Case History has been updated to reflect the receipt of these amendments, and to
accurately reflect the estimated value of the off-site Midlothian Turnpike improvements
(strikethrough and underline) as noted at the 7/17/2018 Planning Commission hearing.
Planning staff supports acceptance of these amendments as provided in Attachments 1 and 2 of
RECOMMENDATIONS
PLANNING APPROVAL
COMMISSION AYES: Sloan, Freye and Jones NAY: Stariha ABSENT: Jackson
PLANNING APPROVAL
Complies with the recommendations of the Comprehensive Plan
relative to land uses and density
Ensures compatibility with, and appropriate transition to, surrounding
residential developments and existing and anticipated commercial uses
along Midlothian Turnpike
STAFF
Quality design and architecture offered by the applicant provide for a
convenient, attractive and harmonious community that would
complement the surrounding development.
TRANSPORTATION DENIAL
There are impacts on the road network specifically attributable to the
proposed development that have not been addressed, including
increased traffic volume and safety of the roads.
217SN0807-2018AUG22-BOS-RPT-ADD
SUMMARY OF IDENTIFIED ISSUES
Department Issue
Proposal fails to address its impact on the increased volume of traffic on
the road network.
CDOT
Proposal fails to address its impact on the safety of the roads on which
the increased volume of traffic will be traveling.
Post 2020, the tƌğƓ also recommends a new high school in the vicinity of
Genito and Otterdale Roads northwest of Swift Creek Reservoir, however
SCHOOLS
at this time a budget has not been developed for the acquisition of land or
construction of this school facility as recommended in the tƌğƓ.
The tǒĬƌźĭ CğĭźƌźƷźĻƭ tƌğƓ suggests the Midlothian library should be
expanded/replaced or a new facility shall be constructed in the general
LIBRARIES
vicinity at or near current site. Land for expansion or replacement of this
facility has not been acquired.
The tǒĬƌźĭ CğĭźƌźƷźĻƭ tƌğƓ identifies the need for a community park nearest
PARKS AND
this location generally east of Route 288, north of Hull Street and south of
RECREATION
Midlothian Turnpike. Land for this park has not been acquired.
317SN0807-2018AUG22-BOS-RPT-ADD
417SN0807-2018AUG22-BOS-RPT-ADD
CASE HISTORY
Applicant Submittals
4/10/17 Application submitted
7/13/17 Proffered conditions and textual statement submitted
8/11/17 Proffered conditions submitted
10/17 & Proffered conditions, textual statement, concept plan and elevations submitted
10/24/17,
1/5, 1/12,
2/6, 2/7,
2/15, 6/13,
7/6 &
8/21/18
Community Meetings
6/15/17 Issues Discussed:
Buffer adjacent to Midlothian Wood community
Number of residents in project as well as the potential impact of new
residents on school system and transportation network
Direction and storage of stormwater drainage on the property
Location of stormwater management facilities
Density of project, height of multi-family building, location of three-story
townhomes
Phasing of development, location of recreational amenities, and access
to recreational amenities (trails possible on the property)
11/16/17 Issues Discussed:
Direction and storage of stormwater drainage on the property
Location of stormwater management facilities
Impacts on school system and transportation network
Protection of area wells
Need for one-story housing and affordable housing for younger and
older populations
Cost of townhouses/rental rates for apartments
Proposal changes needed to create sense of place and walkability; less
suburban and more in context of a village
Importance of good architecture
Concerns that Midlothian Village is too heavy on residential
development not achieving a mix of uses
517SN0807-2018AUG22-BOS-RPT-ADD
Community Meetings (Continued)
6/28/18 Meeting to Update Community Leadership
Issues Discussed
Distribution of proposed site traffic using the Midlothian Turnpike and
Midlothian Wood Boulevard accesses
Building materials for apartments and associated maintenance
Road cash proffer and proposed transportation improvements
Diversion of stormwater
Maintenance responsibility for proffered landscaping along Midlothian
Turnpike
Benefits of proposed residential to the Ivymont Shopping Center and
other area businesses
Planning Commission
8/15/17 Action DEFERRED TO SEPTEMBER 19
MOTION WITH THE APPLICAN
9/19/17 Action DEFERRED TO NOVEMBER 21
11/21/17 Action DEFERRED TO FEBRUARY 20, 2018
2/20/18 Action DEFERRED TO MAY 15, 2018
5/15/18 Action DEFERRED TO JULY 17, 2018
7/17/18 Citizen Comments:
Several residents of the adjoining Midlothian Wood development indicated
support for the proposal, commending the applicants for addressing
neighborhood concerns relative to drainage and neighborhood buffers;
providing enhancements to the Village as a destination community; and offering
a project that is preferable to the non-residential uses permitted by the existing
zoning. A neighboring business owner noted the dependence of successful
Village commercial uses on area residential projects.
The applicant noted this proposal offers better and more connected uses than
as currently zoned; is sensitive to neighboring properties; addresses
architectural quality and pedestrian circulation; provides improvements to the
Village gateway; and reduces drainage problems experienced by Midlothian
Wood. The applicant indicated the cost for these drainage and associated
foundation improvements would total approximately $2,753,772, in addition to
the proffered Midlothian Turnpike improvements, valued at $1,456,670
$1,041,850.
617SN0807-2018AUG22-BOS-RPT-ADD
Commission Discussion:
Mr. Stariha noted support for the proposed development, but concern for
deviation from the Road Cash Proffer Policy relative to funding for public
improvements other than roads; the precedent this may set; and the absence of
final validation of the estimated drainage costs by staff.
Mrs. Freye confirmed with staff that the proposed residential development
would generate less vehicle trips than the existing commercial/office zoning.
She indicated a comfort that, with no proffered cash payment, the drainage
improvements did not present a conflict with the Policy and provided a benefit
to adjacent homeowners.
Mr. Sloan noted the Policy had been evolutionary since its adoption; that while
he agreed with Mr. Stariha as to a caution for precedent in proffer relief, he
viewed this case as unique given the proposed drainage improvements would
benefit neighbors, represented a significant investment to rectify an ongoing
problem, and had support from area citizens.
Mr. Jones indicated the proposal represented a tremendous benefit to the
Midlothian Wood community, which had relied on Fire Department assistance
several times to open their emergency access due to heavy rains flooding
community streets. He supported the project as very walkable and well-built.
Recommendation APPROVAL AND ACCEPTANCE OF THE PROFFERED
CONDITIONS IN ATTACHMENT 1.
Motion: Jones Second: Freye
AYES: Sloan, Freye and Jones NAY: Stariha ABSENT: Jackson
The Board of Supervisors on Wednesday, August 22, 2018, beginning at 6:00 p.m., will
consider this request.
717SN0807-2018AUG22-BOS-RPT-ADD
ATTACHMENT 1
PROFFERED CONDITION
(August 21, 2018)
This hereby amends Proffered Condition 1 to read as follows.
The property owner and applicant in this case, pursuant to Section 15.2-2298 of the Code of
Virginia (1950 as amended) and the Zoning Ordinance of Chesterfield County, for themselves
and their successors and assigns, proffer that the property under consideration for rezoning
ing proffers if, and only if, the request
submitted herewith is granted with only those conditions agreed to by the owner and
applicant. In the event this request is denied or approved with conditions not agreed to by the
owner and applicant, the proffers shall immediately be null and void and of no further force or
effect.
1.Master Plan. The Textual Statement dated July 6, 2018, last revised August 21, 2018,
and all referenced exhibits shall be considered the Master Plan. (P)
817SN0807-2018AUG22-BOS-RPT-ADD
ATTACHMENT 2
TEXTUAL STATEMENT
(Revised August 21, 2018)
Item III.I.2.a.x.ff of the Textual Statement dated July 6, 2018, is hereby amended as follows:
III. GENERAL CONDITIONS
Architecture.
Residential Buildings
a. All Residential Buildings
x. Consistent with the elevations identified in the textual statement,
building exteriors shall be clad in any combination of the following
materials:
ff. In the R-MF property only, Everlast® Advanced Composite
Siding, manufactured by Chelsea Building Products, Inc., or
Celect® Cellular Composite Siding, manufactured by Royal
917SN0807-2018AUG22-BOS-RPT-ADD
CASE NUMBER: 17SN0807
APPLICANT: BWS Enterprises, LLC, Sean Sawyer
CHESTERFIELD COUNTY, VIRGINIA
MIDLOTHIAN DISTRICT
STAFF
AND RECOMMENDATION
Board of Supervisors (BOS) Hearing:
AUGUST 22, 2018
BOSTime Remaining:
365 DAYS
s:
DAVID S. ANDERSON (804-432-6699)
tact:
44.1 Acres 14291 Midlothian Turnpike
SEAN SAWYER (757-650-5759)
Planning Department Case Manager:
JANE PETERSON (804-748-1045)
REQUEST
Rezoning from Corporate Office (O-2) and Community Business (C-3) to Townhouse Residential
(R-TH) of 15.9 acres and Multifamily Residential (R-MF) of 28.2 acres plus conditional use planned
development to permit exceptions to ordinance requirements on a total of 44.1 acres.
Notes:
A.Conditions may be imposed or the property owner may proffer conditions
B.Proffered conditions, Textual Statement and Exhibits are located in Attachments 1- 12.
SUMMARY
A townhouse and multifamily residential development is planned. A maximum of 435 dwelling
units are proposed to include 160 townhouses and 275 apartments, yielding an overall density of
9.9 dwelling units per acre. Exceptions to ordinance standards are requested to accommodate
these uses.
The traffic impact of this development could be valued at $2,498,520 (based on road cash proffer
of $5,922 for each townhouse unit and $5,640 for each apartment unit). The applicant has
proffered to provide road improvements to include:
a three-lane typical section for the Main Access at its intersection with Route 60
extension of Midlothian Wood Boulevard to property boundary; and
a sidewalk along Midlothian Wood Boulevard from Midlothian Wood Way to property
In addition, the applicant has proffered off-site Midlothian Turnpike improvements along the
eastbound lanes from Old Otterdale Road to the Ivymont Shopping Center entrance to include
pavement reduction; street trees; shared use path; street lighting; Midlothian gateway signage;
and crosswalk improvements with raised median extension at the shopping center entrance.
These improvements have an estimated value of $1,041,850, being $1,456,670 less than the
anticipated traffic impact of the proposed development.
Providing a FIRST CHOICE community through excellence in public service
SUMMARY (CONTINUED)
The applicant has proffered design and architectural standards (summarized on pages 7 through
9) to ensure a well-designed, quality development that would complement the surrounding
community.
RECOMMENDATIONS
PLANNING APPROVAL
COMMISSION AYES: Sloan, Freye and Jones NAY: Stariha ABSENT: Jackson
PLANNING APPROVAL
Complies with the recommendations of the Comprehensive Plan
relative to land uses and density
Ensures compatibility with, and appropriate transition to, surrounding
residential developments and existing and anticipated commercial uses
along Midlothian Turnpike
STAFF
Quality design and architecture offered by the applicant provide for a
convenient, attractive and harmonious community that would
complement the surrounding development.
TRANSPORTATION DENIAL
There are impacts on the road network specifically attributable to the
proposed development that have not been addressed, including
increased traffic volume and safety of the roads.
SUMMARY OF IDENTIFIED ISSUES
Department Issue
Proposal fails to address its impact on the increased volume of traffic on
the road network.
CDOT
Proposal fails to address its impact on the safety of the roads on which
the increased volume of traffic will be traveling.
Post 2020, the tƌğƓ also recommends a new high school in the vicinity of
SCHOOLS Genito and Otterdale Roads northwest of Swift Creek Reservoir, however
at this time a budget has not been developed for the acquisition of land or
construction of this school facility as recommended in the tƌğƓ.
The tǒĬƌźĭ CğĭźƌźƷźĻƭ tƌğƓ suggests the Midlothian library should be
LIBRARIES expanded/replaced or a new facility shall be constructed in the general
vicinity at or near current site. Land for expansion or replacement of this
facility has not been acquired.
PARKS AND The tǒĬƌźĭ CğĭźƌźƷźĻƭ tƌğƓ identifies the need for a community park nearest
RECREATION this location generally east of Route 288, north of Hull Street and south of
Midlothian Turnpike. Land for this park has not been acquired.
217SN0807-2018AUG22-BOS-RPT
317SN0807-2018AUG22-BOS-RPT
Comprehensive Plan (Midlothian Area Community Plan)
Classification: PLANNED TRANSITION AND SUBURBAN COMMERCIAL
The designation suggests a portion of the property is appropriate for auto-oriented uses to include retail
shopping centers and office service establishments, transitioning to a smaller-scale, pedestrian-oriented
environment consisting of a mix of offices, medium density housing (7-14 units/acre), personal services
and community facilities.
Surrounding Land Uses and Development
Midlothian Turnpike
Ivymont
Old Otterdale Rd
shopping center
Midlothian Wood Blvd
Midlothian Wood
Aldengate &
Little
Tomahawk
Station
subdivisions
417SN0807-2018AUG22-BOS-RPT
PLANNING
Staff Contact: Jane Peterson (804-748-1045) petersonj@chesterfield.gov
Zoning History
Case Number Request
Rezoning to Residential (R-15), Office Business (O) and Community
Business (C-3) of 71.8 acres with conditional use planned development. A
mixed-use development consisting of single family residential, office,
commercial and industrial uses was planned.
Approved master plan identifies development tracts
87SN0151
Request property included as part of this case and is located within the B-
Approved
O (office) and portion of B-2 (business) tracts. B-O tracts permit Corporate
(4/1988)
Office (O-2) uses. B-2 tracts permit limited Community Business (C-3) and
Light Industrial (I-1) uses
R-15 tract recorded as part of Aldengate subdivision. B-2 tracts (now C-3)
fronting Midlothian Turnpike, east and west of Old Otterdale Road remain
undeveloped.
Proposal
A residential development consisting of townhouse and multi-family (apartment) dwelling units
is planned with tree-lined streets, pedestrian connectivity, focal points and recreational
amenities throughout. A maximum of 160 townhouses containing two and three stories are
proposed on the eastern portion of the property containing 15.9 acres (Area A). Central to the
property, a maximum of 275 apartments within a four- story building are proposed, along with
undeveloped environmentally-protected areas to the west, totaling 28.2 acres (Area B). (Exhibit
A Attachment 3)
The development concept consists of a main boulevard entrance from Midlothian Turnpike to
the north, as well as access from Midlothian Wood Boulevard to the east. Townhouses would
be arranged in a traditional neighborhood design, with the majority of these units served by
alleys and on-street parking. The apartment building would be oriented east towards the
boulevard entrance, opening to a centrally-located main courtyard.
517SN0807-2018AUG22-BOS-RPT
Development Standards and Exceptions
Development would comply with the requirements identified in the proffered conditions and
Textual Statement (Attachments 1 and 2). While some requirements are reflective of Ordinance
standards for development in R-TH and R-MF Districts, exceptions are requested to accommodate
community and building design, as depicted in the Conceptual Plan. Modifications to Ordinance
requirements to provide this flexibility include:
Townhouse
Reduced lot area and building setbacks
o
Increased lot coverage and building heights
o
Some lots fronting common areas (BMP) rather than roads
o
On-street parking, in addition to garage parking
o
No common area to rear of units (accommodating alleys)
o
Multi-family
Reduced pavement width for drives
o
Reduced building and parking setbacks from interior drives and parking spaces
o
Increased building height
o
Increased number of dwelling units per floor
o
For R-TH, Ordinance standards are more typical of a suburban townhouse design. The variations
included in this request would facilitate a more traditional neighborhood design with a pedestrian
focus.
For R-MF, the architectural treatment and use of materials in achieving a visually interesting
façade is paramount in evaluation of the planned 4-story linear building design. Equally
important is the establishment of an architectural relationship between the R-MF and R-TH to
visually unify these two portions of the development in character and scale. Guidance offered in
the Comprehensive Plan speaks to the architectural style for the Midlothian Village as reflective of
thth
late 19 or early 20 century buildings, to include Late Victorian, Colonial Revival and Dutch
Colonial Revival. Design requirements offered in this request, as outlined below, favorably address
these considerations.
Design
High quality residential development addresses the Comprehensive Plan goals for strong and
sustainable neighborhoods that are visually attractive, well-planned and well-maintained.
Further, the purpose and intent of the zoning ordinance to promote the health, safety,
convenience and general welfare of the public includes the creation of convenient, attractive
and harmonious communities, protection against overcrowding of land, and protection of the
natural environment. As such, developments that promote unique, viable and long-lasting
places and enhance the community are encouraged.
617SN0807-2018AUG22-BOS-RPT
The following provides an overview of design requirements offered as part of this request
(Attachments 1 and 2 Proffered Conditions and Textual Statement):
Overall Development Design
Concept Plan depicting general development layout, internal development connectivity,
amenities and relationship among uses (Exhibit A - Attachment 3)
Shared Use Path along Old Otterdale Road, connecting to Midlothian Wood Boulevard
Sidewalks along public roads, connecting to internal uses and Shared Use Path
Pedestrian-scale street and parking lot lighting; decorative lighting along Old Otterdale
Road
Landscaping provisions to include:
Internal public rights of way, as noted in Exhibits C (boulevard entrance) and D
o
(townhouse streets) (Attachments 5 and 6)
Old Otterdale Road roundabout and Midlothian Wood Boulevard connection
o
Stormwater management pond(s) and clubhouse grounds
o
Street trees, to include south line of Old Otterdale Road
o
Foundation plantings
o
Sodded front and corner side yards (townhouse lots)
o
Buffers and setbacks
25-foot buffer adjacent to Midlothian Wood, combined with additional 10 -foot
o
planting strip
85-foot minimum setback for any townhouse from Midlothian Wood (Exhibit B
o
Attachment 4)
6-foot tall durable board fence with evergreens adjacent to Ivymont Shopping
o
Center
Focal points to facilitate outdoor recreation and community interaction at key locations
identified on Exhibit A (Attachment 3). Areas would include enhancements such as
hardscape (no asphalt), landscape and pathways, and located as follows:
Multi-family Courtyard, generally constructed as depicted in Exhibit H
o
(Attachment 11)
Best Management Practices (BMP) located within townhouse section entering
o
from Midlothian Wood Boulevard
Entrance along Old Otterdale Road, connecting to Shared Use Path
o
Other locations at terminal vistas on roadway
o
Alleys in R-TH constructed consistent with Exhibit E (Attachment 7)
Front walks serving R-TH units constructed of brick pavers, concrete or stone. No
exposed aggregate.
Recreational vehicle storage prohibited in R-TH unless within common storage area,
screened from view of public roads and adjacent residential properties
Recreational facilities to include:
Clubhouse (2,500 sf) located on R-TH property, constructed prior to issuance of
o
20 th certificate of occupancy for R-TH units
717SN0807-2018AUG22-BOS-RPT
Community center (2,500 sf), fitness center, pool and outdoor grilling area
o
located on R-MF property, all constructed prior to the issuance of a certificate of
occupancy for 70 completed apartments
Residents of R-TH property provided access to the fitness center, pool and
o
outdoor grilling area located on R-MF property
Screening of utility units (HVAC, generators, etc.)
Architecture
All Buildings (Residential, Recreational and Accessory)
Brick or stone foundations (to include veneer), or stucco block-form poured
o
concrete (painted or color-coordinated); first floor extensions of same material
(ie: chimneys, bay windows)
30-year roofing materials, to include dimensional shingles, slate (natural or
o
synthetic), shake, standing seam, and membrane roofing (for flat roofs behind
parapet); roof pitch and vent treatments
Architectural detailing consistent on front and side street elevations; treatment
o
of building corners and embellishments
Porches and stoop materials, to exclude exposed aggregate concrete; railing
o
materials, to include balconies
Front yard fencing materials and maximum height
o
All Residential Buildings
Building types to include early settlement era architecture, such as Classical
o
Colonial, Georgian, Greek Revival, Victorian or Queen Anne
Building materials, excluding vinyl
o
Open front porches
o
Clear glass on windows and doors on facades visible to street frontage; width of
o
muntins
Shutter treatment; operable or appearance of operable with hinges
o
Townhouse Buildings
Maximum 6 attached units
o
Two (2) or three (3) stories; units south of Midlothian Wood Boulevard closest to
o
Midlothian Wood property line no more than two stories with front entrances
facing Midlothian Wood
Consistent with Exhibit F, depicting Colonial Revival design (Attachment 8)
o
Four-sided architecture to include details and finishes
o
Minimum 25% of exterior facades (aggregate) of masonry, to include 40% on
o
front facades
Finished floors elevated above sidewalks; minimum porch depths
o
Rear loaded garages; garage doors to incorporate windows; two-car garages
o
permitted single doors
Accessory buildings of same architectural style as dwellings; decks not visible
o
from streets
Exterior light fixtures in character to dwelling style
o
Restrictive covenants (county ensures recordation, but not enforcement)
o
817SN0807-2018AUG22-BOS-RPT
Multi-family Buildings
Architectural design and materials consistent with Exhibit G (Attachment 9);
o
designed to minimize overall building scale; promote cohesive residential
character; and compliment neighboring townhouses
Maximum four (4) stories
o
No composite or cementitious siding on first floors
o
Consistent architectural detail visible from all public roads
o
Minimum of two (2) arcade passage ways; configured as depicted on Exhibit A
o
(Attachment 3)
Square deck, porch and entrance columns
o
Brick accent bands extending from building face
o
Non-Residential Buildings
Reference to historic era architecture matching that of residential buildings
As suggested by the Comprehensive Plan goals and the Zoning Ordinance, the proffered
conditions include quality design and architectural elements that would serve to compliment
the surrounding community.
BUDGET & MANAGEMENT
Staff Contact: Natalie Spillman (804-318-8767) spillmann@chesterfield.gov
County finance staff is responsible for managing the finances of the County and making
recommendations to the County Administrator regarding the allocation of available resources
for the provision of services and capital facilities to serve the citizens of the County. Finance
staff will advise the County Administrator if changed economic circumstances require
917SN0807-2018AUG22-BOS-RPT
COUNTY TRANSPORTATION
Staff Contact: Steve Adams (804-748-1037) adamsSt@chesterfield.gov
The applicant has committed to developing a maximum of 160 townhouse units and 275
apartment units (Textual Statement Condition III.A). Based on that number of units and
applying trip generation rates for a townhouse unit and for an apartment unit, the proposed
development could generate approximately 2,400 average daily trips. Traffic generated by
development of the property will initially be distributed via Old Otterdale Road to Midlothian
Turnpike (Route 60), and via an extension of Midlothian Wood Boulevard to Le Gordon Drive.
Old Otterdale Road is a collector with a recommended right of way width of 70 feet, as
identified on the /ƚǒƓƷǤ ŷƚƩƚǒŭŷŅğƩĻ tƌğƓ. Old Otterdale Road is a two-lane road. No recent
traffic volume data is available for Old Otterdale Road.
Route 60 is identified on the /ƚǒƓƷǤ ŷƚƩƚǒŭŷŅğƩĻ tƌğƓ as a major arterial with a recommended
right of way width of 120 to 200 feet. Midlothian Turnpike is a six-lane divided road. In 2015,
the traffic count on Midlothian Turnpike between Route 288 and Winterfield Road was 35,855
Le Gordon Drive is a collector with a recommended right of way width of 60 feet, as identified
on the /ƚǒƓƷǤ ŷƚƩƚǒŭŷŅğƩĻ tƌğƓ. Le Gordon Drive is a two-lane road. In 2015, the traffic count
on Le Gordon Drive south of Midlothian Turnpike was 5,300 vehicles per day (Level of Service
Section 19.1-231 of the County Code outlines the general requirements to meet the needs of
the traffic generated by a proposed development, including acceptable levels of service. This
proposed residential development would contribute to an identifiable need for transportation
improvements. The applicant has offered the following:
Right of Way Dedication. (Proffered Condition 3)
35 feet along Old Otterdale Road for the property frontage.
Vehicular Access. (Proffered Condition 4)
As generally shown on the Master Plan.
Road Improvements. (Proffered Condition 5)
Traffic signalization or traffic signal modifications of the Main Access/Route 60
intersection, if warranted.
Three lane typical section for the Main Access at its intersection with Route 60.
Extension of Midlothian Wood Boulevard to Old Otterdale Road. This improvement
includes construction of a short section of the road from the eastern property to the
current terminus of Midlothian Wood Boulevard.
A roundabout at the Old Otterdale Road/Main Access intersection.
Sidewalk along Midlothian Wood Boulevard from eastern property line to the
Midlothian Wood Way intersection.
1017SN0807-2018AUG22-BOS-RPT
Note: A right of way dedication proffer has been offered for the improvements identified
-
hat the county acquire such right of way
as a public road improvement. All costs associated with the acquisition of the right of
way will be borne by the developer. In the event the county chooses not to assist the
developer in acquisition of the off-site right of way, the developer shall be relieved of
the obligation to acquire the off-site right of way and shall provide the road
improvements within available right of way.(Proffered Condition 5.F)
Improvements - Eastbound Route 60 from Old Otterdale Road to
Ivymont Shopping Center entrance. (Proffered Condition 6)
Reduction in pavement along Route 60. Work to include elimination of the roadside
ditch, closed drainage system, curb and gutter, and regrading.
Street trees
Street lighting, gooseneck style similar to other Village areas
Crosswalks improvements (handicap ramps, signage, markings, etc.) and extension of
raised median at Ivymont Shopping Center entrance.
Midlothian Village gateway signage
Note: Th
Improvements prior to the issuance of the 251 st certificate of occupancy.
Midlothian Wood Boulevard and Construction Traffic. (Proffered Condition 9)
To address resident concerns with construction traffic, the applicant has proffered to
install signage to deter construction traffic from using Midlothian Wood Boulevard to
access the Property. Since Midlothian Wood Boulevard is a public road, this condition
will be difficult to enforce by staff.
The property is within Traffic Shed 3, which encompasses the area of the county south of
Midlothian Turnpike, west of Courthouse Road, north of the Powhite Parkway, and east of
Otterdale Road. Several roads in this part of the county have little or no shoulders, fixed objects
(trees) adjacent to the edge of the pavement and poor vertical and horizontal alignments. The
traffic volume generated from this proposed development will contribute to an identifiable
need for transportation facility improvements to these roads in excess of existing
transportation facility capacity. Roads in this shed or which serve this shed need to be improved
or widened to address safety and accommodate increased traffic, including the increased traffic
from the proposed development.
transportation network through dedication of property, construction of road improvements, or
a cash proffer. If an applicant elects to offer cash to address the
transportation network, Transportation staff has calculated the average impact of a single-
family dwelling unit on the road network to be $12,652; however, the Board of Supervisors has
adopted a policy establishing that it would accept a maximum cash proffer of $9,400 per
dwelling unit as addressing the traffic impacts of residential development, with all of the funds
to be dedicated towards improvements to the transportation network. The Policy allows the
1117SN0807-2018AUG22-BOS-RPT
county to consider mitigating circumstances about a proposed development. In this case, the
residential development is limited to townhouse unitswhich generate approximately 63% of
the traffic of single-family dwelling units, and to apartment unitswhich generate approximately
60% of the traffic of single-family dwelling units. Because of this, the traffic impact of the
proposed develop could be addressed with $5,922 (63% of $9,400) per townhouse unit and
with $5,640 (60% of $9,400) per apartment unit. Mitigating the traffic impact of the proposed
development could be valued at $2,498,520 ($5,922 x 160 townhouse units plus $5,640 x 275
apartment units).
rovements that could be
applied to address traffic impacts in accordance with the Board of Supervisors policy have a
total estimated cost of $1,041,850, which is $1,456,670 less than the anticipated traffic impact
of the proposed development ($2,498,520). In addition, the applicant has proffered to provide
st
th certificate of occupancy,
Staff cannot support the request because the applicant has chosen not to fully address the
and fails to provide road improvements in
a timely manner.
VIRGINIA DEPARTMENT OF TRANSPORTATION
Staff Contact: Jonathan Phillippe (804-674-2560) jonathan.phillippe@vdot.virginia.gov
To date, no comments have been received.
1217SN0807-2018AUG22-BOS-RPT
FIRE AND EMERGENCY MEDICAL SERVICES
Staff Contact: Anthony Batten (804-717-6167) battena@chesterfield.gov
Mission
The mission of Fire and Emergency Medical Services (EMS) is to protect life, property and the
environment through a comprehensive fire and life safety program that ensures an adequate
and timely response to emergencies.
Response Times
The proposed development is located in the urban response zone for which Fire & EMS has a
goal of responding to at least 90% of the calls for service in under seven (7) minutes. Fire and
EMS is currently unable to meet that goal.
Nearby Fire/EMS Facilities
The Midlothian Fire Station, Company Number 5
The Forest View Volunteer Rescue Squad
Anticipated Fire & EMS Impacts/Needs
Based on an average of .175 calls per dwelling, it is estimated that this development will
generate 76 annual calls for Fire/EMS services.
Additional Fire and EMS Comments
A second access will be required for the development.
When the property is developed, the number of hydrants, quantity of water needed for fire
protection, and access requirements will be evaluated during the plans review process.
1317SN0807-2018AUG22-BOS-RPT
SCHOOLS
Staff Contact: Atonja Allen (804-318-8740) atonja_allen@ccpsnet.net
Mission
High performing, high quality public schools contribute to the quality of life and economic
vitality of the County. The comprehensive plan suggests a greater focus should be placed on
linking schools with communities by providing greater access, flexible designs and locations that
better meet the needs of the communities in which they are located.
Capital Improvements
The School Board FY2018 adopted Capital Improvement Plan (CIP) continues to support the
2013 voter approved school revitalization program that will replace or renovate ten schools and
construct one new elementary school to add capacity in the Midlothian area of the county. The
ten existing facilities that are part of the revitalization program are Providence Middle School,
Monacan High School, Manchester Middle School, Beulah Elementary School, Enon Elementary
School, Matoaca Elementary School, Harrowgate Elementary School, Reams Elementary School,
Crestwood Elementary School, and Ettrick Elementary School. The project at Providence
Middle School is currently in construction, a new Manchester Middle School is planned for
construction on the existing school site, and the project at Monacan High School is complete.
Additional information on the CIP can be found in the financial section of the CCPS Adopted
Budget for FY2018.
Anticipated School Impacts
Elementary Middle High Total (1)
Anticipated Student Yield by 77 36 46 159
School Type
Schools Currently Serving Area Watkins Midlothian Midlothian
Current Enrollment 1152 1281 1544
Building Capacity (2) 1175 1975 2075
2016-17
Functional Capacity (3) 999 1376 1957
School Year
Enrollment Percent of Total 115% 93% 79%
Data
Functional Capacity
Total Number of Trailers 15 3 0
Number of Classroom Trailers 14 0 0
Note:
Based upon average number of students per multifamily dwelling unit countywide at 0.33 students per unit, as well as
\[1\]
average number of students per townhouse dwelling unit countywide at 0.41 students per unit.
Building capacity is the number of standard classrooms times the average class size of 25 students.
(2)
Functional capacity considers special programs occurring in the standard classrooms at less than average class size
(3)
Public Facilities Plan
The tǒĬƌźĭ CğĭźƌźƷźĻƭ tƌğƓ recommends a new elementary school be located in the vicinity of Old
Hundred and Otterdale Roads, north of Genito Road and south of Midlothian Turnpike. In
1417SN0807-2018AUG22-BOS-RPT
October 2016 the Board of Supervisors approved Case 17PD0105 for substantial accord to
permit a elementary school located at 1501 Old Hundred Road, and the school division has
acquired this property. Post 2020, the tƌğƓ also recommends a new high school in the vicinity
of Genito and Otterdale Roads northwest of Swift Creek Reservoir, however at this time a
budget has not been developed for the acquisition of land or construction of this school facility
as recommended in the tƌğƓ.
LIBRARIES
Staff Contact: Jennifer Stevens (804-751-4998) stevensj@chesterfield.gov
Mission
The public libr
resource for information and materials, and now serves as a community gathering place for
educational, cultural and informational services; community support during emergencies;
economic development; and revitalization activities.
Nearby Libraries
Midlothian Library
Public Facilities Plan
The tǒĬƌźĭ CğĭźƌźƷźĻƭ tƌğƓ suggests the Midlothian library should be expanded/replaced or a new
facility shall be constructed in the general vicinity at or near current site. Land for expansion or
replacement of this facility has not been acquired.
1517SN0807-2018AUG22-BOS-RPT
PARKS AND RECREATION
Staff Contact: Stuart Connock (804-751-4484) ConnockS@chesterfield.gov
Mission
The County supports a high-quality park system to provide residents and visitors with equitable
access to active and passive recreation opportunities. The 2018 level of service is 7.5 acres of
regional, community and neighborhood parkland per 1,000 persons whereas the target level of
service is 9 acres per 1,000 persons.
Nearby Parks Facilities
Midlothian Mines Park
Watkins Elementary School Annex
Midlothian Middle and High Schools
Gordon Elementary School
Monacan High School
Public Facilities Plan
The tǒĬƌźĭ CğĭźƌźƷźĻƭ tƌğƓ identifies the
need for a community park nearest this location generally
east of Route 288, north of Hull Street and south of Midlothian Turnpike. Land for this park has not
been acquired.
The Bikeways and Trails Chapter of the Comprehensive Plan recommends provision of
pedestrian/bicycle facilities along all routes shown on the Plan and connections from these routes
and existing pedestrian/bicycle facilities to adjacent developments. The Plan shows a route north
of the property.
Recommendation
Pedestrian/bicycle facilities should be provided as recommended in the Bikeways and Trails
Chapter of the Comprehensive Plan. The applicant has offered to address provision of pedestrian
facilities within the community. A bike and pedestrian trail located off Midlothian Turnpike to
meet the needs identified in the Bikeways and Trails Chapter of the Comprehensive Plan has also
provided.
1617SN0807-2018AUG22-BOS-RPT
UTILITIES
Staff Contact: Jamie Bland (804-751-4439) blandj@chesterfield.gov
Water and Wastewater Systems
Currently Size of Existing Connection Required by County
Serviced? Line Code?
Water No 8 Yes
Wastewater No Yes
Additional Utility Comments:
This property is located in the mandatory water and wastewater connection area for residential
development. Connection to the public water and wastewater systems will be required by county
code. The applicant has offered Proffered Condition 2 to connect to public water and sewer.
Public water is immediately available to this property. There are two waterlines that stub to
the property: a 12-
applicant is reminded that per the Chesterfield County Water and Sewer Specifications and
Procedures, residential developments with 25 lots or more shall have two connections to the
public water system where possible. A site plan has recently been approved for 14331
ng Old Otterdale Rd to
the property line. It is intended that this water line be looped through the subject site to
Public wastewater is immediately available to this property. The applicant should design sewer
to make public sewer available to existing residents along Aldengate Rd and Wallingham Dr that
are currently served by individual septic systems.
1717SN0807-2018AUG22-BOS-RPT
1817SN0807-2018AUG22-BOS-RPT
ENVIRONMENTAL ENGINEERING
Staff Contact: Rebeccah Ward (804-748-1028) WardR@chesterfield.gov
Geography
The subject property is generally very flat and consists of approximately 18 acres of forested
wetlands. The majority of the property drains south and southeast into Midlothian Wood. A
large portion of the Midlothian Wood property is wetlands, and regularly floods during
moderate to heavy rain events. Any increased runoff in the area upstream of Midlothian Wood
will result in increased flooding within the community and may impact the residential units and
public safety.
The northeastern corner of the property drains east into existing storm sewer within the Ivymont
Square shopping center. Three drainage easements within the Ivymont Square shopping center
property have been stubbed to the subject property to provide connection of any future storm
sewer. The entire property is located within the James River Watershed.
Environmental Features
A Resource Protection Area Designation (RPAD) must be approved by the Department of
Environmental Engineering - Water Quality Section prior to the submittal of any construction
and/or site plans. Wetlands shall not be impacted without approval from the U.S. Army Corps of
Engineers and/or the Virginia Department of Environmental Quality.
Drainage
Due to existing drainage and flooding problems within the Midlothian Wood property, any
increased runoff upstream of the Midlothian Wood property will result in increased flooding,
which will impact residential units and public safety. Drainage from the development of the
subject property shall be designed such that runoff from buildings, sidewalks, driveways, and other
impervious surfaces is directed away from Midlothian Wood. The applicant has offered Proffered
Condition 7 to address this impact.
Stormwater Management
The property is currently covered by an active State General Construction permit; therefore, the
development is subject to the Part IIC technical criteria of the Virginia Stormwater Management
Program Regulations for both water quality and water quantity until July 1, 2024, unless otherwise
extended by state regulation.
1917SN0807-2018AUG22-BOS-RPT
CASE HISTORY
Applicant Submittals
4/10/17 Application submitted
7/13/17 Proffered conditions and textual statement submitted
8/11/17 Proffered conditions submitted
10/17 & Proffered conditions, textual statement, concept plan and elevations submitted
10/24/17,
1/5, 1/12,
2/6, 2/7,
2/15, 6/13,
& 7/6/18
Community Meetings
6/15/17 Issues Discussed:
Buffer adjacent to Midlothian Wood community
Number of residents in project as well as the potential impact of new
residents on school system and transportation network
Direction and storage of stormwater drainage on the property
Location of stormwater management facilities
Density of project, height of multi-family building, location of three-story
townhomes
Phasing of development, location of recreational amenities, and access
to recreational amenities (trails possible on the property)
11/16/17 Issues Discussed:
Direction and storage of stormwater drainage on the property
Location of stormwater management facilities
Impacts on school system and transportation network
Protection of area wells
Need for one-story housing and affordable housing for younger and
older populations
Cost of townhouses/rental rates for apartments
Proposal changes needed to create sense of place and walkability; less
suburban and more in context of a village
Importance of good architecture
Concerns that Midlothian Village is too heavy on residential
development not achieving a mix of uses
2017SN0807-2018AUG22-BOS-RPT
Community Meetings (Continued)
6/28/18 Meeting to Update Community Leadership
Issues Discussed
Distribution of proposed site traffic using the Midlothian Turnpike and
Midlothian Wood Boulevard accesses
Building materials for apartments and associated maintenance
Road cash proffer and proposed transportation improvements
Diversion of stormwater
Maintenance responsibility for proffered landscaping along Midlothian
Turnpike
Benefits of proposed residential to the Ivymont Shopping Center and
other area businesses
Planning Commission
8/15/17 Action DEFERRED TO SEPTEMBER 19
9/19/17 Action DEFERRED TO NOVEMBER 21
MOTION WITH THE
11/21/17 Action DEFERRED TO FEBRUARY 20, 2018
2/20/18 Action DEFERRED TO MAY 15, 2018
5/15/18 Action DEFERRED TO JULY 17, 2018
7/17/18 Citizen Comments:
Several residents of the adjoining Midlothian Wood development indicated
support for the proposal, commending the applicants for addressing
neighborhood concerns relative to drainage and neighborhood buffers;
providing enhancements to the Village as a destination community; and offering
a project that is preferable to the non-residential uses permitted by the existing
zoning. A neighboring business owner noted the dependence of successful
Village commercial uses on area residential projects.
The applicant noted this proposal offers better and more connected uses than
as currently zoned; is sensitive to neighboring properties; addresses
architectural quality and pedestrian circulation; provides improvements to the
Village gateway; and reduces drainage problems experienced by Midlothian
Wood. The applicant indicated the cost for these drainage and associated
foundation improvements would total approximately $2,753,772, in addition to
the proffered Midlothian Turnpike improvements, valued at $1,456,670.
2117SN0807-2018AUG22-BOS-RPT
Commission Discussion:
Mr. Stariha noted support for the proposed development, but concern for
deviation from the Road Cash Proffer Policy relative to funding for public
improvements other than roads; the precedent this may set; and the absence of
final validation of the estimated drainage costs by staff.
Mrs. Freye confirmed with staff that the proposed residential development
would generate less vehicle trips than the existing commercial/office zoning.
She indicated a comfort that, with no proffered cash payment, the drainage
improvements did not present a conflict with the Policy and provided a benefit
to adjacent homeowners.
Mr. Sloan noted the Policy had been evolutionary since its adoption; that while
he agreed with Mr. Stariha as to a caution for precedent in proffer relief, he
viewed this case as unique given the proposed drainage improvements would
benefit neighbors, represented a significant investment to rectify an ongoing
problem, and had support from area citizens.
Mr. Jones indicated the proposal represented a tremendous benefit to the
Midlothian Wood community, which had relied on Fire Department assistance
several times to open their emergency access due to heavy rains flooding
community streets. He supported the project as very walkable and well-built.
Recommendation APPROVAL AND ACCEPTANCE OF THE PROFFERED
CONDITIONS IN ATTACHMENT 1.
Motion: Jones Second: Freye
AYES: Sloan, Freye and Jones NAY: Stariha ABSENT: Jackson
The Board of Supervisors on Wednesday, August 22, 2018, beginning at 6:00 p.m., will
consider this request.
2217SN0807-2018AUG22-BOS-RPT
ATTACHMENT 1
PROFFERED CONDITIONS
(July 6, 2018)
Note: Both the Planning Commission and Staff recommend acceptance of the following
proffered conditions offered by the applicant.
The property owner and applicant in this case, pursuant to Section 15.2-2298 of the Code of
Virginia (1950 as amended) and the Zoning Ordinance of Chesterfield County, for themselves
and their successors and assigns, proffer that the property under consideration for rezoning
submitted herewith is granted with only those conditions agreed to by the owner and
applicant. In the event this request is denied or approved with conditions not agreed to by the
owner and applicant, the proffers shall immediately be null and void and of no further force or
effect.
1.Master Plan. The Textual Statement dated July 6, 2018, and all referenced exhibits shall
be considered the Master Plan. (P)
2.Utilities. Public water and wastewater service will be used for domestic purposes
throughout the development. (U)
3.Dedication. Prior to any site plan approval or within sixty (60) days from a written
request by the Chesterfield Department of Transportation, whichever occurs first, thirty-
five (35) feet of right-of-way along the south side of Old Otterdale Road, measured from
the centerline of that part of Old Otterdale Road immediately adjacent to the property,
shall be dedicated, free and unrestricted, to and for the benefit of Chesterfield County.
(T)
4.Access. The Property shall have vehicular access as generally shown on the Master Plan.
The exact location shall be approved by the Chesterfield Department of Transportation
(CDOT) and the Virginia Department of Transportation (VDOT) (collectively the
(T)
5.Road Improvements. To the extent approved by the Transportation Department, the
owner/developer shall provide the following road improvements in conjunction with
initial development. The exact design and length of these road improvements shall be
approved by the Transportation Department.
A.Construction of traffic signalization or traffic signal modifications as
required by this development at the Main Access/Midlothian Turnpike
(Route 60) intersection, as determined by the Transportation
Department.
B.Construction of additional pavement along the Main Access at its
intersection with Midlothian Turnpike to provide a three-lane typical
section (i.e., one southbound lane and two northbound lanes).
2317SN0807-2018AUG22-BOS-RPT
C.Connection of Midlothian Wood Boulevard to Old Otterdale Road, as
generally depicted on the Master Plan.
D.A roundabout on Old Otterdale Road/Main Access intersection, as
generally depicted on the Master Plan.
E.Construction of a sidewalk along the northside of Midlothian Wood
Boulevard from the eastern property line to the access (Midlothian Wood
Way) that serves Midlothian Wood.
F.Dedication to Chesterfield County, free and unrestricted, of any
additional right-of-way (or easements) required for the improvements
-
ght-of-way that is necessary for the road improvements described
above, the developer may request, in writing, that the county acquire
such right-of-way as a public road improvement. All costs associated
with the acquisition of the right-of-way shall be borne by the developer.
In the event the county chooses not to assist the developer in acquisition
--of-way, the developer shall be relieved of the
--of-way and shall provide the
road improvements within available right-of-way, as determined by the
Transportation Department. (T)
6. To the extent approved by the
Transportation Department and Planning Department, Applicant shall provide the
following improvements along the east bound lanes of Midlothian Turnpike (Route 60)
from Old Otterdale Road/Main Access intersection to the westernmost Ivymont
Shopping Center Route 60 access, as shown on EXHIBIT I by Timmons Group titled
- Midlothian Tu
The exact design of these road improvements shall be approved by the Transportation
Department, and shall generally include the following:
A.Reduction in pavement along the eastbound lanes of Route 60 from Old
Otterdale Road/Main Access intersection to the westernmost Ivymont Shopping
Center Route 60 access. This work includes, but is not limited to, elimination of
the roadside ditch, associated closed drainage system, curb and gutter and
regrading. At completion of this improvement, Route 60 shall remain with two
(2) eastbound thru lanes and a separate right turn lane into the Ivymont
Shopping Center entrance. (EXHIBIT I, Items A and H)
B.Street trees (EXHIBIT I, Items B and E)
C.Street Lighting, gooseneck style similar to other Village areas (EXHIBIT I, Item C).
D.
E.Crosswalk improvements (handicap ramps, signage, markings, etc.) and
extension of raised median at the westernmost Ivymont Shopping Center Route
60 access. (EXHIBIT I, Items F and G)
2417SN0807-2018AUG22-BOS-RPT
F.Midlothian Village gateway signage along Midlothian Turnpike (Route 60),
location to be determined by Planning Department. Signage easement to
provide maintenance access shall be provided by Applicant if located on
property owned by Applicant, and shall be coordinated with Planning
Department.
st
prior to the issuance of the 251 certificate of occupancy on the Property. (T)
7.Drainage. No drainage resulting from the construction of impervious areas or buildings
on the Property, shall enter Midlothian Wood. (EE)
8.Elevator. Any multifamily residential building located in Area B on the Master Plan shall
contain elevator(s). (BI)
9.Construction Traffic. During the development of the Property, including grading, road
construction, and the construction and completion of the townhouses and multifamily
building, the developer shall take reasonably necessary steps to prohibit construction
vehicles from entering or exiting the Property from Midlothian Wood Boulevard, to
include posting this restriction on the Property. Prior to land disturbance on the
Property, sign(s) shall be installed by the owner/developer at the entrance into and exit
from the development to and from Midlothian Wood Boulevard. Sign(s) shall be posted
at the entrance into and exit from the development to and from Midlothian Wood
Boulevard. If permitted by the Virginia Department of Transportation, a sign will also be
posted in the right of way near the intersection of LeGordon Drive and Midlothian Wood
Boulevard. Such sign(s) shall be maintained by the owner/developer and shall remain
until all construction activity is complete as determined by the Planning Department. (T)
2517SN0807-2018AUG22-BOS-RPT
ATTACHMENT 2
TEXTUAL STATEMENT
(July 6, 2018)
2617SN0807-2018AUG22-BOS-RPT
2717SN0807-2018AUG22-BOS-RPT
2817SN0807-2018AUG22-BOS-RPT
2917SN0807-2018AUG22-BOS-RPT
3017SN0807-2018AUG22-BOS-RPT
3117SN0807-2018AUG22-BOS-RPT
3217SN0807-2018AUG22-BOS-RPT
3317SN0807-2018AUG22-BOS-RPT
3417SN0807-2018AUG22-BOS-RPT
3517SN0807-2018AUG22-BOS-RPT
3617SN0807-2018AUG22-BOS-RPT
3717SN0807-2018AUG22-BOS-RPT
3817SN0807-2018AUG22-BOS-RPT
3917SN0807-2018AUG22-BOS-RPT
4017SN0807-2018AUG22-BOS-RPT
4117SN0807-2018AUG22-BOS-RPT
4217SN0807-2018AUG22-BOS-RPT
ATTACHMENT 3
EXHIBIT A CONCEPT PLAN
4317SN0807-2018AUG22-BOS-RPT
ATTACHMENT 4
EXHIBIT B SECTION PLAN (MIDLOTHIAN WOOD)
4417SN0807-2018AUG22-BOS-RPT
ATTACHMENT 5
EXHIBIT C BOULEVARD STREET SECTION
4517SN0807-2018AUG22-BOS-RPT
ATTACHMENT 6
EXHIBIT D TOWNHOUSE STREET SECTION
4617SN0807-2018AUG22-BOS-RPT
ATTACHMENT 7
EXHIBIT E TOWNHOUSE ALLEY SECTION
4717SN0807-2018AUG22-BOS-RPT
ATTACHMENT 8
EXHIBIT F (1) TOWNHOUSE ELEVATIONS
4817SN0807-2018AUG22-BOS-RPT
ATTACHMENT 9
EXHIBIT F (2) TOWNHOUSE ELEVATIONS
4917SN0807-2018AUG22-BOS-RPT
ATTACHMENT 10
EXHIBIT G MULTIFAMILY ELEVATIONS
5017SN0807-2018AUG22-BOS-RPT
ATTACHMENT 11
EXHIBIT H MULTIFAMILY COURTYARD
5117SN0807-2018AUG22-BOS-RPT
ATTACHMENT 12
EXHIBIT I MIDLOTHIAN TURNPIKE OFFSITE IMPROVEMENTS
5217SN0807-2018AUG22-BOS-RPT