95SN0167
-
-
November 15, 1994 CPC
December 14, 1994 BS
REQUEST ANALYSIS
AND
RECOMMENDATION
95SN0167
Iola T. Osborne
Midlothian Magisterial District
East line of Branchway Road
REOUEST: Rezone from Agricultural (A) to Corporate Office (0-2) with Conditional Use to
permit warehouse use in excess of twenty-five (25) percent of the gross floor area
of the individual tenant office space and to allow the warehouse space within an
office building to be served by more than a single loading door or dock.
PROPOSED LAND USE:
Office and, in conjunction with office, warehouse uses are planned.
PLANNING COMMISSION RECOMMENDATION
RECOMMEND APPROVAL SUBJECT TO THE CONDmON ON PAGE 2 AND
ACCEPTANCE OF PROFFERED CONDmONS ON PAGES 2 AND 3.
STAFF RECOMMENDATION
Recommend approval for the following reasons:
A. While the Northern Area Land Use and Transportation Plan designates the
property for medium density residential use, office and warehouse uses similar
to that which currently exists or is approved in the area would be appropriate
given that the access and orientation of the parcel is to Branchway Road, rather
than Courthouse Road. One of the goals of the Northern Area Plan is to preclude
commercial development along Courthouse Road. Given the property's location,
approval of non-residential use should not establish a precedent for further such
uses to the south since those parcels have frontage on Courthouse Road.
B. The development standards of the Zoning Ordinance and proffered conditions
ensure land use compatibility and quality development.
(NOTE: CONDITIONS MAYBE IMPOSED ON THE CONDITIONAL USE PORTION OF
THE REQUEST OR THE PROPERTY OWNER MAY PROFFER CONDmONS. THE
ONLY CONDITION THAT MAY BE IMPOSED ON THE REZONING IS A BUFFER
CONDITION OR THE PROPERTY OWNER MAY PROFFER CONDmONS. THE
CONDmONS NOTED WITH "STAFF/CPC" WERE AGREED UPON BY BOTH STAPF
AND THE COMMISSION. CONDmONS WITH ONLY A "STAFF" ARE
RECOMMENDED SOLELY BY STAFF. CONDmONS WITH ONLY A "CPC" ARE
ADDITIONAL CONDITIONS RECOMMENDED BY THE PLANNING COMMISSION.)
CONDITION
(STAFF/CPC)
A fifty (50) foot buffer shall be provided along the southern boundary
adjacent to Tax Map 17-13 (1) ParcellS. This buffer shall comply with
Sections 21.1-227 and 21.1-228. (P)
PROFFERED CONDITIONS
(ST AFF/CPC)
(STAFF / CPC)
(STAFF/CPC)
(STAFF /CPC)
(STAFF/CPC)
(STAFF/CPC)
(STAFF/CPC)
(STAFF/CPC)
7.
8.
1.
The public wastewater system shall be used.
2.
All runoff shall be directed to storm water management detention
and/or retention basin(s) which shall be approved by
Environmental Engineering. At a minimum, the fifty (50) year
post-developed runoff shall be stored on-site and released at a ten
(10) year pre-development rate.
3.
With the exception of timbering to remove dead or diseased trees
which has been approved by the Virginia State Department of
Forestry, there shall be no timbering until a land disturbance
permit has been obtained from the Environmental Engineering
Department.
4.
Access shall be limited to Branchway Road.
5.
There shall be no truck deliveries between the hours of 7:00 p.m.
and 7:00 a.m. Trucks shall be defined as any vehicle exceeding
4,000 pounds net weight and two (2) axles.
6.
Solid waste storage areas shall not be serviced between the hours
of 7:00 p.m. and 7:00 a.m.
There shall be no exterior alarm system(s).
All property owners adjacent to the entire property and the last
known President of the Hylton Park Home Owners Association
2
95SN0167/WP/DEC 14L
-
-
-
shall be mailed notice by the owner/developer of site plan
submission to Chesterfield County. Prior to final site plan
approval, the owner/developer shall provide the Planning
Department with evidence of such mailing.
(STAFP/CPC)
9. The architectural treatment, to include materials, color and style
shall be similar to that of buildings located either on Tax Map 17-
13 (1) Parcel 46 or Tax Map 17-13 (1) Parcel 55.
(STAFP/CPC)
10. Warehouse space within each building shall not exceed eighty-five
(85) percent of the gross floor area of the building.
(STAPF / CPC)
11. All warehouse space within office buildings shall be served by no
more than two (2) loading doors or docks.
(STAFF / CPC)
12. The following 0-2 uses shall not be allowed:
Funeral Homes
Homes
Laboratories
GENERAL INFORMATION
Location:
Fronts the east line of Branchway Road, north of Courthouse Road. Tax Map 17-13 (1)
Parcel 14 (Sheet 8).
Existing Zoning:
A
Size:
3.1 Acres
Existing Land Use:
Single- family residential
3
95SNOI67/WP/DEC14L
Adiacent Zoning & Land Use:
North - 0-2; Office
South - A; Single-family residential
East - 0-2 with Conditional Use Planned Development; Office/warehouse
West - A; Vacant
PUBLIC FACILmES
Utilities:
Public Water System
There is a sixteen (16) inch water main along Branchway Road. The use of the public
water system is required by Ordinance. The results of a computer simulated fire flow
test indicate that sufficient flow and pressure should be available to meet the domestic
and fire flow needs of the proposed use. Fire flow requirements are established and
coordinated through Fire Administration.
Public Wastewater System
There is an eight (8) inch wastewater line at the rear northern property line of the request
site, within the adjacent Branchway Office Park. The applicant has proffered a condition
requiring the use of the public system (proffered Condition 1). The results of a
computer simulated hydraulic analysis indicate that sufficient capacity should be available
to accommodate flows for the proposed use.
Environmental:
Drainage and Erosion
Site drains to the east through a recently-constructed Best Management Practice (BMP)
facility and then through tributaries to Pocoshock Creek. The BMP was constructed to
eliminate a water quantity problem downstream. Site constraints and other factors
limited the size of the BMP. So that the now stabilized water quantity problem will not
be further aggravated, all sites between Keithwood Parkway to the southeast and
Southlake Boulevard to the north, and lying east of Courthouse Road, which drain to the
east, must retain run-off on-site at a 50-year/1O-year release rate (Proffered Condition
2). It may be necessary to obtain off-site easements to control run-off.
In order to insure that proper erosion control devices are in place, the applicant has
proffered that there will be no timbering of the property until a land disturbance permit
has been issued. (Proffered Condition 3)
4
95SNOI67/WP/DEC14L
-
-
-
Fire Service:
Midlothian Fire Station, Company Number 5. County water and fire hydrants must be
provided for fire protection purposes in compliance with nationally recognized standards
(I.E. National Fire Protection Association and Insurance Services Office). Fire lanes
must be provided as per the Chesterfield Fire Prevention Code, Section 313.
Transportation:
This request will not limit the development to a specific land use; therefore, it is difficult
to anticipate traffic generation. Based on general office trip rate, development could
generate approximately 480 average trips. These vehicles will be distributed along
Branchway Road which had a 1994 traffic count of 618 vehicles per day.
Development must adhere to the Zoning Ordinance relative to access and internal
circulation (Article 7). The applicant has proffered that access will be limited to
Branchway Road (Proffered Condition 4). Additional pavement, curb and gutter, will
be required along Branchway Road for the entire property frontage. At time of site plan
review, specific recommendations will be provided regarding access, internal circulation
and mitigating road improvements.
LAND USE
General Plan:
Lies within the boundaries of the Northern Area Land Use and Transportation Plan.
which designates the property for residential use of 1.51 to 4.0 units per acre.
Area Development Trends:
Adjacent property to the north and east is zoned Corporate Office (0-2) and has been
developed as Branchway Office Park or incorporated into properties occupied by
businesses, Southport Industrial Park, respectively. Adjacent property to the south and
west is zoned Agricultural (A) and occupied by single-family residences or remains
vacant. It should be noted that the office development to the north has no access directly
to Courthouse Road, but to Branchway Road only.
Historically, the Commission and Board have indicated that non-residential use would be
appropriate along Branchway Road provided that the access is confmed to Branchway
Road. It has been the consensus on past cases along Branchway Road that non-
residential uses would not violate the goal of the adopted Plan which is to preclude
commercialization of the Courthouse Road Corridor. Given that this is the last parcel
on the southern leg of Branchway Road, staff would not support further non-residential
5
95SN0167/WP/DEC14L
zoning to the south since those parcels front Courthouse Road and are clearly designated
on the Plan for residential use.
Site Design:
The request property lies within an Emerging Growth Area. Redevelopment of the site
or new construction must conform to the development standards of the Zoning Ordinance
which address access, parking, landscaping, architectural treatment, setbacks, signs,
buffers, utilities, and screening of dumpsters and loading areas.
The applicant has agreed to notify adjacent property owners and the President of Hylton
Park Homeowners Association of site plan submittal. (proffered Condition 9)
Office/warehouse use is permitted in 0-2 Districts subject to restrictions which limit the
warehouse space to twenty-five (25) percent of the gross floor area of the individual
tenant office space and that such spaces within office buildings be served by a single
loading door or dock. The applicant has requested a Conditional Use to allow
office/warehouses which do not conform to these restrictions. Specifically, the applicant
desires to have warehouse space which does not exceed eighty-five (85) percent of the
gross floor area of the building (proffered Condition 10) and to allow the warehouse
space with each building to be served by no more than two (2) loading doors or docks.
(proffered Condition 11)
Architectural Treatment:
The applicant has proffered architectural treatment similar to that of buildings located on
adjacent property to the north (proffered Condition 9). In addition, within Emerging
Growth Areas, no building exterior which would be visible to any agricultural,
residential, office district or any public right of way may consist of architectural
materials inferior in quality, appearance, or detail to any other exterior of the same
building. There is, however, nothing to preclude the use of different materials on
different building exteriors, but rather, the use of inferior materials on sides which face
adjoining property. No portion of a building constructed of unadorned concrete block
or corrugated and/or sheet metal may be visible from any adjoining agricultural,
residential, or office district or any public right of way. No building exterior may be
constructed of unpainted concrete block or corrugated and/or sheet metal. Mechanical
equipment, whether ground-level or rooftop, must be shielded and screened from public
view and designed to be perceived as an integral part of the building.
Buffers & Screening-:
The Zoning Ordinance requires that solid waste storage areas (Le., dumpsters, garbage
cans, trash compactors, etc.) be screened from view of adjacent property and public
rights of way by a solid fence, wall, dense evergreen plantings or architectural feature
6
95SN0167/WP/DEC14L
-
-
-
and be separated from any residentially zoned property or any property being used for
residential purposes by the principal building. The applicant has proffered that solid
waste storage areas will not be serviced between the hours of 7:00 p.m. and 7:00 a.m.
(proffered Condition 6)
In addition, sites must be designed and buildings oriented so that loading areas are
screened from any property where loading areas are prohibited and from public rights
of way. The applicant has also proffered to restrict the number of loading doors or
docks. (proffered Condition 11)
Adjacent property to the south is zoned Agricultural (A) and occupied by a single family
dwelling. As previously noted, the Northern Area Plan designates the Courthouse Road
Corridor in the immediate vicinity of this request for residential use. Given that this is
the last parcel on the southern leg of Branchway Road which could be developed without
infringing upon the Courthouse Road Corridor, a buffer should be imposed which will
not only protect the adjacent residence but also establish the boundaries of non-residential
development (Condition). While the buffer condition as written, would allow the
Planning Commission to modify the width and requirement under certain circumstances,
the applicant should be made aware that staff will be reluctant to support reduction unless
the Plan is modified or zoning is granted in the future to suggest non-residential use is
appropriate to the south.
Conclusions:
While the Northern Area Land Use and Transportation Plan designates the property for
residential Use of 1.51 to 4.0 units per acre, development of the site for office use,
similar to existing area development, would be appropriate and consistent with past
actions relative to development along Branchway Road. Specifically, it has been the
consensus on past actions along Branchway Road that non-residential use conforms to the
goals of the Plan to preclude non-residential use along Courthouse Road. As noted, the
request property is oriented toward and will have its only access to Branchway Road.
In addition, the development standards of the Zoning Ordinance and proffered conditions
ensure land use compatibility and quality development. Therefore, staff recommends
approval of this request. Staff, however, emphasizes that this is the last parcel on the
southern leg of Branchway Road where the Plan would suggest non-residential use.
CASE HISTORY
Applicant (11/8/94):
The applicant submitted Proffered Condition 12 to eliminate some of the more intense
0-2 uses.
7
95SN0167/WP/DEC14L
Planning Commission Meeting (11/15/94):
The applicant accepted the recommendation. There was no opposition present.
On motion of Mr. Easter, seconded by Mr. Cunningham, the Commission recommended
approval of this request subject to the condition on page 2 and acceptance of the
proffered conditions on pages 2 and 3.
AYES: Unanimous.
The Board of Supervisors on Wednesday, December 14, 1994, beginning at 7:00 p. m., will
take under consideration this request.
8
95SN0167/WP/DEC 14L
-
10· . "'.. ~
ð
; ~
. ... ~--:"')
I..IL
nN
--
--
A
A
95SNOl67
REZ: A TO 0-2//
WITH C.U. ~/
SH. 8
\f\ n