19SN0610
CASE NUMBER: 19SN0610
APPLICANT: Winterpock Solar I, LLC
CHESTERFIELD COUNTY, VIRGINIA
MATOACA DISTRICT
AND RECOMMENDATION
Board of Supervisors (BOS) Public Hearing:
OCTOBER 23, 2019
BOS Time Remaining:
365 DAYS
HALEY LARABEE (828-385-4943)
Planning Department Case Manager:
329.3 Acres 13341 & 13611 Eppes Falls Rd,
JANE PETERSON (804-748-1045)
16301 & 16521 River Falls Rd
REQUEST
Conditional Use to permit a large scale solar energy facility in an Agricultural (A) District.
Notes:
A.Conditions may be imposed or the property owner may proffer conditions.
B.Proffered conditions, Exhibits, and adopted Solar Ordinance are located in Attachments 1 - 4.
SUMMARY
A 20 MW large scale solar energy facility is proposed, requiring approval of a Conditional Use in an
Agricultural (A) District. A recent ordinance amendment establishes specific standards for solar
energy facilities that address: general layout, location, access, anticipated locations of
transmission lines, facility decommissioning, certifications of state and federal approvals,
construction activities limits, setbacks, buffers, health and safety, and facility operation and design.
The proposed uses will comply with, or exceed, these Zoning Ordinance standards. A conceptual
plan identifies the general location of the use. (Exhibit A)
RECOMMENDATIONS
PLANNING APPROVAL
COMMISION
APPROVAL
Proposal complies with Plan relative to land use, transition and parcel
STAFF
aggregation
As conditioned, impacts on area residential uses minimized
Providing a FIRST CHOICE community through excellence in public service
219SN0610-2019OCT23-BOS-RPT
TABLE A
REQUEST PROPERTIES
Tax Identification Number Address
706-639-Part of 7211 13611 EPPES FALLS RD
707-639-Part of 6747 13341 EPPES FALLS RD
710-640-Part of 4102 16521 RIVER RD
711-642-Part of 0774 16301 RIVER RD
319SN0610-2019OCT23-BOS-RPT
Comprehensive Plan
Classification: RURAL RESIDENTIAL AGRICULTURAL
The designation suggests the property is appropriate for single family dwellings located either on a
minimum of 5 acres, 1 acre (family division), or less than 5 acres (if created before the 5 acre
requirement); and farming uses.
Surrounding Land Uses and Development
River Rd.
Vacant/
Agricultural
Eppes Falls Rd.
Single family residential
Single family
residential
Vacant/
Agricultural
419SN0610-2019OCT23-BOS-RPT
PLANNING
Staff Contact: Jane Peterson (804-748-1045) petersonj@chesterfield.gov
Proposal
A 20 MW large scale solar energy facility is proposed. This use requires approval of a
Conditional Use in an Agricultural (A) District. Development of the property will generally
conform to the Conceptual Plan (Exhibit A).
The recently adopted Zoning Ordinance for large scale solar energy facilities (Zoning Ordinance
Attachment 3) includes regulations that address: general layout, location, access, anticipated
locations of transmission lines, facility decommissioning, certifications of state and federal
approvals, construction activity limits, setbacks, buffers, health and safety, and facility
operation and design. Development of the site would comply with these adopted standards,
except where proffered conditions are more restrictive.
In addition to Ordinance regulations, proffered conditions provide for the following:
General Overview
Requirements Details
Ordinance 150 feet from residentially zoned or occupied
properties
Setbacks
Proffer 200 feet from eastern property boundaries of adjacent
parcels fronting Eppes Falls Road, as noted on Conceptual Plan
/ƚƓĭĻƦƷǒğƌ tƌğƓ ε tƩƚŅŅĻƩĻķ /ƚƓķźƷźƚƓ Њ
Ordinance Not addressed outside of operational area
setbacks/buffers
Proffer Provided along north and south lines of site access
Preservation of
from Eppes Falls Road.Access driveway relocated to provide
Existing Vegetation
separation from northern property boundary.
Replanting of
existing private road access per landscape plan (Exhibit B).
/ƚƓĭĻƦƷǒğƌ tƌğƓ ε tƩƚŅŅĻƩĻķ /ƚƓķźƷźƚƓƭ Њ ε Џ
Ordinance Permitted Monday through Saturday from 9:00 a.m.
to 5:00 p.m.
Construction Activity
Proffer No Saturday activity on portion of request property
(Pile Driving)
adjacent to parcels fronting Eppes Falls Road
tƩƚŅŅĻƩĻķ /ƚƓķźƷźƚƓ Ў
Proffer In addition to fencing around operational area, gate installed
Gate to preclude
beyond entrance from Eppes Falls Road to deter use of driveway by
trespassing
others.
/ƚƓĭĻƦƷǒğƌ tƌğƓ ε tƩƚŅŅĻƩĻķ /ƚƓķźƷźƚƓ Њ
519SN0610-2019OCT23-BOS-RPT
Comprehensive Plan
The request property is located within an area suggested by the Plan for Rural
Residential/Agricultural uses, appropriate for single-family dwellings on a minimum of one (1)
to five (5) acres, farming and forestry, open space and conservation easements.
The Plan also includes general land use guidelines to address specific development and land use
issues. One such guideline includes the promotion of agricultural-related activities through the
consideration of non-residential land uses in Rural Residential/Agricultural areas. These include
the development of solar facilities through the conditional use process to protect adjacent
properties, the rural character and future potential land uses in these areas.
As proposed, the anticipated land use, buffering and setbacks provide an appropriate transition
to neighboring residential uses. As such, staff is supportive of this request.
COUNTY TRANSPORTATION
Staff Contact: Steve Adams (804-748-1037) adamst@chesterfield.gov
The applicant is requesting a conditional use permit for a large-scale solar energy facility on the
property (329.3 acres). Trip generation rates are not available for this use; however, it is
anticipated to be minimal. Traffic generated by the proposal would be distributed to River
Road.
Thoroughfare Plan as a major arterial with a
recommended right of way width of 90 feet. River Road is a two-lane road (18 to 20-foot
pavement width) with minimal to no usable shoulders and substandard horizontal and vertical
curves. VDOT minimum geometric design standards recommend this road have 12-foot lane
widths and 10-foot shoulders. In 2018, the Virginia Department of Transportation (VDOT) traffic
count on River Road, adjacent to the property, was 660 vehicles per day (Level-of-Service A).
Section 19.1-231 of the County Code outlines the general requirements to meet the needs of
the traffic generated by a proposed development, including acceptable levels of service. The
applicant has offered the following:
Right of Way Dedications (Proffered Condition 2):
45 foot right of way dedication along River Road property frontage
30 foot right of way dedication along Eppes Falls Road property frontage
Vehicular Access (Proffered Condition 3):
One (1) direct access to River Road
One (1) direct access to Eppes Falls Road
619SN0610-2019OCT23-BOS-RPT
The Thoroughfare Plan ide
bisecting the property with a recommended right of way width of 200 feet. When requested,
the applicant chose not to address the East/West Freeway as part of this application.
VIRGINIA DEPARTMENT OF TRANSPORTATION
Staff Contact: Willie Gordon (804-674-2907) willie.gordon@vdot.virginia.gov
The applicant will need to submit traffic projections for the intended use of the site to
determine the applicable entrance standards for these two sites. VDOT recommends that the
FIRE AND EMERGENCY MEDICAL SERVICES
Staff Contact: Anthony Batten (804-717-6167) battena@chesterfield.gov
When the property is developed, the number of hydrants, quantity of water needed for fire
protection, and access requirements will be evaluated during the plans review process.
Nearby Fire and Emergency Medical Service (EMS) Facilities
Fire Station The Winterpock Fire Station, Company Number 19
EMS Facility The Winterpock Fire Station, Company Number 19
When the property is developed, the number of hydrants, quantity of water needed for fire
protection, and access requirements will be evaluated during the plans review process.
ENVIRONMENTAL ENGINEERING
Staff Contact: Rebeccah Ward (804-748-1028) wardr@chesterfield.gov
Geography
The subject properties all drain to Winterpock Creek, either directly or through an unnamed
tributary to Winterpock Creek. Winterpock Creek traverses the project site, draining from
northwest to southeast, and then to Lake Chesdin. All of the subject properties are located within
the Appomattox River Watershed.
Natural Resources
A Resource Protection Area (RPA) Designation has been submitted to and confirmed by the
Department of Environmental Engineering Water Quality Section. RPA exists along the wetlands
and floodplains of Winterpock Creek, as well as along the unnamed tributary to Winterpock Creek
on the western portion of the property located at 13341 Eppes Falls Road. A Water Quality Impact
Assessment must be submitted to and approved by the Department of Environmental Engineering
and/or the Board of Supervisors for any improvements which encroach into the RPA.
719SN0610-2019OCT23-BOS-RPT
There are areas of wetlands within the drainage ways located on the properties, as well as
along Winterpock Creek and its tributaries. Wetlands and/or streams shall not be impacted
without approval from the U.S. Army Corps of Engineers and/or the Virginia Department of
Environmental Quality. Additionally, FEMA floodplain exists on the properties along Winterpock
Creek and the unnamed tributary to Winterpock Creek. No solar panels or other associated
equipment will be placed within the FEMA floodplain.
The subject properties are located within an area identified on historic maps as the Rowlett Mine.
In addition, review of the Virginia Department of Mines, Minerals, and Energy mapping for the
subject properties identified the presence of two potential vertical openings, one on the property
located at 13341 Eppes Falls Road and another located on a private property to the north. The
vertical openings are primarily located within the limits of the on-site RPA and floodplain;
however, due to unknown locations of any potential very old mines, air shafts and vents in the
general area, the developer will be required to submit a geotechnical report prior to site plan
approval for any on-site areas identified as potential mining areas. The geotechnical report will,
through the use of borings and other techniques, locate potential mine shafts, air vents,
exploratory pits, etc. in the areas where potential mining may have occurred on the properties.
The report will also make recommendations based on the findings as to reclamation, setbacks of
solar panels, roads, or other types of use needed to address any health, safety and welfare issues.
The applicant has offered Proffered Condition 7 to address this impact.
Erosion and Sediment Control
Steep slopes greater than 20 percent are difficult to stabilize when disturbed. The steep slopes on
the subject properties border the onsite tributaries; therefore, disturbance of these slopes will
result in the increased potential for sediment to impact the streams if erosion occurs. These steep
slopes should remain in their natural, undisturbed state to the maximum extent practicable, unless
otherwise approved by the Department of Environmental Engineering. The applicant has offered
Proffered Condition 4 to address this impact.
Stormwater Management
The development of the subject properties will be subject to the Part IIB technical criteria of the
Virginia Stormwater Management Program Regulations for water quality and quantity.
819SN0610-2019OCT23-BOS-RPT
UTILITIES
Staff Contact: Matt Rembold (804-716-7616) remboldm@chesterfield.gov
Water and Wastewater Systems
Currently Size of Existing Line Connection Required by County Code?
Serviced?
Water No N/A No
Wastewater No N/A No
Additional Information:
This property is located outside of the mandatory water and wastewater connection areas for new
non-residential structures. The applicant has indicated the use of private wells with their
equest will have minimal impact on the utilities
department.
The Utilities Department supports this case.
919SN0610-2019OCT23-BOS-RPT
CASE HISTORY
Applicant Submittals
3/14/19 Application submitted
6/11 & 8/5/19 Application amended
5/28, 6/11, 6/19, Proffered conditions, zoning site plan and landscape plan submitted
7/11, 7/12, 7/18,
8/5, 9/5, 9/9, 9/16 &
9/17/19
Community Meeting
7/23/19 Issues Discussed:
Company history and project financing
Studies regarding property value, environmental and archeological
impacts
Consideration of alternative locations; question of benefit to neighboring
community
Site security (fencing), and monitoring and routine maintenance of facility
Height of panels
Expanded property owner notification for future meetings/hearings
Construction, operation and maintenance access
Preclusion of construction activity on Sundays
Removal of row of solar panels closest to neighbors on Eppes Falls Road
Planning Commission
9/17/19 Citizen Comments:
Several citizens spoke in opposition and support to the request.
Those in opposition noted concerns relative to:
Safety of solar panel materials and potential contamination of area
water resources (wells and reservoir) in event of breakage/leakage
Limited appraisal data relative to impacts of use on area property
values
Lack of similarity with Agricultural uses; solar farms better suited for
industrial areas
History of area mining activity and impacts on site stability
Those in support noted:
Low impacts of use on area residential and historic properties
(Eppington)
Need for renewable energy
Better land use alternative
Applicants responsiveness to neighboring property owners concerns
1019SN0610-2019OCT23-BOS-RPT
Planning Commission (Continued)
9/17/19 Applicants Comments:
76 of 329 acres within buffer/setbacks
Hosted community meeting, subject site and local solar farm visits
Responded to community concerns by removing panels closest to River
Road; providing larger setbacks from neighboring Eppes Falls Road
properties and replanting old logging road access; and proffering
geotechnical study to address mining activity
Property value studies indicate no negative impacts
Use presents low environmental, traffic and noise impacts
Agricultural areas appropriate for use larger parcels, more buffering,
preserves industrial property
Commission Discussion:
In response to questions of the Commission, staff addressed limits on
residential parcel divisions for the site; identification of one vertical on-site
mine opening located within floodplain; requirements for detailed
geotechnical investigation and Department of Mines, Minerals and Energy
(DMME) permitting; and requirements for a traffic management plan to
address construction impacts on roads.
In response to questions of the Commission, the applicant reviewed the
benefits of using agricultural properties for solar facilities and appraisal studies
resulting in no impact on property values due to proximity to solar farm.
Mr. Stariha noted positive changes made to case as a result of citizen
engagement.
Action APPROVAL AND ACCEPTANCE OF THE PROFFERED CONDITIONS IN
ATTACHMENT 1.
Motion: Stariha Second: Stariha
AYES: Jackson, Freye, Jones, Sloan, Stariha
The Board of Supervisors on Wednesday, October 23, 2019, beginning at 6:00 p.m., will
consider this request.
1119SN0610-2019OCT23-BOS-RPT
ATTACHMENT 1
PROFFERED CONDITIONS
September 17, 2019
Note: Both the Planning Commission and staff recommend acceptance of the following proffered
conditions, as offered by the applicant.
Conceptual Plan.
1.
Power
revised 9/10/2019 shall be considered the Conceptual Plan for the proposed
development. Development of the Property shall conform generally to the
Conceptual Plan. (P)
Right of Way. The following rights-of-way shall be dedicated, free and unrestricted,
2.
to and for the benefit of Chesterfield County, prior to any site plan approval:
Forty-five (45) feet of right-of-way on the south side of River Road along the
a.
Road measured from the centerline of River
Road.
Thirty (30) feet of right-of-way east side of Eppes Falls Road, measured from
b.
rontage with Eppes
Falls Road. (T)
Access. Direct vehicular access from the property to River Road and Eppes Falls
3.
Road shall be limited to one (1) entrance/exit on each roadway. (T)
Steep Slopes. Steep slopes equal to or greater than 20 percent shall remain in their
4.
natural, undisturbed state to the maximum extent practicable, unless otherwise
approved by the Department of Environmental Engineering. In locations where the
disturbance of slopes greater than 20 percent is unavoidable, enhanced erosion and
sediment control measures, such as super silt fence (or alternative as approved by the
Department of Environmental Engineering) and the application of anionic PAM to
denuded areas during construction and final stabilization, will be provided as directed
by the Department of Environmental Engineering at the time of site plan review. The
Department of Environmental Engineering shall approve the exact design and
implementation of these standards. (EE)
Pile Driving. During construction of the solar facility, pile driving activities on the
5.
property west of Tax Map Parcel number 706-639-7211 shall be limited to
Monday through Friday from 9:00 AM to 5:00 PM. (P)
Eppes Falls Road (Private Access Road). The existing private access road from
6.
Eppes Falls Road shall be relocated as shown on the Conceptual Plan. Landscaping
as depicted in plan prepared by Balzer & Associates, dated September 17, 2019
(Exhibit B) shall be installed within areas occupied by the existing private access
road located in the northern fifty (50) setback adjacent to Tax ID 705-638-0456.
(P)
Geotechnical Report. A geotechnical engineering report will be submitted to the
7.
Department of Environmental Engineering prior to site plan approval, for any
1219SN0610-2019OCT23-BOS-RPT
potential historic mining areas identified within the solar project area. The
geotechnical report will, through the use of borings and other techniques, locate
potential mine shafts, air vents, exploratory pits, etc. in the areas where potential
mining may have occurred on the properties. (EE)
1319SN0610-2019OCT23-BOS-RPT
ATTACHMENT 2
EXHIBIT A: CONCEPTUAL PLAN
(Last Revised 9/10/19)
1419SN0610-2019OCT23-BOS-RPT
1519SN0610-2019OCT23-BOS-RPT
1619SN0610-2019OCT23-BOS-RPT
1719SN0610-2019OCT23-BOS-RPT
1819SN0610-2019OCT23-BOS-RPT
1919SN0610-2019OCT23-BOS-RPT
2019SN0610-2019OCT23-BOS-RPT
2119SN0610-2019OCT23-BOS-RPT
ATTACHMENT 3
EXHIBIT B: LANDSCAPE PLAN
September 17, 2019
2219SN0610-2019OCT23-BOS-RPT
ATTACHMENT 3
EXHIBIT C: ZONING ORDINANCE
Sec. 19.1-52. Uses Generally.
OOO
D. Special Limitations for Specific Uses
. The following uses shall be subject to the
limitations as specified:
OOO
Solar energy facility, large scale.
4.Unless modified or otherwise conditioned by the
Board of Supervisors at time of zoning approval, large scale solar energy facilities
shall be subject to the following limitations and requirements:
a. Project description. In addition to other application requirements, application for
a facility must include project overview in textual form that includes estimated
completion date and operational lifespan of facility, approximate rated capacity of
solar energy system, specified types of solar equipment to be placed on site and
description of any supplementary structures or uses.
b. General plan. General layout plan shall be provided with application. The plan
shall include, at a minimum, location, access points, anticipated location of
transmission lines and other utility connections, general location of solar
equipment and supplementary facilities to be placed on site, buffers and other
items required for zoning applications layout plans. If facility development is to
be phased, a general phasing plan should also be included.
c. Decommissioning plan. A decommissioning plan shall be submitted for review
with initial site plan. A decommissioning plan shall include the following:
Contact information for the party responsible for site decommissioning;
Timeline for, and written description of, decommissioning procedures which
shall include, but not be limited to, removal of any above and below ground
tanks, cables, fencing, debris, buildings, structures or equipment, to include
foundations and pads, related to the facility and the restoration of solar facility
land and related disturbed areas to a natural condition or other approved state.
At time of zoning approval, the Board of Supervisors may approve and
condition a request by an applicant to have certain items intended to be
utilized to serve a permitted use on the site, to remain provided site plan
approval is obtained;
abilization of soil to a depth
of 3 feet and restoration of site vegetation and topography to pre-existing
condition, provided that the exact method and final site restoration plan shall
be subject to site plan review giving, among other things, consideration to
impacts upon future site use, environmental and adjacent property impacts.
The director of planning may approve a request by the landowner for
2319SN0610-2019OCT23-BOS-RPT
alternatives to site restoration to allow roads, pads or other items which will
serve a future permitted site use to remain. Where applicable, if the director of
planning determines that a restoration plan significantly deviates from the
description and conditions approved by the Board such plan shall require
amendment of conditions through the zoning process;
A detailed estimate of the cost of decommissioning, which may include net
salvage value of such equipment, facilities or devices, and site restoration or,
if approved by Board of Supervisors, future site development. If
decommissioning is phased then such costs shall be so described and
calculated to match phased plan. An estimate shall be prepared by an
engineer licensed in the state of Virginia, having expertise in the removal of
solar facilities and site restoration as applicable to request;
Decommissioning plan, accompanying estimates and surety shall be updated
every five years and provided to the director of planning; and
Landowner, applicant or facility owner shall provide the county with a surety,
acceptable to the director of planning, equal to the estimated costs of the
decommissioning and site restoration or redevelopment as applicable. Any
such surety shall be provided prior to site plan approval for the facility and
shall include the ability for automatic adjustment for inflation or as necessary
based upon decommissioning and/or restoration plan update.
d. Airport and Federal Aviation Administration (FAA) approval. Prior to site plan
approval, applicant shall demonstrate compliance with glint and glare standards of
the FAA and approval from and the FAA.
e. Construction and decommissioning activity. Except as provided herein, all
construction and decommissioning activity shall be limited to the hours of 7 AM
to 7 PM Monday through Saturday. Pile driving activity will be further limited to
the hours of 9 AM to 5 PM Monday through Saturday. On Sunday, construction
and decommissioning activity will be limited to the hours of 9 AM and 5 PM, and
further restricted only to light construction or decommissioning activity that does
not include pile driving, use of heavy equipment or any other activity that exceeds
60 dBA as measured at property line with any adjacent property not part of
facility.
f. Traffic management plan. When determined by the directors of planning and
transportation that construction or decommissioning activity for the site creates a
significant traffic or safety impact upon or damage to area roads or properties, a
traffic management plan shall be provided at time of site plan review, which shall
include a reasonable road maintenance plan if appropriate under the
circumstances.
2419SN0610-2019OCT23-BOS-RPT
g. Setbacks, buffers and screening.
The solar facility operational area, to include any buildings, structures,
equipment, parking and disturbed areas, shall be setback a minimum 150 feet
from any residentially zoned or occupied property, 100 feet from any road or
right-of-way shown on the Thoroughfare Plan, and 50 feet from any other
road or property;
Except where adjacent to electric power facility producing electricity for
others or residentially zoned or occupied property, a buffer shall be provided
equal to the required setback. Adjacent to residentially zoned or occupied
property, the buffer shall be 100 feet in width. Each buffer shall comply with
requirements of Perimeter Landscaping C and the requirements of buffers in
this chapter; and
Excluding solar panel arrays, facility outdoor equipment or storage shall be
screened unless determined through site plan review that provided buffer is
sufficient to mitigate view from adjacent property or road.
h. Access. Access to the property shall be provided for Chesterfield County Fire
Department, and where necessary Environmental Engineering, in a manner
satisfactory to each department as determined at time of plan review.
i. Facility operation and design.
Facility design, construction and installation shall conform to applicable
industry standards, including those of the American National Standards
Institute (ANSI), Underwriters Laboratories (UL), the American Society for
Testing and Materials (ASTM), or other similar certifying organizations, and
shall comply with the Uniform Statewide Building Code and with all other
applicable fire and life safety requirements. The type, and manufacturer
specifications of, solar panels shall be submitted for review and approval as
part of the site plan application and may be modified through request to, and
approval, by the director of planning;
Prior to start of electricity transmission, documentation shall be provided to
the director of planning verifying interconnection agreement or similar
agreement with the applicable public utility pursuant to a Power Purchase
Agreement (PPA) or other off-taker as permitted by state law or the State
Corporation Commission, and notification of when electricity transmission is
to begin. The director of planning shall be notified certified mail within 30
days of cessation of such agreement. Where such power distribution is
permitted by law, agreements for power distribution which do not require a
PPA shall also comply with the above documentation and notification;
2519SN0610-2019OCT23-BOS-RPT
Generation of power shall be limited to photovoltaic panels, provided that any
on-site buildings may utilize integrated photovoltaic building materials;
Solvents necessary for the cleaning of solar panels shall be biodegradable;
Wiring, excluding that which is on a solar array, shall be located underground
except where necessary to directly connect to public service corporation;
Solar panels shall be placed so as to prevent concentrated solar radiation, heat
or glare being directed onto other properties or roads;
Onsite lighting shall be the minimum necessary for security or onsite
maintenance and shall comply with Sec. 19.1-205;
Solar equipment shall not be utilized to provide advertising or function as
signs;
Except for initial construction or decommissioning activity, maintenance
periods or emergency conditions which require temporary use of onsite
generator, noise generated by the facility shall not exceed 60 dBA as
measured at property line with any adjacent property not part of facility; and
Facility owner shall develop a maintenance inspection agreement with the
county to provide for inspection of facility and panels.
j. Height. Excluding transmission utility poles serving the site, no buildings,
structures, solar panel arrays or other equipment utilized on the site shall exceed
25 feet in height. The director of planning may approve the permitted height to be
exceeded where due to terrain, screening or other mitigation visibility of a
structure is minimized;
k. Transmission lines. Except for lines that are solely subject to State Corporation
Commission jurisdiction, and where necessary for lines to directly connect to
existing transmission lines, new transmission lines are subject to site plan review
and shall not be located above ground. The director of planning may approve use
of above ground transmission lines where determined during plan review that
such action would mitigate impact upon protected environmental features or there
exist other site-specific features where underground placement of lines is not
feasible.
l. Health and safety. Security fencing shall be provided for areas of facility
operation a minimum of 6 feet in height, having barbed wire or similar along top
and providing secured gates. Alternative method of security may be approved at
time of site plan approval where demonstrated that such method meets or exceeds
intended security of fencing.
m. Change of facility owner. The director of planning shall be notified by certified
mail of any change in ownership and, if different, party responsible for
decommissioning of facility within 60 days of such change.
2619SN0610-2019OCT23-BOS-RPT
n. Decommission, abandonment and maintenance compliance.
Planning shall be notified by certified mail 30 days prior to the intended
decommissioning of a solar facility;
Damaged or unusable panels or arrays shall be removed from site within 60
days of removal from service;
A solar facility, or any portion thereof, shall be considered abandoned where
not utilized for the generation and distribution of electricity for a continuous
period of six months. The director of planning may extend such time period
where evidence is provided by the facility owner or operator demonstrating
that the failure to utilize the facility for power generation is beyond the
reasonable control of owner or operator, the facility is operationally capable of
generation and has not been abandoned; and
Decommissioning procedures shall be completed within 1 year of
decommissioning notice, abandonment of a solar facility, or a shorter time
period where in writing building official or other county official determines
the facility or some aspect thereof to be unsafe. If facility owner fails to meet
decommissioning requirements or comply with a request for removal or
repair, the county may at its option:
remove and salvage facility equipment and structures and perform related
o
restoration using provided surety. If the decommissioning surety and
salvage recompense is insufficient, the county shall have the right to
recover such costs from facility owner to include legal fees, expenses and
fines; or
pursue legal recourse to have the solar facility, or portion thereof as
o
its costs, legal fees and legal expenses incurred to have the facility
decommissioned in compliance with approved plan.