07SN0346
July 17,2007 CPC
August 22,2007 BS
STAFF'S
REQUEST ANALYSIS
AND
RECOMMENDA TION
07SN0346
New Cingular Wireless PCS, LLC
Bermuda Magisterial District
North line of Ruffin Mill Road
REQUEST: Conditional Use to permit a communications tower in General Business (C-5) and
General Industrial (1-2) Districts.
PROPOSED LAND USE:
A 195- foot communications tower with accessory equipment is planned.
PLANNING COMMISSION RECOMMENDATION
RECOMMEND APPROVAL SUBJECT TO THE CONDITIONS ON PAGE 2.
AYES: MESSRS. GECKER, GULLEY, BASS AND WILSON.
ABSENT: MR. LITTON.
STAFF RECOMMENDATION
Recommend approval for the following reasons:
A. The proposal conforms to the Public Facilities Plan and Tower Siting Policy.
B. The Ordinance minimizes the possibility of any adverse impact on the County
Communications System or the County Airport.
(NOTE: CONDITIONS MAY BE IMPOSED OR THE PROPERTY OWNER(S) MAY
PROFFER CONDITIONS. THE CONDITIONS NOTED WITH "STAFF/CPC" WERE
AGREED UPON BY BOTH STAFF AND THE COMMISSION. CONDITIONS WITH ONLY
A "STAFF" ARE RECOMMENDED SOLELY BY STAFF. CONDITIONS WITH ONLY A
Providing a FIRST CHOICE community through excellence in public service
"CPC" ARE ADDITIONAL CONDITIONS RECOMMENDED BY THE PLANNING
COMMISSION.)
CONDITIONS
(STAFF/CPC)
(STAFF/CPC)
(STAFF/CPC)
(STAFF/CPC)
Location:
1.
There shall be no signs permitted to identify this use. (P)
2.
The base of the tower shall be enclosed by a minimum six (6) foot
high fence, designed to preclude trespassing. The fence shall be
placed so as to provide sufficient room between the fence and the
property line to accommodate evergreen plantings having an initial
height and spacing to provide screening of the base of the tower
and accessory ground-mounted equipment or structures from
adjacent properties. A detailed plan depicting these requirements
shall be submitted to the Planning Department for approval in
conjunction with final site plan review. (P)
3.
The color and lighting system for the tower shall be as follows:
a. The tower shall be gray or another neutral color, acceptable
to the Planning Department.
b. The tower shall not be lighted.
c. The tower shall be a monopole structure (P)
4.
At such time that the tower ceases to be used for communications
purposes for a period exceeding twelve (12) consecutive months,
the owner/developer shall dismantle and remove the tower and all
associated equipment from the property. (P)
GENERAL INFORMATION
North line of Ruffin Mill Road, east of Route 95. Tax IDs 805-638-Part of 7523; 806-638-
Part of 0723; and 806-640-Part of 0310.
Existing Zoning:
C-5 and 1-2
Size:
12.5 acres
2
07SN0346-AUG22-CPC
Existing Land Use:
Commercial and vacant
Adiacent Zoning and Land Use:
North - 1-2; Vacant
South - 1-2 and C-5; Commercial, industrial or vacant
East - I-I Industrial or vacant
West - C-5; Commercial or vacant
UTILITIES: PUBLIC FACILITIES: AND TRANSPORTATION
This use will have no impact on these facilities.
ENVIRONMENT AL
Drainage and Erosion:
In the construction of the proposed communications tower, if more than 2500 square feet
of land is disturbed, a land disturbance permit must be obtained from the Department of
Environmental Engineering.
COUNTY COMMUNICATIONS
The Zoning Ordinance requires that any structure over eighty (80) feet in height be reviewed by
the County's Public Safety Review Team for potential detrimental impacts the structure could
have on the County's Radio Communications System microwave paths. This determination
must be made prior to construction of the communications tower.
COUNTY AIRPORT
A preliminary review of this proposal indicates that, given the approximate location and
elevation of the proposed installation, there will be no adverse affect on the County Airport.
LAND USE
Comprehensive Plan:
Lies within the boundaries of the Consolidated Eastern Area Plan which suggests the
property is appropriate for general commercial use.
The Public Facilities Plan, an element of the Comprehensive Plan, suggests that
communications towers should be located so as to minimize impacts on existing and
future areas of development and to minimize locations adjacent to planned or existing
residential development. Further, the Public Facilities Plan provides that
3
07SN0346-AUG22-CPC
communications towers should be located and designed to be compatible with the
character of the area.
Area Development Trends:
Surrounding properties are zoned General Commercial (C- 5), Light Industrial (I-I) and
General Industrial (1-2) are occupied by commercial and industrial uses or are vacant. It is
anticipated that commercial uses will continue in the area as suggested by the Plan.
Use:
Communications towers are allowed as a restricted use in General Commercial (C-5) and
General Industrial (1-2) Districts provided, among other restrictions the tower is
collocated on an electrical transmission structure. If these restrictions cannot be met,
then the use may be allowed through the Conditional Use process. In this instance, a
freestanding tower is proposed.
Site Development:
The request property lies within an Emerging Growth Area. The Zoning Ordinance
specifically addresses access, landscaping, architectural treatment, setback:s, buffers,
park:ing, signs, utilities and screening. The purpose of the Emerging Growth District
standards is to promote high quality, well-designed projects. Development of the request
property will be subject to these standards except as conditioned herein.
The Conditional Use process provides a means of addressing ways to minimize the
possibility of any adverse impact of a tower on existing and planned areas of
development. The Tower Siting Policy suggests, where towers are to be located in the
vicinity of existing or planned areas of development, the tower should be located as
remotely as possible from these areas.
The applicant proposes to erect a 195 foot communications tower. Consistent with past
actions on similar facilities, the base of the tower should be secured with a fence to
discourage trespassing and evergreen plantings should be installed to minimize views of
the tower base and associated equipment (Condition 2). In addition, to minimize the
visual impact on area development, the communications tower should be gray or another
neutral color, a monopole design and should not be lighted (Condition 3).
Consistent with past actions on similar facilities and to ensure that the tower does not
become a maintenance problem or an eyesore, the tower should be removed at such time
that it ceases to be used for communications purposes. (Condition 4)
CONCLUSION
The proposal conforms to the Public Facilities Plan which suggests that communications towers
should be located to minimize the impact on existing or future areas of development. In
4
07SN0346-AUG22-CPC
addition, the Plan encourages locating such facilities in industrial or remote areas so as to
minimize impacts on existing and future area development. As previously noted, the site is
within an area of existing commercial and industrial development. The Tower Siting Policy
suggests towers should be located away from existing or planned areas of residential,
recreational or similar types of development.
As conditioned, the visual impact of the proposed tower on surrounding areas will be minimized.
The Ordinance minimizes the possibility of any adverse impact on the County Communications
System or the County Airport
Given these considerations, approval of this request is recommended.
CASE HISTORY
Planning Commission Meeting (7/17/07):
The applicant accepted the recommendation. There was no opposition present.
On motion of Mr. Wilson, seconded by Mr. Bass, the Commission recommended approval
subject to the conditions on page 2.
AYES: Messrs. Geck:er, Gulley, Bass and Wilson.
ABSENT: Mr. Litton.
The Board of Supervisors, on Wednesday, August 22, 2007, beginning at 6:30 p.m., will tak:e
under consideration this request.
5
07SN0346-AUG22-CPC
This page is blank:.
~'J
I
.........
.........
.........
...
-..."...
(j)
-+-'
(1.)
(1.)
u..
o
o
(0
...
...
...
...
~
~
...~
,''''~ #
~ ~ #
~ ~#
~ ~
~ ,
~,
o
CD
~
M ·
0::)
z.
U
CJ)s
~illillj
o
o
(0
\
~'v
...-1
/
This page is blank:.