Loading...
02SN0142-Dec19.pdfDecember 19, 2001 BS STAFF'S REQUEST ANALYSIS AND RECOMMENDATION 02SN0142 Linda E. and Jeffrey L. Bateman Dale Magisterial District 5512 Iron Bridge Road REQUEST: Rezoning from Residential (R-7) to Agricultural (A) with Conditional Use to permit a contractor's office and Conditional Use Planned Development to permit exceptions to bulk requirements (number of parking spaces, side yard setbacks and driveway width) and to development standards (paving of drives and parking). PROPOSED LAND USE: A contractor's office is planned. Specifically, the applicant plans to convert an existing single family residence for office use and to construct a garage for storage and parking of vehicles associated with the use. PLANNING COMMISSION RECOMMENDATION RECOMMEND APPROVAL AND ACCEPTANCE OF THE PROFFERED CONDITIONS ON PAGES 2 AND 3. AYES: Messrs. Marsh, Litton, Cunningham and Gulley ABSENT: Gecker STAFF RECOMMENDATION Recommend approval for the following reasons: Providing a FIRST CHOICE Community Through Excellence in Public Service mo The Central Area Plan suggests the property is appropriate for a mix of uses to include professional, business, industrial and administrative offices. Although a contractor's office is generally considered a commercial use, the recommended condition and proffered conditions limit the scale, character and intensity of this operation to that of a business office; therefore, the proposed use conforms with the Plan. Existing development standards and proposed conditions further ensure land use compatibility with existing and anticipated area residential and office development. The proposed exceptions to development standards and bulk requirements are appropriate given that the use is temporary. (NOTE: CONDITIONS MAY BE IMPOSED OR THE PROPERTY OWNER MAY PROFFER CONDITIONS. THE CONDITIONS NOTED WITH "STAFF/CPC" WERE AGREED UPON BY BOTH STAFF AND THE COMMISSION. CONDITIONS WITH ONLY A "STAFF" ARE RECOMMENDED SOLELY BY STAFF. CONDITIONS WITH ONLY A "CPC" ARE ADDITIONAL CONDITIONS RECOMMENDED BY THE PLANNING COMMISSION.) CONDITION (STAFF) A fifty (50) foot buffer shall be provided along the western property line. This buffer shall comply with the requirements of Sections 19-520(a), 19-521 (a), (b), (e), (f), (h) and 19-522(a)(2) of the Zoning Ordinance. (P) PROFFERED CONDITIONS (STAFF/CPC) 1. The following conditions not withstanding, the plan prepared by Balzer and Associates, dated October 10, 2001 and entitled "Ironbridge Road Master Plan" and the Textual Statement dated October 29, 2001 shall be considered the Master Plan. (P) (STAFF/CPC) 2. This Conditional Use shall be granted for a period of no more than ten (10) years from the date of approval and shall be limited to Bateman Heating & Air for their use only and shall not be transferable nor run with the land. (P) (STAFF/CPC) 3. There shall be no signs to identify this use. (P) (STAFF/CPC) 4. There shall be no outside storage. (P) (STAFF/CPC) 5. There shall be no dumpsters. (P) 2 02SN0142/WP~EC 19K (STAFF/CPC) There shall be no deliveries by any vehicle exceeding 4,000 pounds net weight and having more than two (2) axles. (P) (STAFF/CPC) This use shall not be open to the public or employees between the hours of 5:00 p.m. and 7:00 a.m. Monday through Friday, nor between 5:00 p.m. on Friday and 7:00 a.m. on Monday. This condition would not preclude individual employees from performing office work, such as paper work and phone calls, during other hours. (P) (STAFF/CPC) 8. Except for security lighting, there shall be no exterior lighting. (P) (STAFF/CPC) With the exception of normal maintenance and improvements necessary to meet the building code there shall be no additions or exterior alterations to the structure to accommodate this use, other than the additional garage as shown on the Master Plan. Such garage shall be architecturally compatible with the existing dwelling on the property, as required by Section 19-570 of the ordinance for buildings within the same project. (P) (STAFF/CPC) 10. Driveways and parking areas shall have a minimum surface of six (6) inches of No. 21 or 2lA stone. The perimeter of driveways and parking areas shall be delineated by permanent means such as bumper blocks, railroad ties, timbers or similar such treatment as required by the Planning Department. (P) (STAFF/CPC) 11. Prior to any site plan approval, sixty (60) feet of right-of-way on the west side of Route 10, measured from the centerline of that part of Route 10 immediately adjacent to the property, shall be dedicated free and unrestricted, to and for the benefit of Chesterfield County. (T) (STAFF/CPC) 12. Direct access from the property to Route 10 shall be limited to one (1) entrance/exit. The exact location of this access shall be approved by the Transportation Department. (T) GENERAL INFORMATION Location: West line of Iron Bridge Road, north of West Rock Spring Drive and is better known as 5512 Iron Bridge Road. Tax ID 776-685-1845 (Sheet 11). 3 02SN0142/WP~EC19K Existing Zoning: R-7 Size: 1.3 acres Existing Land Use: Single family residence Adjacent Zoning and Land Use: North, South and West - R-7; Single family residential or vacant East - R-TH with Conditional Use Planned Development; Multi-family residential or vacant UTILITIES Public Water System: There is an existing sixteen (16) inch water line extending along the western side of Iron Bridge Road, adjacent to the request site. The existing structure is connected to the public water system. Use of the public water system is required by County Code. Public Wastewater System: There is an existing twelve (12) inch wastewater trunk line extending along the western side of Iron Bridge Road, adjacent to the request site. The existing structure is connected to the public wastewater system. Use of the public wastewater system is required by County Code. ENVIRONMENTAL Drainage and Erosion: The property drains east to Route 10 and then via storm sewer systems and tributaries to Falling Creek Reservoir. Currently, there are no known on- or off-site drainage or erosion problems and none are anticipated after development. 4 02SN0142/WP~EC 19K PUBLIC FACILITIES Fire Service: This property is currently served by the Dale Fire/Rescue Station, Company 11. This use will have a minimal impact on tim/rescue services. When the property is developed, the number of hydrants and quantity of water needed for fire protection will be evaluated during the plans review process. Transportation: This request will permit the operation of a contractor's office on the property for a period of no more than ten (10) years (Proffered Condition 2). The applicant has proffered that there will be no additions or exterior alterations to the existing structure on the property, other than the construction of a new garage as indicated on the Master Plan (Proffered Condition 9). Based on general office trip rates, development could generate approximately thirty (30) average daily trips. These vehicles will be distributed along Iron Bridge Road (Rome 10), which had a 2001 traffic count of 37,693 vehicles per day. The Thoroughfare Plan identifies Rome 10 as a major arterial with a recommended right of way width of 120 to 200 feet. The applicant has proffered to dedicate sixty (60) feet of right of way, measured from the centerline of Route 10, in accordance with that Plan. (Proffered Condition 11) Access to major arterials, such as Rome 10, should be controlled. The applicant has proffered to limit direct access from the property to Route 10 to one (1) entrance/exit (Proffered Condition 12). The existing driveway on the property will serve as this access. At time of site plan review, specific recommendations will be provided regarding internal circulation. LAND USE Comprehensive Plan: Lies within the boundaries of the Central Area Plan which suggests the property is appropriate for a mix of uses to include residential development of various densities, except multi-family, as well as professional, business, industrial and administrative offices. 5 02SN0142/WP/DEC 19K Area Development Trends: Property to the west has been developed as the Rock Spring Farms Subdivision. Acreage properties to the north and south are occupied by single family residential uses. Properties to the east are developed for multi-family residential uses or are vacant. The Central Area Plan anticipates continued residential and office development in this area with commercial nodes located at strategic intersections. One of the goals of the Plan is to insure that typical strip commercial development does not occur by providing transitional uses between the commercial nodes. Uses; The applicant intends to operate a contracting business from the subject property. Such uses are classified by the Zoning Ordinance as a General Business (C-5) use. However, the applicants have offered a number of proffered conditions which insure that the use has the character of a professional type office use rather than a contractor's office which tends to be a more intense use. Specifically, the proffers prohibit outside storage, limit heavy track traffic and limit hours. (Proffered Conditions 4, 6 and 7) Site Design: As indicated by the attached plan, conversion of an existing single family dwelling for the operation of a contractor's office is proposed. Also, the applicants desire to construct a garage for storage and parking of vehicles. (Proffered Condition 9) Since the proposed use is a General Business (C-5) use, although the proffered conditions limit the intensity, the applicants have agreed to limit the time period of the Conditional Use as well as preclude any additions or alterations to the existing structure, except as necessary for normal maintenance and building code compliance (Proffered Conditions 2 and 9). Proffered Conditions would allow for the construction of a detached garage for storage purposes along the southern boundary of the property, as generally depicted on the Master Plan. Such garage would be architecturally compatible with the existing dwelling on the property. The time period will allow for the reevaluation of the appropriateness of the use should the applicant wish to continue operation beyond the ten (t 0) years through a renewal of the Conditional Use. If the applicant has operated in a manner consistent with the proffers and at an intensity representative of professional office use, as suggested by the Plan, renewal may be appropriate with conditions allowing additions, but requiring compliance with current development standards such as paving and landscaping. Until a permanent use is established, it may be appropriate to allow exceptions to paving, driveway widths, setbacks and number of parking spaces. (Proffered Condition 10 and Textual Statement) The plan depicts a single access to Iron Bridge Road with a driveway accessing a parking area to the front and rear of the building. The applicants have requested an exception to the 6 02SN0142/WP/DEC 19K requirement to pave drives and parking areas (Textual Statement, Item 4). Treatment of these areas would follow Ordinance requirements for gravel surfaces without concrete curb and gutter (Proffered Condition 10). The applicant has also requested bulk exception to encroach into the required thirty (30) foot side yard setback for parking and to permit a driveway width of less than twenty (20) feet (Textual Statement, Items 1 and 2). These exceptions will permit the applicant to maintain the driveway at its current location and width and to make use of an existing paved area of the property for parking. Further, an exception to the provision of the number of parking spaces required by the Ordinance is proposed (Textual Statement, Item 3). Specifically, the Ordinance requires fifteen (15) parking spaces, calculated at one (1) space for every 200 square feet of gross floor area. The applicant proposes the provision of seven (7) parking spaces. As a contracting business where work is performed off-site with limited on-site employee contact, this proposed reduction in the number of parking spaces would be appropriate. Consistent with the temporary use and in an effort to limit the intensity of the use, there will be no outside storage, dumpsters or signs identifying this use (Proffered Conditions 3, 4 and 5). Other than security lighting, no exterior lighting will be permitted. (Proffered Condition 8) Buffers: As previously noted, properties to the north, south and west are zoned residentially and are occupied by single family residences or remain vacant. Although the Plan suggests that properties to the north and south are appropriate for office development, the Plan indicates that property to the west (Rock Spring Farms Subdivision), be maintained for residential single family use. Therefore, to minimize the visual impact of this proposed operation from this western residential development, the imposition of a fifty (50) foot buffer along the western property line of the subject property would be appropriate. (Condition) CONCLUSIONS The Central Area Plan suggests that the property is appropriate for a mix of office and residential uses. A contractor's office would typically be considered a General Business (C-5) use; however, the proffered conditions which limit the scale, character and intensity of the operation, represent the characteristics of professional office use. Given the time limitation for this Conditional Use, the renewal process will ensure the operation's continued compliance with the Plan in maintaining a professional office character. The requested exceptions to paving and setbacks for parking and drives, driveway width and number of parking spaces are consistent with a temporary use. The appropriateness of these exceptions will be reevaluated if renewal of the Conditional Use is requested. Given these considerations, approval of this request is recommended. 7 02SN0142/WP/DEC 19K CASE HISTORY Applicant (11/20/01): Proffered Condition 9 was amended to correctly reference the building code, generally. Planning Commission Meeting (11/20/01 ): The applicants indicated that the adjacent residents in Rock Spring Farms had requested that the buffer outlined in the condition recommended by staff not be imposed. It was stated that the adjacent owners felt the buffer would create security problems and that by not providing the buffer, they could easily view the property when the applicants were not on the property. There was no opposition present. Mr. Litton stated that normally a buffer would be desired adjacent to residential uses, but given the neighborhood's desires, he would not recommend the buffer. On motion of Mr. Litton, seconded by Mr. Gulley, the Commission recommended approval of this request and acceptance of the proffered conditions on pages 2 and 3. AYES: Messrs. Marsh, Litton, Cunningham and Gulley ABSENT: Mr. Gecker The Board of Supervisors on Wednesday, December 19, 2001, beginning at 7:00 p.m., will take under consideration this request. 8 02SN0142/WP~EC 19K AND ASSOCIATES, INC. J REFLECTING TOMORROW TEXTUAL STATEMENT October 29, 2001 Beverly Rogers Chesterfield County Planning Department PO Box 40 Chesterfield, VA 23832 BATEMAN HEATING & AIR BALZER PROJECT NO.: C0100111 Dear Beverly, Relative to the above referenced case, we hereby request the following bulk exceptions and development standards: 1) A fifteen (15) foot exception to the thirty (30) foot side yard setback requirement for drives and parking. 2) An eight (8) foot exception to the twenty (20) foot driveway width requiremem. 3) An eight (8) space exception to the fifteen (15) space parking requirement. 4) An exception to the paving of parking and driveway areas. If you have any questions or comments, please do not hesitate to call me at 794-0571. Sincerely, BALZER AND ASSOCIATES, INC. Andrew M. Scherzer Vice President AMS/wdj PLANNERS * ARCHDECTS * ENGINEERS · SURVEYORS 501 Branchway Road * Richmond, Virginia 23236 - (804) 794--0571 FAX (804) 794-2635 Z 30VMO].S