Loading...
01SN0201-Sept26o.pdf~,~,~,~,~+ '~1 "~fl/'~1 ~D~'~ September 26, 2001 BS STAFF'S REQUEST ANALYSIS AND RECOMMENDATION 01 SN0201 DuVal Investments, Inc. Matoaca Magisterial District Off the west line of Elko Road REQUEST: Rezoning from Agricultural (A) to Residential (R-25). PROPOSED LAND USE: A single family residential subdivision is planned. The applicant has agreed to limit development to a maximum density of 0.5 dwelling units per acre. PLANNING COMMISSION RECOMMENDATION RECOMMEND APPROVAL AND ACCEPTANCE OF THE PROFFERED CONDITIONS ON PAGES 2 THROUGH 4. STAFF RECOMMENDATION Recommend denial for the following reasons: A. Although the proposed zoning and land use conform to the Southern and Western Area Plan which suggests the property is appropriate for residential use of 1 to 5 acre lots, the application fails to address the Thoroughfare Plan with reSPect to the construction of a proposed North/South Arterial that bisects the subject property. B. The proposed land dedication addressed in Proffered Condition 9 exceeds that which is necessary and beneficial to Parks and Recreation Department for the construction Providing a FIP~T CHOICE Community Through Excellence in Public Service. of a linear trail along Swirl Creek, consistent with the recommendations of the Southern and Western Area Plan. The proffered conditions do not adequately address the impact of this development on necessary caPital facilities, as outlined in the Zoning Ordinance and the Comprehensive Plan. Specifically, the transportation, schools, parks, libraries and fire stations as identified in the Public Facilities Plan, the Thoroughfare Plan and FY 2002-2007 Capital Improvements Program and the impact of this development are discussed herein. The proffered conditions do not adequately mitigate the impact of this development on parks and schools facilities and thereby ensure that adequate service levels are maintained as necessary to protect the health, safety and welfare of County citizens. (NOTE: THE ONLY CONDITION THAT MAY BE IMPOSED IS A BUFFER CONDITION. THE PROPERTY OWNER MAY PROFFER OTHER CONDITIONS. THE CONDITIONS NOTED WITH "STAFF/CPC" WERE AGREED UPON BY BOTH STAFF AND THE COMMISSION. CONDITIONS WITH ONLY A "STAFF" ARE RECOMMENDED SOLEY BY STAFF, CONDITIONS WITH ONLY A "CPC" ARE ADDITIONAL CONDITIONS RECOMMENDED BY THE PLANNING COMMISSION:) PROFFERED CONDITIONS (CPC) 1. The' applicant, subdivider, or assignee(s) shall pay the following to the county of Chesterfield at the time of building permit application for infrastructure improvements with in the service district for the property: A. $6,995.00 per dwelling unit, if paid prior to July 1, 2002; or B. The mount approved by the Board of Supervisors not to exceed $6,995.00 per dwelling unit adjusted upward by any increase in the Marshall and Swift building cost.index between July 1, 2001, and July 1 of the fiscal year in which the payment is made if Paid after June 30, 2002. In the event the cash payment is not used for which proffered within 15 year of receipt, the cash shall be returned in full to the payor ($7,800.00 less $805.00 parks). (B&M) (cPc) 2. (CPC) 3. Except for timbering approved by the Virginia State Department of Forestry for the purpose of removing dead or diseased trees, there shall be no timbering on the Property until a land disturbance permit has been obtained from the Environmental Engineering Department and the approved devices installed. (EE) Development shall not exceed a density of 0.5 dwelling units per acre, (P) 2 01SN0201/WP/SEP~60 (CPC) 4. The minimum lot size shall be one (1) ac. re. (P) (CPC) 5. Dwelling units shall have a minimum gross floor area of 1600 square feet except for two (2) story units which shall have a minimum gross floor area of 2100 square feet. (P) (CPC) 6. All exposed portions of the foundation of each dwelling shall be covered with brick or stone veneer or drivit type materials. (P) (CPc) 7. The fifty (50) foot buffers required in accordance with the Subdivision Ordinance along both sides of the North/South Arterial shall be located within recorded open space. (P) (CPC) 8. A pedestrian connection shall be provided from the Property to the School property. The exact location and treatment shall be approved by the Parks and Recreation Department. This pedestrian connection shall be in addition to those sidewalks provided in accordance with the Commission's Residential Sidewalk policy. (P&R) (CPC) 9. In conjunction with the recordation of the first subdivision plat, approximately seven and eighty-one hundredths (7.8) acres, adjacent to Swift Creek as shown on the "Exhibit A", shall be dedicated, free and unrestricted, except as qualified herein, to and for the benefit of Chesterfield County. The exact boundary and acreage will be determined at the time of tentative subdivision review and approval. (P&R) (NOTE: PROFFERED CONDITION 10 HAS BEEN MODIFIED SUBSEQUENT TO THE COMMISSION'S CONSIDERATION OF THIS REQUEST. SHOULD THE BOARD WISH TO APPROVE THIS REQUEST, IT WOULD BE APPROPRIATE TO ACCEPT PROFFERED CONDITION 10, AS MODIFIED.) (CPC) 10. In cbnjunction with recordation of the initial subdivision plat, a ninety (90) foot wide right-of-way and any additional right-of-way to cross Swift Creek for the north/south arterial ("North/South Arterial") through the property, shall be dedicated, free and unrestricted, to and for the benefit of Chesterfield County. The exact location and width of this right-of-way shall be approved by the Transportation Department. (T) 10. Prior to the dedication required by proffered Condition #9, a ninety (90) foot wide fight-of-way and any additional right,of-way to cross Swift Creek for the north/south arterial ("North/South Arterial") through the property, shall 3 01SN0201/WP/SEPT260 (CPC) 11. (CPC) 12. (CPC) 13. be dedicated, free and unrestricted, to and for the benefit of Chesterfield Couhty. The exact location and width of this right-of-way shall be approved by the Transportation Department. (T) Direct access from the property to North/South Arterial shall be limited to three (3) public roads, as generally shown on Exhibit A. The exact location of these accesses shall be approved by the Transportation Department. (T) To.provide an adequate roadway system, the developer shall be responsible for the following: a. Construction of two (2) lanes of North/South Arterial, to VDOT Urban Minor Arterial Standards (50 mph) with modifications approved by the Transportation Department, from the southern property line northward for a distance of approximately 2000 linear feet~ as generally shown on Exhibit A. The exact length of this road shall be approved by the Transportation Department. In addition, a cash payment of $200.00 per linear feet shall be provided to Chesterfield County towards construction of the section of the North/South Arterial from.the northern terminus of the developer's construction of the North/South Arterial to the northern property line of the required site. b. Construction of additional pavement along North/South Arterial at each approved access to provide left and right mm lanes, if warranted based on Transportation Department standards; and c. Dedication to Chesterfield County, free and unrestricted, any additional right-of-way (or easements) required for the improvements identified above. (T) Prior to any construction plan approval, a phasing plan for the required road improvements, as identified in Proffered Condition 12, shall be submitted to and approved by the Transportation Department. (T) GENERAL INFORMATION Location: Offthe west line of Elko Road, north of Vinewood Drive. Tax ID 784-629-7820 (Sheet 41). Existing Zoning: A 4 01SN0201/WP/SEPT260 Size: 135 acres Existing Land Use: Vacant Adjacent Zoning and Land Use: North - A; Single family residential or vacant South - A; Public School (new Matoaca High School) East - R-88 and A; Single family residential or vacant West - A; Vacant UTILITIES Public Water System: There is a twelve (12) inch water line now under construction in conjunction with the new Matoaca High School, approximately 2,300 feet south of this site: This twelve (12) inch water line extends along the Matoaca High School access road. The request site is Within the Southem and Western Area Land Use Plan area which requires use of the public water system. Use of the public water system is required by County Code. The applicant is committed by recorded sales agreement (D.B. 3289, Pg. 611) to pay their proportionate share of the cost of extending an off-site sixteen (16) inch water line along Woodpecker Road from Bixby Lane to the access road at the new Matoaca High School. This sixteen (16) inch water line was designed to Serve the new Matoaca High School as well as the applicants' site. The developer's share Of the water line cost is to be made to the County at such time as the applicant sells any portion of the request site, or a requestis made for connection to public water. Public Wastewater 'System: The public wastewater system is not available to serve the request site. The request site is within that portion of the Southern and Western Area Land Use Plan area that permits the USe of private septic systems. Use of private septic systems is intended. 5 01SN0201/WP/SEFI'260 Private Septic System: To date, the Health Department has not received any soils analysis for the property. Prior to recordation of the subdivision plat, the developer must submit soils analysis for each lot to the Health Department for review and approval. ENVIRONMENTAL Drainage and Erosion: There are currently no on- or off-site erosion problems. The property is heavily wooded and, as such, should not be timbered until the issuance of a land disturbance permit. This will ensure that proper erosion control measures are in place prior to any timbering. (Proffered Condition 2) Water Quality: The property is bounded by Swift Creek to the north and by an unnamed perennial stream to the east. The property drains into Swift Creek or the adjacent perennial stream. It should be noted that these perennial streams are subject to 100 foot conservation areas. PUBLIC FACILITIES The need for fire, school, library, park and transportation facilities is identified in the Public Facilities Plan, the Thoroughfare Plan and the FY 2002-2007 Capital Improvement Program. This development will have an impact on these facilities. Fire Service: Based on a maximum of sixty-seven (67) dwelling units, this request will generate approximately twenty-four (24) calls for fire and rescue service each year. The impact on these facilities has been addressed. (Proffered Condition 1) ThiS property is currently served by Fire Station 12 in Ettrick. Emergency medical service is provided by Fire/Rescue Station 8 and Ettrick-Matoaca Volunteer Rescue squad in Matoaca. When the property is developed, the number of hydrants and quantity of water needed for fire protection will be evaluated during the plans review process. Currently, the Subdivision Ordinance requires that when the cumulative total of homes served by a local street exceeds fifty (50), a second public road access to all dwellings be provided or that a no lot frontage collector road be constructed through the development. This requirement is necessary to provide emergency vehicles a second access to homes should one (1) access become blocked. The proffered conditions relative to the construction 6 01SN0201/WP/SEPT260 of the North/South Arterial fails to satisfy the requirements of the Subdivision Ordinance for a no lot frontage road through the development since the construction terminates south ofthe northern property line. (Proffered Condition 12.a.) Schools: Approximately thirty-seven (37) school age children will be generated by this development. The site lies in the Ettrick Elementary School attendance zone: capacity - 650, enrollment - 536; Matoaca Middle School zone: capacity - 720, enrollment - 544; and Matoaca High School zone: capacity - 820, enrollment - 672. This development will have an impact on area schools. The applicant has not agreed to fully address the cost of providing for area school needs. (Proffered Condition 1) Libraries: Consistent with Board of Supervisors' policy, the impact of development on library services is assessed County-wide. Based on projectedpopulation growth, the Public Facilities Plan identifies a need for additional library space throughout the County. Taking into account the additional space provided by the two (2) currently funded projects, the new La Prade and Chester Libraries, there is still a projected need for 55,000 additional square feet of library space County-wide by 2015. The impact on library needs has been adequately addressed. (Proffered Condition 1) Parks and Recreation: The Public Facilities Plan identifies the need for two (2) new regional parks. The Plan identifies the need for 116 acres of community park space by 2015. The Southern and Western Area Plan recommends the preservation of linear parks along Swift Creek and other tributaries of the Swift Creek Reservoir. These stream corridors provide long natural open spaces that can easily acco ,mmodate hiking trails while supplying needed park acreage in the area. Therefore, to preserve these natural waterways, protect water quality and provide fOr greenways, cOnsideration should be given to provision of a thirty 00) foot easement to accommodate construction ora trail along Swift Creek through the northern limits of the property for the purpose of developing this linear park system. The exact location would be determined at the time of subdivision review to insure that topographic conditions and other natural land features would accommodate this proposed pedestrian trail within the limits of dedication. The applicant has proffered to dedicate a 7.8 acre tract adjacent to Swift Creek, as shown on the attached plan (Proffered Condition 9). This area exceeds what has been determined to be usable by the County for the establishment of the linear trailsyStem.' Further, the property's 7 01SN0201/WP/SEPT260 predominately encompassed by floodplain/wetlands, thereby hindering Parks and Recreation's ability to use the excess property. The Parks and Recreation Department recommends that this proffer not be accepted. Therefore, the impact on Parks and Recreations facilities has not been adequately addressed (Proffered Condition 1). As an alternative, staff would entertain a proposal to dedicated land or grant an easement which would, be of sufficient width, and at an acceptable location, to accommodate a linear trail. The applicant has proffered the provision ora pedestrian connection from this development to the new Matoaca High School to facilitate access to future areas of activity (Proffered Condition 8). This sidewalk would be in addition to those provided in accordance with the Commission's Residential Sidewalk Policy. Transportation: The applicant has proffered a maximum density of 0.5 units per acre (Proffered Condition 3). This proffer would permit development of sixty-seven (67) residential units on the property. Based on single family trip rates, this development could generate approximately 720 average dailY trips. These vehicles will be distributed through the adjacent property to the south (site of the new Matoaca High School) to Woodpecker Road whichhad a 200Otraffic count of 3,937 vehicles per day. The Thoroughfare Plan identifies a north-south major arterial ("the North/South Arterial"), with a recommended fight of way width of ninety (90) feet, extending through the property. Staff does not support this zoning request, because the applicant is unwilling .to commit to providing the entire North/South Arterial through the subject property.. The North/South Arterial is a proposed major north-south roadway for this area of the County. The road is planned to extend from River Road, north to Branders Bridge Road. The site of the new Matoaca High School is located south/south,east of the subject property. As part of Substantial .Accord approval for the new school, conditions were imposed that required the dedication of a ninety (90) foot wide right of way~ and construction of tWo (2) lanes for the North/South Arterial through the school property. The ninety (90) foot wide fight of way has been dedicated across the eastern end of that property, and school administration is committed to its construction. This right of way stubs into the southern boundary of the subject property. The centefline of Swift Creek forms the northern boundary of the Subject property. The applicant has proffered to dedicate a ninety (90) foot wide right of way and any additional right of way to cross Swift Creek for the North/South Arterial (proffered Condition 10). The applicant has also proffered to dedicate 7.8 acres adjacent to Swift Creek, as shown on Exhibit A (Proffered Condition 9)..The intent of this dedication is for that property to serve as part of the Parks and Recreation Department's Greenway system. If this land dedication becomes a park/greenway, it may be very difficult to construct the North/South Arterial across Swift Creek. SUbsequent to the Planning Commission's public 8 01SN0201/WP/SEPT260 hearing, the applicant amended Proffered Condition 10 to ensure that the dedication of right of way for the North/South Arterial occurs prior to the park dedication. The applicant is not willing to provide for the construction of the North/South Arterial through the entire length of the subject property. The applicant has proffered to construct two (2) lanes of North/South Arterial from the Southem property line, north for a distance of approximately 2,000 feet, as generally shown on Exhibit A (Proffered Condition 12.a.). This proffer does not provide for the construction of approximately 250 feet. of the North/South Arterial at the northern boUndary of the subject property and across part of Swig Creek. Constructing the North/South Arterial across Swift Creek will require a substantial structure, probably a bridge. As an alternative to constructing this section of the North/SOuth Arterial, the applicant could provide funds to the CoUnty for the total cost of the construction including the cost for a section of the bridge that is within the 'boUndary of the subject property. These funds could later be applied towards constructing the entire bridge structure for the North/South Arterial across Swift Creek. The applicant has proffered to contribute $200.00 per linear foot for the section of the North/South Arterialthat will not be constructed by the developer. These funds are not sufficient to cover the cOst of the furore bridge section. Access to major arterials, such as the North/South Arterial, should be controlled, The applicant has proffered that direct access to this road willbe limited to three (3) public roads, as generallY shown on Exhibit A (Proffered Condition 11). The applicant has also prOffered to construct left and right mm lanes along the North/South Arterial at each approved access, if warranted based on Transportation Department standards. (Proffered Condition 12.b.) The Thoroughfare Plan identifies the need to improve existing roads, as well as construct new roads to accommodate growth. Area roads need to beimproved to address safety and accommodate the increase in traffic generated by this development. The applicant has proffered to contribute cash towards mitigating this traffic impact. (proffered Condition 1) Since adoption of the Thoroughfare Plan in 1989 by the Board' of Supervisors, staff has consistently recommended that roads identified on the Plan be constructed through the entire boundary of each p~oposed development. Without a commitment to provide for the entire construction of the North/South Arterial through the subject property, the TranspOrtation Department cannot support this request. 9 01SN0201/WP/SEPT260 Financial Impact on Capital Facilities: PER UNIT Potential Number of New Dwelling Units 67 * 1.00 Population Increase 182.91 2.73 Number of New Students Elementary . 16.35 0.24 Middle 8.71 0.13 High 10.72 0.1'6 TOTAL 35.78 · 0~53 Net Cost for School.s 240,932 3,596 Net Cost for Parks ' 54,404 812 Net Cost for Libraries ' 18~894 282 Net Cost for Fire Stations 21,105 315 Average Net Cost for Ro~ds 191,821 2,863 TOTAL NET COST I 527'156 1 7,868 *Based on a proffered density of 0.5 dwelling units per acre. (Proffered Condition 3) As noted, this proposed development will have an impact on capital facilities. Staffhas calculated the fiscal impact of every new dwelling unit on schools, roads, parks, libraries and fire stations at $7,868 per unit. The applicant has been advised that a maximum proffer of $7,800 per unit would defray the cost of the capital facilities necessitated by this proposed development. The applicant has offered $6,995.00 per unit and the dedication of a approximately 7.8 acresto assist in defraying the cost of this proposed development on the school~ road, park, library and fire station facilities (Proffered Conditions 1 and 9). The applicant has proffered the dedication of more land than what is useable as described in the Parks and Recreation section of this report. The applicant has also placed a value on the land in excess at' its fair market assessed value and what has been calculated in accordance with the Board's policy. These proffers are insufficient to address the impacts resulting from the proposed development as further described by specific departments in the 10 01SN0201/WP/SEPT260. doc applicable sections of this request analysis. Accordingly, the County's ability to provide capital facilities to its citizens will be adversely impacted. The Planning Commission and the Board of Supervisors, through their consideration of this request, may determine-that there are unique circumstances relative to this case that may justify acceptance of proffers as offered. LAND USE Comprehensive Plan: Lies within the boundaries of the Southern and Western Area Plan which suggests the property is appropriate for residential use of 1 to 5 acre lots. Area Development Trends/ Properties to the north, south and west are zoned Agricultural (A) and are occupied by a single family dwelling, public/semi public uses (new Matoaca High School) or.are vacant. Property to the east is zoned Agricultural (A) and Residential (R-88) zoning and has been developed for single family residential uses or remains vacant. It is anticipated that residential development will continue in this immediate area, consistent with the Plan. The applicant has proffered a maximum density of 0.5 units per acre (Proffered Condition 3). This results in a maximum of sixty-seven (67) lots that can be developed on the subject 134 acres. Further, each lot will contain a minimum of one (1) acre. (Proffered Condition 4) Dwelling Size and Architectural Treatment: The applicant has proffered a minimum gross floor area of 1,600 square feet for all dwelling units except two (2) story units which will have a minimum of2,100 square feet. (Proffered Condition 5) The applicant has proffered conditions to address the treatment of exposed portions of the dwelling foundations. (Proffered Condition 6) Buffers: The Subdivision Ordinance requires that a fifty (50) foot buffer be maintained along each side of the proposed North/South Arterial. This buffer may be included within the boundaries of individual lots. It has been staff's experience that individual homeowners tend to clear these areas resulting in a zoning violation on that individual lot. To preserve the 11 01SN0201/WP/SEPT260 integrity of these buffers, the applicant has proffered that these areas be provided in open space, thereby becoming the responsibility of the homeowners' association. (Proffered Condition 7) CONCLUSIONS Although the proposed zoning and land use conform to the Southern and Western Area Plan which suggests the property is appropriate for residential Use of 1 to 5 acre lots, the application fails to address the Thoroughfare Plan with respect to the entire construction of a proposed North/South Arterial that bisects the subject property. The proposed 7.8 acre land dedication addressed in Proffered Condition 9 exceeds that which is necessary and beneficial to Parks and Recreation Department for the construction of a linear trail along Swift Creek consistent with the recommendations of the Southern and Western Area Plan. The proffered conditions do not adequately'address the impact of this development on necessary capital facilities, as outlined in the Zoning Ordinance and the Comprehensive Plan. Specifically, the need for transportation, s~hools, parks, libraries and fire stations as identified in the County's adopted Public Facilities Plan and FY 2002-2007 Capital Improvements PrOgram and the impact of this development is discussed herein. The proffered conditions do not adequately mitigate the impact of this development on schools and parks facilities and thereby ensure that adequate service levels are maintained as necessary to protect the health, safety and Welfare of County citizens Given these considerations, denial of this request is recommended. CASE HISTORY Planning Commission Meeting (8/21/01): The applicant accepted the Planning Commission's recommendation. There was opposition present. The individual in opposition expressed concerns relative to increased traffic on Woodpecker Road; the need to address improvements on this rOad; lack of notification of non-adjacent property owners of meetings on this case; lack of time to review modifications. to proffered conditions, There was discussion relative to the proposed North/SouthArterial; the County's policy with respect to developers building portions of Thor0ughfare roads :located within their property; the construction costs associated with the North/South Arterial through the subject property, including the creek crossing; and the alternative of providing funds to the County to cover the cost of this construction at a future time. 12 01SN0201/WP/SEPT260 Mr. Gecker express, ed reservations in acting on this case due to neighborhood concerns. Messrs. Gulley and Cunningham expressed concern relative to the transportation network. Mr. Marsh indicated the proposed developmem should be one of quality, would blend well with the neighborhood and was comfortable moving forward with the application. Mr2 Litton indicated that he was also comfortable acting on this reqUest. On motion of Mr. Marsh, seconded by Mr. Litton, the Commission recommended approval of this request and acceptance of the proffered conditions on pages 2 through 4. AYES: Messrs. Marsh, Litton and Cunningham ABSTENTIONS: Messrs. Gecker and Gulley Matoaca Supervisor, Area Citizens, Applicant, and Staff (9/17/01): A meeting was held to discuss the proposed rezoning. Concerns were expressed relative to the requested "R-25" zoning classification with proffered conditions limiting density and lot sizes in lieu of the "R-88" zoning classification, as suggested by the Plan. The Board of Supervisors, on Wednesday, September 26, 2001, beginning at 7:00 p.m., will take under consideration o,f this request. 13 01SN0201/WP/SEPT260 / / / / / / / / / / / / / / / / ,/ / / / /- \ / Matoaca .High SchoOl N 1000 1000'Feet A 01SN0201 Rez: A TO R-25 SH. 0 CD CD 0 CD !1 OISAIOZO I-I -I ! .COUNTY THOROUGHFARE PLAN J( 01SN0201 - 2~ / / ! ! ! ! ! ! ! ! ! *~FT C~EK I I NEW MATOACA HIGH SCHOOL zl -1-I ! ! COUNTY THOROUGHFARE PLAN o15N0~o1-3,