Loading...
08SN0168 January 15, 2008 CPC February 27, 2008 BS STAFF?S REQUEST ANALYSIS AND RECOMMENDATION 08SN0168 Richmond 20 MHz LLC Clover Hill Magisterial District North line of Arboretum Parkway REQUEST:Conditional Use to permit a communications tower in a Corporate Office (O-2) District. PROPOSED LAND USE: A communications tower designed as a flagpole is planned to be located on top of an existing building. PLANNING COMMISSION RECOMMENDATION RECOMMEND APPROVAL SUBJECT TO THE CONDITIONS ON PAGE 2. STAFF RECOMMENDATION Recommend approval for the following reasons: The tower designed as a flagpole conforms to the Tower Siting Policy which A. suggests that towers in the vicinity of existing or planned areas of development should possess design features that maskthe utilitarian nature of the tower. B.The recommended conditions will further minimize the impact on area development. (NOTE: CONDITIONS MAY BE IMPOSED OR THE PROPERTY OWNER MAY PROFFER CONDITIONS. THE CONDITIONS NOTEDWITH "STAFF/CPC" WERE AGREED UPON BY BOTH STAFF AND THE COMMISSION.CONDITIONS WITH ONLY A "STAFF" ARE Providing a FIRST CHOICE community through excellence in public service RECOMMENDED SOLELY BY STAFF. CONDITIONS WITH ONLY A "CPC" ARE ADDITIONAL CONDITIONS RECOMMENDED BY THE PLANNING COMMISSION.) CONDITIONS (STAFF/CPC)1.The flagpole/tower shall be located as generally depicted on the plans and elevations prepared by Clough Harbour & Associates LLP, titled NTELOS I.D: RMB-0041 Arboretum and identified as Exhibits A and B in the ?Request Analysis and Recommendation?. (P) (STAFF/CPC)2.The color, design and lighting system for the tower shall be as follows: a.The tower shall be gray or another neutral color, acceptable to the Planning Department. b.The tower shall be designed and erected as a flagpole atop the existing building and shall not exceed an elevation of 105 feet above ground level. c.The tower shall not be lighted. (P) (STAFF/CPC)3.At such time that the towerceases to be used for communications purposes for a period exceeding twelve (12) consecutive months, the owner/developer shall dismantle and remove the tower and all associated equipment from the property. (P) GENERAL INFORMATION Location: Northwest quadrant of Arboretum Parkway and Arboretum Place and known as 300 Arboretum Place. Tax ID 753-704-9059 (Sheets 6 and 7). Existing Zoning: O-2 with Conditional Use Size: 8.0 acres Existing Land Use: Office and Public/semi-public (communications tower) 2 08SN0168-FEB27-BOS-RPT Adjacent Zoning and Land Use: North ? O-2, C-3 and C-5; Office and commercial South and East ? O-2; Office West ? R-7 and O-2; Multifamily residential and office UTILITIES; PUBLIC FACILITIES;TRANSPORTATION AND ENVIRONMENTAL This request will have no impact on these facilities. COUNTY COMMUNICATIONS The Zoning Ordinance requires that any structure over eighty (80) feet in height be reviewed by the County?s Public Safety Review Team for potential detrimental impacts the structure could have on the County?s Radio Communications System microwave paths. This determination must be made prior to construction of the communications tower. COUNTY AIRPORT A preliminary review of this proposal indicates that, given the approximate location and elevation of the proposed installation, it appears there will be no adverse affect on the County Airport. LAND USE Comprehensive Plan: The request property lies within the boundaries of the Northern Area Plan which suggests the property is appropriate for office use. ThePublic Facilities Plan, an element of the Comprehensive Plan, suggests that communications tower locations should generally be located to minimize the impact on existing or future areas of development. Also, the Tower Siting Policy suggests that towers in the vicinity of existing or planned areas of development should possess design features that maskthe utilitarian nature of the tower. Area Development Trends: The subject property is occupied by an office building in the Arboretum Office Park. Adjacent properties are zoned and developed for a mix of residential, office and commercial uses, within and adjacent to the Arboretum. It is anticipated that office uses will continue in the area, as suggested by the Plan. 3 08SN0168-FEB27-BOS-RPT Development Standards: To ensure that the equipmentassociated with the tower does not become a maintenance problem or an eyesore, the equipment should be removed at such time that the tower ceases to be used for communications purposes. (Condition 3) CONCLUSIONS The tower designed as a flagpole conforms to the Tower Siting Policy which suggests that towers in the vicinity of existing or planned areas of development should possess design features that mask the utilitarian nature of the tower. Given these considerations, approval of this request is recommended. CASE HISTORY Planning Commission Meeting (1/15/08): The applicant accepted the recommendations. There was no opposition present. On motion of Mr. Gulley, seconded by Mr. Bass, the Commission recommended approval subject to the conditions on page 2. AYES: Messrs. Gulley, Bass, Brown, Hassen, and Waller. The Board of Supervisors, on Wednesday, February 27, 2008, beginning at 6:30 p.m., will take under consideration this request. 4 08SN0168-FEB27-BOS-RPT This page is blank. Exhibit A 08SN0168-1 This page is blank. Exhibit B 08SN0168-2